Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'eaa5282d4fb4d6bd3f33285f92a0efc6b1f227456b699945526bf731f878b6f1' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'eaa5282d4fb4d6bd3f33285f92a0efc6b1f227456b699945526bf731f878b6f1' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
NONDESTRUCTIVE TESTING MANUAL Part 4 - Ultrasonic Part 4 Part 5 Part 6 Part 7 Part 8 Part 9 Page 1 51- 53- 61- 870 EFFECTIVITY: SEE PARAGRAPH 2 FILING INSTRUCTIONS: Insert this Temporary Revision facing TASK Part 4, 51- 53- 61- 870.
Record the incorporation of this Temporary Revision on the yellow RECORD OF TEMPORARY REVISIONS sheet at the front of this volume.
Keep this Temporary Revision until Revision 45 incorporates this information into the Nondestructive Testing Manual.
DESCRIPTION:
This Temporary Revision revises TASK Part 4, 51- 53- 61- 870
INSPECTION OF THE UPPER AND LOWER WEBS AND DOUBLERS,
AND AFT WEB OF THE REPAIR ENGINE SUPPORT BEAM AT FS640.00 to introduce a new calibration reference standard (CRS) and make other miscellaneous changes.
Part 4 TEMPORARY REVISION 51- 027 TR 51- 027 of 11 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 51−53−61−870 EFFECTIVITY: SEE PARAGRAPH 2
INSPECTION OF THE UPPER AND LOWER WEBS AND DOUBLERS, AND AFT WEB OF THE REPAIR ENGINE SUPPORT BEAM AT FS640.001.
General A. Function
(1) This inspection procedure is used to detect subsurface cracks propagating in the forward−to−aft direction at the following locations:
− First outer aft row of fastener holes in the upper and lower webs of the engine support beam covered by the inner ribs, along WL119.12 and WL111.09 at BL18.00, and BL0.00 at FS640.00 − First outer forward and aft (along FS640.00) row of fastener holes in the upper and lower doubler angle horizontal flange of the engine support beam covered by the external longitudinal stiffeners, along WL119.12 and WL111.09 at BL31.41 (upper doubler angle only), BL27.50, BL22.30, BL18.00, BL13.30, BL9.50, BL4.28, and BL0.00 at FS640.00 − Lower row of fastener holes in the aft web at the upper doubler angle vertical flange of the engine support beam covered by the inner ribs at BL18.00 and BL0.00 at FS640.00 − Upper row of fastener holes in the aft web at the lower doubler vertical flange of the engine support beam covered by the inner rib at BL18.00 and BL0.00 at FS640.00 − Upper and lower row of fastener holes in the upper and lower doubler vertical flange of the engine support beam covered by the external vertical stiffeners at BL27.50 and BL9.50 at FS640.00.
NOTE: The inspection applies to both sides of the aircraft.
B. Reference Information
(1) For additional data that is necessary to do this inspection, refer to the manuals that follow:
− Nondestructive Testing Manual (NDTM), Part 1−General Information − Structural Repair Manual (SRM) − Aircraft Maintenance Manual (AMM).
(2) This inspection must be done by a Level II or Level III ultrasonic qualified individual certified to an NDT Standard approved by the National Airworthiness Authority .
C. Location
(1) The engine support beam is located in Zone 310 (Refer to NDTM Part 1, 51−01−03).
D. Access
(1) Access to the inspection area is through the aft−equipment compartment door 311BB (Refer to NDTM Part 1, 51−01−04).
(2) It is recommended that the removal of the auxiliary power unit (APU) and the complete APU enclosure be removed to gain access to the engine support beam.
E. Parts Examined in This Procedure Refer to Table 1.
TR 51- 027 Page 2 of 11 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 51−53−61−870 EFFECTIVITY: SEE PARAGRAPH 2 Table 1 − Part Identification Data ITEM NO. [1] DESCRIPTION DRAWING OR PARTNUMBER [2] MATERIAL SPECIFICATION 1 Upper web 601−35006−3 7075−T62 Al QQ−A−250/132 Lower web 601−35006−5 7075−T62 Al QQ−A−250/13 3 Aft web 601−35006−9 4 Upper doubler angle 601R−53−61−870−1 2024−T42 Al QQ−A−250/5 5 Lower doubler angle 601R−53−61−870−6 NOTE [1]: Parts that do not include an item number are not identified in Figure 2.
