Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '7df5ef04a3b4f4b2176f45538849be3f251a1ada94e7c954dc3fa22581132f52' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '7df5ef04a3b4f4b2176f45538849be3f251a1ada94e7c954dc3fa22581132f52' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
NONDESTRUCTIVE TESTING MANUAL Part 4 - Ultrasonic Part 4 Part 5 Part 6 Part 7 Part 8 Part 9 Page 1 53- 61- 149 EFFECTIVITY: SEE PARAGRAPH 2 TR 53- 133 TEMPORARY REVISION 53- 133 FILING INSTRUCTIONS: Insert this Temporary Revision facing TASK Part 4, 53- 61- 149.
Record the incorporation of this Temporary Revision on the yellow RECORD OF TEMPORARY REVISIONS sheet at the front of this volume.
Keep this Temporary Revision until Revision 45 incorporates this information into the Nondestructive Testing Manual.
DESCRIPTION: This Temporary Revision revises TASK Part 4, 53- 61- 149 SPECIAL
DETAILED INSPECTION OF THE ENGINE SUPPORT BEAM, FS640.00 CAP ANGLES, PREVENTATIVE OR REPAIR MODIFICATIONS to introduce a new calibration reference standard (CRS) and make other miscellaneous changes.
Part 4 of 12 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 53−61−149 EFFECTIVITY: SEE PARAGRAPH 2 SPECIAL DETAILED INSPECTION OF THE ENGINE SUPPORT BEAM, FS640.00 CAP ANGLES,
PREVENTATIVE OR REPAIR MODIFICATIONS AWL 53−61−149
1. General A. The nondestructive testing procedure that follows is for the inspection of the engine support beam for subsurface cracks in the forward to aft direction on the upper and lower surfaces, and in the vertical direction on the aft surfaces at the locations that follow:
− The upper, lower, and the aft webs, and the upper and the lower doublers at FS640.00 between WL111.09 and WL119.12 from BL0.00 to LBL36.20.
B. This inspection must be done by a Level II or Level III ultrasonic qualified individual certified to an NDT Standard approved by the National Airworthiness Authority.
C. This procedure is applicable to the left side and the right side. The procedure for the left side is given. The right side is identical as the left side.
2. Effectivity A. All aircraft Post−SB 601R−53−068 Part B.
3. Job Set−Up Information A. Tools and EquipmentR
EFERENCE DESIGNATION Epoch lll Model 2300 Ultrasonic Flaw Detector with an A−Scan presentation (Parametrics or equivalent) XA−455T Miniature angle beam transducer, 45 degrees refracted angle in Aluminum, 5.0 MHz, 0.375 in. (9.52 mm) high x 0.375 in. (9.52 mm) length x 0.260 in. (6.60 mm) width; Side Microdot Connector (TechnaNDT or equivalent) EXCM601R30039 Calibration reference standard containing electrical discharge machined notch, (MHI RJ Aviation ULC) Commercially available Coaxial cable (BNC to microdot) Commercially available Explosion proof light NOTE: If equivalent equipment is used, it must satisfy the requirements of the task and resolve the electrical discharge machined (EDM) notches of the calibration reference standard (CRS) at the required level of resolution and sensitivity.
B. Consumable Materials
REFERENCE DESIGNATION 05−178 Ultrasonic Couplant Gel (Sonotech)
TR 53- 133 Page 2of 12 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 53−61−149 EFFECTIVITY: SEE PARAGRAPH 2 C. Parts
ITEM DESCRIPTION DRAWING NUMBER MATERIAL 1 Upper Web 601−35006 7075−T62 AL ALY 2 Lower Web 601−35006 7075−T62 AL ALY 3 Aft Web 601−35006 2024−T42 AL ALY 4 Upper Doubler 601R350115 2024−T42 AL ALY 5 Lower Doubler 601R350116 2024−T42 AL ALY D. Reference Information
MANUAL NO REFERENCE DESIGNATION CSP A−010 TASK 51−20−04 (Part 1) Ultrasonic − InspectionProcedures CSP A−001 AMM 49−11−01−000−801 Removal of the APU EnclosureAssembly CSP A−001 AMM 49−11−01−400−801 Installation of the APU EnclosureAssembly E. Standard Practices Information
MANUAL NO REFERENCE DESIGNATION CSP A−001 AMM 51−25−56−390−802 Water−DisplacingCorrosion−Inhibiting Compound CSP A−008 SRM 51−13−01 Defect and Damage RepairRequests − Report Procedure CSP A−008 SRM 51−26−00 Cleaning