NOTE [2]: Numbers that do not include a dashed suffix are drawing numbers.
2. Effectivity A. All aircraft incorporating REO 601R−53−61−870.
NOTE: NDTM Part 6, 51−53−61−870 must be accomplished in order to complete the full inspection.3.
Tools and Equipment A. Use the items identified as follows, or their equivalent (Refer to NDTM Part 1, 51−20−04):
NOTE: Equivalent ultrasonic equipment may be used provided that it satisfies the requirements of this procedure and is capable of resolving the reference notch in the calibration standard at the required level of resolution.
− Ultrasonic Flaw Detector Sonatest Model: UFDS − Miniature angle beam transducer, 5.0 MHz frequency, 45 degrees refractive angle in aluminum, contact surface 0.250 in (6.35 mm) by 0.375 in (9.52 mm) VM Products Model: VM 7−121 − Coaxial cable (BNC to microdot) − Inspectech LTD Gorptech Industrial Ultrasonic Couplant Gel − MHI RJ Aviation calibration reference standard No. EXCM601R30039, similar in material and cross section as the inspection area and contains electrical discharge machined (EDM) notches − High intensity light source.
4. Preparation and Cleaning A. Prepare the inspection area as follows:
(1) Identify the location to be inspected.
(2) Open the aft−equipment compartment door 311BB to get access to the engine support beam (Refer to the AMM, Chapter 6).
(3) Remove the APU and the complete APU enclosure (Refer to the AMM, 49−11−01−000−801).
TR 51- 027 Page 3 of 11 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 51−53−61−870 EFFECTIVITY: SEE PARAGRAPH 2 WARNING: MAKE SURE THAT THERE IS A GOOD FLOW OF CLEAN AIR AND SUFFICIENT FIRE PROTECTION. USE APPROVED BODY PROTECTION WHEN YOU USE SOLVENTS. ALL SOLVENTS ARE POISONOUS AND SOME ARE FLAMMABLE.
(4) Clean the inspection surfaces (Refer to the SRM, 51−26−00).
NOTE: It is not necessary to remove the finish from the parts unless it shows deterioration or local damage.
(5) If the finish in the area to be inspected is damaged or deteriorated, remove the finish (Refer to the SRM, chapter 51).
5. Inspection for Subsurface Cracks Initiating From the First Forward Row of Fasteners in the
0.032−in (0.81−mm) Thick Section of the Upper and Lower Webs Along WL119.12 and WL111.09 at BL0.00, FS640.00 A. Equipment Calibration Refer to Figure 1.
(1) Calibrate the ultrasonic equipment as follows:
(a) Connect the transducer (VM 7−121) with the coaxial cable to the ultrasonic instrument.
(b) Turn the power ON and set the instrument to pulse−echo test mode and 5 MHz test frequency.
(c) Apply an even layer of couplant gel on the 0.032−in (0.813−mm) thick section of the −3 web adjacent to the −4 and −5 angles (0.62−in (15.75−mm) edge distance side) of reference standard EXCM601R30039.
(d) Do the instrument calibration on the reference standard as follows:
1 Place the front of the transducer against the −4 angle so that the sound beam is directed at EDM notch A (Notch Echo A (NEA)) (Refer to Transducer Placement 1 in Figure 1). Manipulate the transducer by swiveling the transducer toward and away from the NEA to obtain a maximized reflection signal.
2 Adjust the GAIN to obtain a 100% full screen height (FSH) signal from NEA.
3 Use the DELAY and RANGE controls to set the leading edge of the reflection signal from NEA at 20% of the horizontal limit on the baseline.
TR 51- 027 Page 4 of 11 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 51−53−61−870 EFFECTIVITY: SEE PARAGRAPH 2 rnd5361870_001.dg, lr/yf, 25/02/05
0.62 in.
(15.75 mm)
0.62 in.
(15.75 mm)
TRANSDUCER PLACEMENT 1 A B
TRANSDUCER PLACEMENT 2 −3 WEB CALIBRATION REFERENCE STANDARD EXCM601R30039
AND TRANSDUCER PLACEMENT
CHEM MILL LINE (REF)
0.050 in.