4. Job Set−Up A. Obey all the ultrasonic inspection procedures (TASK 51−20−04 (Part 1)).
B. Open the access door that follows:
ACCESS DESIGNATION 311BB Aft equipment compartment door C. If necessary, remove the APU enclosure assembly (AMM 49−11−01−000−801).
D. Make sure that the inspection area is clean.
E. If necessary, remove the water−displacing corrosion−inhibiting compound (CIC) with a lint−free cloth and solvent (SRM 51−26−00).
F . If the finish in the inspection area is damaged or deteriorated, remove the finish.
5. Procedure A. Do the special detailed inspection for subsurface cracks on the FS640.00 cap angles, preventive or repair modifications as follows:
TR 53- 133 Page 3of 12 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 53−61−149 EFFECTIVITY: SEE PARAGRAPH 2Refer to Figure 1 and Figure 2.
(1) Calibrate the equipment as follows:
(a) Connect the transducer with the coaxial cable to the ultrasonic instrument.
(b) Turn the instrument ON.
(c) Adjust and set the instrument controls to the calibration data settings for the CRS EXCM601R30039 at Transducer Position (TP1).
(d) Apply a thin even layer of couplant gel on the −3 web adjacent to the EDM notch A on the 0.620 in. (15.75 mm) angle edge distance side of CRS EXCM601R30039 at Transducer Position (TP1).
(e) Put the transducer on the −3 web adjacent to the −4 angle and the sound beam pointed at the EDM notch A.
(f) Move the transducer to and away with a slight swivel to get the maximum signal from the EDM notch A.
(g) Adjust the GAIN control to get 80% full screen height (FSH) signal from the EDM notch A.
(h) Adjust the RANGE and DELAY controls to set the leading edge of the reflection signal from EDM notch A at 2.6 on the horizontal time baseline.
(2) Examine the upper web (1) and the horizontal flange of the upper doubler (4) as follows:
Refer to Figure 3 (Sheet 2).
NOTE: The inspection of the upper web is done internally through the cut out holes in the aft web.
NOTE: A non−relevant indication from the fastener hole can show when the sound beam is aligned with the center of the fastener. The indication will show nearer to the initial pulse or left side of the screen than a discontinuity indication.
(a) Apply a thin even layer of couplant gel on the upper web (1) and the horizontal flange of the upper doubler (4), adjacent to the fastener identified for inspection.
(b) Position the transducer adjacent to the initial fastener of the upper web (1) with the front of the transducer against the edge of the rib flange at BL0.00.
(c) Scan forward and aft of the fastener with a small swivel movement towards and away from the fastener.
NOTE: Use the edge of the rib as a probe guide.
(d) Repeat the inspection of the upper web (1) for the fastener at BL18.00.
(e) Repeat the inspection for the horizontal flange of the upper doubler (4) for all the fasteners identified for inspection.
(3) Examine the lower web (2) and the horizontal flange of the lower doubler (5) as follows:
TR 53- 133 Page 4of 12 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 53−61−149 EFFECTIVITY: SEE PARAGRAPH 2R efer to Figure 3 (Sheet 3).
NOTE: The inspection of the lower web is done internally through the cut out holes in the aft web.
NOTE: A non−relevant indication from the fastener hole can show when the sound beam is aligned with the center of the fastener. The indication will show nearer to the initial pulse or left side of the screen than a discontinuity indication.
(a) Apply a thin even layer of couplant gel on the lower web (2) and the horizontal flange of the lower doubler (5), adjacent to the fastener identified for inspection.
(b) Position the transducer adjacent to the initial fastener of the lower web (2) with the front of the transducer against the edge of the rib flange at BL0.00
(c) Scan forward and aft of the fastener with a small swivel movement towards and away from the fastener.
NOTE: Use the edge of the rib as a probe guide.
(d) Repeat the inspection of the lower web (2) for the fastener at BL18.00.