(1.27 mm)
0.25 in.
(6.35 mm) −4 ANGLE −5 ANGLE −3 WEB
EDM NOTCH NEA
CRT DISPLAY IP EFH IP NEB TRANSDUCER PLACEMENT 2 50 1000 TRANSDUCER PLACEMENT 1 50 1000 NOTES 50 100
SIGNAL AMPLITUDE 50 100
SIGNAL AMPLITUDE IP = Initial pulse.
NEA = Notch echo from EDM notch A.
CRT DISPLAY
0.032 in.
(0.81 mm) (4 PLACES) NEB = Notch echo from EDM notch B.
Calibration Reference Standard EXCM601R30039 and Transducer Placement, and CRT Displays of Calibration Notch Signals Figure 1
TR 51- 027 Page 5 of 11 EFH = Echo from Fastener Hole.
Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 51−53−61−870 EFFECTIVITY: SEE PARAGRAPH 2 B. Inspection Procedure Refer to Figure 2.
(1) Do the inspection as follows:
NOTE: This inspection is performed internally via the cutout holes in the aft web.
A nonrelevant indication from the fastener hole may or may not appear when the sound beam is in line with the center of the fastener, but the indication will always appear closer to the initial pulse or left side of the CRT screen than a discontinuity indication.
(a) After calibration as outlined in paragraph 5.A., apply an even layer of couplant gel on the 0.032−in (0.81−mm) thick section of the upper and lower webs adjacent to the edge of the upper and lower rib flanges of the first forward outer row of fasteners at BL0.00, approximately at FS633.00. There are a total of two fastener locations (identified with the symbol ), one at the lower web and one at the upper web, that require inspection (Refer to Figure 2, Sheet 1 and Sheet
2).
(b) Couple the transducer to the upper web with the front of the transducer against the edge of the rib flange at BL0.00. Scan both sides of the forward outer fastener with a slight swivel movement toward and away from the fasteners.
Use the edge of the rib flange as a transducer guide.
(c) Repeat step 5.B.(b) for the fastener on the lower web.
(d) Note all relevant indications 50% FSH or greater and its location on the part.
Ensure the indication is not from the fastener hole.
C. Acceptance or Rejection Criteria
(1) Any distinct indication with an amplitude signal of 50% FSH or greater is classified as a crack and cause for rejection.
(2) Record and report results in accordance with company guidelines and policies.
(3) For indications that exceed the allowable limits, it is recommended that you contact MHIRJ Customer Support (refer to SRM 51−13−01).
6. Inspection for Subsurface Cracks Initiating From Fasteners of the Upper and Lower Webs (at BL18.00 only) and Doubler Angles and Aft Web (at BL0.00 and BL18.00) Along WL119.12 and WL111.09 at BL31.41, BL27.50, BL22.30, BL18.00, BL13.30, BL9.50, BL4.28, and BL0.00, at FS640.00 A. Equipment Calibration Refer to Figure 1.
(1) Calibrate the ultrasonic equipment as follows:
(a) Apply an even layer of couplant gel on the 0.050−in (1.27−mm) thick section of the −3 web adjacent to the −4 and −5 angles (0.620−in (15.75−mm) edge distance side) of reference standard EXCM601R30039.
(b) Do the instrument calibration on the reference standard as follows:
1 Place the front of the transducer against the −4 angle so that the sound beam is directed at EDM notch B (Notch Echo B (NEB)) (Refer to Transducer Placement 2 in Figure 1). Manipulate the transducer by swiveling the transducer toward and away from NEB to obtain a maximized reflection signal.
TR 51- 027 Page 6 of 11 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 51−53−61−870 EFFECTIVITY: SEE PARAGRAPH 2 rnd5361870_002.dg, yf, 24/02/05
VIEW LOOKING DOWN
ON TOP SURFACE LBL36.20 LBL9.50 BL0.00 LBL4.28LBL31.41 LBL27.50 LBL22.30 LBL18.00 LBL13.30 FS
625.30 FS
640.00
0.063 in. (1.60 mm)
THICKNESS
SECTION OF WEB
CHEM MILL LINE (REF)
0.050 in. (1.27 mm)
THICKNESS
SECTION OF WEB
0.032 in. (0.81 mm)
THICKNESS
SECTION OF WEB CHEM MILLLINE (REF) 4
INSPECTSYMBOL − Inspect upper web via cutout in the aft web on both sides of these fasteners.
− Inspect upper doubler angle (horizontal flange) externally on both sides around these fasteners.
TYPICAL TRANSDUCER PLACEMENT AND MOVEMENT. BOTH SIDES OF FASTENER TO BE INSPECTED.
TRANSDUCER
OF ENGINE SUPPORT BEAM LEGEND
1. Upper web.
4. Upper doubler angle.
1 Inspection Locations of the Engine Support Beam Figure 2, Sheet 1
TR 51- 027 Page 7 of 11 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 51−53−61−870 EFFECTIVITY: SEE PARAGRAPH 2 rnd5361870_003.dg, yf, 24/02/05
VIEW LOOKING UP
ON LOWER SURFACE
INSPECTSYMBOL − Inspect lower web via cutout in the aft web on both sides of these fasteners.
− Inspect lower doubler angle (horizontal flange) externally on both sides around these fasteners.
LBL18.00 LBL9.50LBL13.30 LBL4.28 FS
625.30 FS
640.00 LBL27.50 LBL22.30
0.032 in. (0.81 mm)
THICKNESS
SECTION OF WEB
0.050 in. (1.27 mm)
THICKNESS
SECTION OF WEB
0.063 in. (1.60 mm)
THICKNESS
SECTION OF WEB
OF ENGINE SUPPORT BEAM
TYPICAL TRANSDUCER PLACEMENT AND MOVEMENT. BOTH SIDES OF FASTENER TO BE INSPECTED.
TRANSDUCER LEGEND
2. Lower web.
5. Lower doubler angle.
5 2 BL0.00 Inspection Locations of the Engine Support Beam Figure 2, Sheet 2
TR 51- 027 Page 8 of 11 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 51−53−61−870 EFFECTIVITY: SEE PARAGRAPH 2 rnd5361870_004.dg, yf, 25/02/05 VIEW LOOKING FORWARD AT FS640.00
ON AFT WEB OF ENGINE SUPPORT BEAM
INSPECTSYMBOL − Inspect aft web (Covered by inner ribs) via cutout in the aft web on both sides of these fasteners.
− Inspect lower doubler angle (Vertical flange) externally on both sides of these fasteners.
− Inspect upper doubler angle (Vertical flange) externally on both sides of these fasteners.
WL
119.12 WL
111.09 LBL36.20 LBL31.41 LBL27.50 LBL18.00 LBL13.30 LBL9.50 LBL4.28 BL0.00 LBL22.30
TYPICAL TRANSDUCER PLACEMENT AND MOVEMENT. BOTH SIDES OF FASTENER TO BE INSPECTED.
TRANSDUCER LBL9.50 4 3 5 LEGEND
3. Aft web.
4. Upper doubler angle.
5. Lower doubler angle.
Inspection Locations of the Engine Support Beam Figure 2, Sheet 3
TR 51- 027 Page 9 of 11 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 51−53−61−870 EFFECTIVITY: SEE PARAGRAPH 22 Adjust the GAIN to obtain a 100% FSH signal from NEB.
3 Use the DELAY and RANGE controls to set the leading edge of the reflection signal from NEB at 20% of the horizontal limit on the baseline.
B. Inspection Procedure
(1) Inspect the 0.050−in (1.27−mm) thick sections of the upper web and aft web fastener locations as follows:
NOTE: Access to the upper web surface at BL18.00 and aft web surface at BL0.00 and BL18.00 is through the cutout holes in the aft web. The fastener locations that require inspection are identified with the symbol .
(a) After calibration as outlined in paragraph 6.A., apply an even layer of couplant gel on the 0.050−in (1.27−mm) thick section of the upper and lower webs adjacent to the edge of the rib flanges for the fasteners to be inspected at BL18.00 and for the aft web at BL18.00 and BL0.00.
(b) Couple the transducer to the upper web with the front of the transducer against the edge of the rib horizontal flange at BL18.00. Scan both sides of the fasteners with a slight swivel movement toward and away from the fastener.
Use the edge of the rib as a transducer guide (Refer to Figure 2, Sheet 1).
(c) Couple the transducer to the lower web with the front of the transducer against the edge of the rib horizontal flange at BL18.00. Scan both sides of the fasteners with a slight swivel movement toward and away from the fastener.
Use the edge of the rib as a transducer guide (Refer to Figure 2, Sheet 2).
(d) Couple the transducer to the aft web, upper corner, lower fastener with the front of the transducer against the edge of the rib vertical flange at BL0.00, with the sound beam directed toward the lower fastener to be inspected. Scan both sides of the fastener with a slight swivel movement toward and away from the fastener. Use the edge of the rib flange as a transducer guide (Refer to Figure 2, Sheet 3).
(e) Repeat step 6.B. (1) (d) for the aft web lower corner at BL0.00, upper fastener.
(f) Repeat step 6.B. (1) (d) for the aft web upper corner at BL18.00, lower fastener.
(g) Repeat step 6.B. (1) (d) for the aft web lower corner at BL18.00, upper fastener.
(h) Note all relevant indications 50% FSH or greater and its location on the part.
Ensure the indication is not from the fastener hole.
(2) Inspect the upper and lower doublers as follows:
NOTE: Access to the inspection area of the upper and lower doublers is from the exterior of the engine support beam.
The fastener locations that require inspection are identified with these symbols: , , , unless otherwise noted.
(a) After calibration as outlined in paragraph 6.A., apply an even layer of couplant gel as follows:
− On the upper doubler horizontal flange adjacent to the edge of the upper longitudinal stiffeners at the aft and forward row of fasteners to be inspected at BL31.41, BL27.50, BL22.30, BL18.00, BL13.30, BL9.50, BL4.28, and BL0.00
TR 51- 027 Refer to Figure 2.
Page 10 of 11 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 51−53−61−870 EFFECTIVITY: SEE PARAGRAPH 2 − On the upper doubler vertical flange adjacent to the vertical stiffener flange fasteners at BL27.50 and BL9.50 − On the lower doubler horizontal flange adjacent to the edge of the lower longitudinal stiffeners at the outer aft and forward row of fasteners to be inspected at BL27.50, BL22.30, B.18.00, BL13.30, BL9.50, BL4.28, and BL0.00 − On the lower doubler vertical flange adjacent to the vertical stiffener flange fasteners at BL27.50 and BL9.50.
(b) Couple the transducer to the upper doubler horizontal flange with the front of the transducer against the edge of the longitudinal stiffener at BL31.41. Scan both sides of the fastener with a slight swivel movement toward and away from the fastener. Use the edge of the stiffener as a transducer guide.
(c) Repeat step 6.B(2)(b) on the upper doubler horizontal flange at BL27.50, BL22.30, BL18.00, BL13.30, BL9.50, BL4.28, and BL0.00.
(d) Repeat step 6.B(2)(b) on the lower doubler horizontal flange at BL27.50, BL22.30, BL18.00, BL13.30, BL9.50, BL4.28, and BL0.00.
(e) Repeat step 6.B(2)(b) for the upper doubler vertical flange, upper fastener at BL27.50 and BL9.50.
(f) Repeat step 6.B(2)(b) for the lower doubler vertical flange, lower fastener at BL27.50 and BL9.50.
(g) Note all relevant indications 50% FSH or greater and its location on the part.
Ensure the indication is not from the fastener hole.
C. Acceptance or Rejection Criteria
(1) Any distinct indication with an amplitude signal of 50% FSH or greater is classified as a crack and cause for rejection.
(2) Record and report results in accordance with company guidelines and policies.
(3) For indications that exceed the allowable limits, it is recommended that you contact MHIRJ Customer Support (refer to SRM 51−13−01).
7. Close Out A. Remove ultrasonic couplant gel from the inspection surfaces.
B. Make sure that NDTM Part 6, 51−53−61−870 has been completed.
C. If the finish in the inspection area was removed, replace the finish (refer to the SRM, Chapter 51).
D. Install the APU and the complete APU enclosure (Refer to the AMM, 49−11−01−400−801).
E. Remove all tools, equipment, and unwanted materials from the work area.
TR 51- 027 Page 11 of 11 Sep 15/23