(e) Repeat the inspection for the horizontal flange of the lower doubler (5) for all the fasteners identified for inspection.
(4) Examine the aft web (3) and the vertical flanges of the upper doubler (4) and the lower doubler (5) as follows:
Refer to Figure 3 (Sheet 4).
NOTE: The inspection of the aft web is done internally through the cut out holes in the aft web.
NOTE: A non−relevant indication from the fastener hole can show when the sound beam is aligned with the center of the fastener. The indication will show nearer to the initial pulse or left side of the screen than a discontinuity indication.
(a) Apply a thin even layer of couplant gel on the aft web (3) and the vertical flanges of the upper doubler (4) and the lower doubler (5), adjacent to the fastener identified for inspection at FS640.00.
(b) Position the transducer adjacent to the initial fastener of the aft web (3) with the front of the transducer against the edge of the rib flange at BL0.00.
(c) Scan top and bottom of the fastener with a small swivel movement towards and away from the fastener.
NOTE: Use the edge of the rib as a probe guide.
(d) Repeat the inspection of the aft web (3) for the remaining fastener at BL0.00 and BL18.00 at FS640.00.
(e) Repeat the inspection for the vertical flanges of the upper doubler (4) and the lower doubler (5) for all the fasteners identified for inspection at FS640.00.
(5) Do the indication evaluation as follows:
(a) Record all the indications of 40% FSH or greater.
(b) Compare the horizontal time baseline position of the indication with the horizontal time baseline position of the EDM notch signal on the CRS.
TR 53- 133 Page 5of 12 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 53−61−149 EFFECTIVITY: SEE PARAGRAPH 2(
c) Make sure that the indication is not from:
− the fastener hole bore − an accumulation of couplant in front of the transducer − any other non−relevant factors.
(6) Do the acceptance and rejection criterias as follows:
(a) Any relevant indication with an amplitude signal of 40% FSH or more is classified as a crack and is cause for rejection.
(7) If necessary, send a defect and damage report to MHI RJ Group (SRM 51−13−01).
6. Close Out:
A. Clean the ultrasonic couplant gel from the inspection surface (SRM 51−26−00).
B. If the finish in the inspection area was removed, replace the finish.
C. If necessary, apply water−displacing corrosion−inhibiting compound (CIC) to the applicable surfaces.
D. Remove all tools, equipment and unwanted materials from the work area.
E. If removed, install the APU enclosure assembly (49−11−01−400−801).
F . Close the access door that follows:
ACCESS DESIGNATION 311BB Aft equipment compartment door
TR 53- 133 Page 6of 12 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 53−61−149 EFFECTIVITY: SEE PARAGRAPH 2 rnd5361149_006.dg, hg, jun24/2014
SCREEN DISPLAYINSTRUMENT SETTINGS FREQUENCY 5 MHz GAIN 40.0 dB RANGE 5.0 in.
REJECT 0% THICKNESS 0 PULSER High DAMPING 400 ohms WAVEFORM Fullwave 100% 50% 80% FSH 0
VELOCITY ANGLE
DELAY/ZERO
0.1232 in./ S 45 AL 0 S
FASTENER HOLE
SIGNAL EDM NOTCHA SIGNALINITIALPULSE (IP) 123456789 1 0 Calibration Data and Instrument Settings for CRS EXCM601R30039.
Figure 1
TR 53- 133 Page 7of 12 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 53−61−149 EFFECTIVITY: SEE PARAGRAPH 2 rnd5361149_007.dg, kp, Jan. 27, 2015
0.250 in.
(6.35 mm)
EDM NOTCH (4 PLACES)
0.620 in.
(15.75 mm)
EDM NOTCH A
CHEM MILL LINE (REF) TRANSDUCER POSITION 1 (TP1) −3 WEB0.050 in.
(1.27 mm)
0.032 in.
(0.81 mm) −4 ANGLE −5 ANGLE A A A A Calibration Reference Standard EXCM601R30039 and Transducer Position Figure 2
TR 53- 133 Page 8of 12 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 53−61−149 EFFECTIVITY: SEE PARAGRAPH 2 rnd5361149_008.dg, hg, jun24/2014 FS640.00 FS625.30 FS640.00 WL111.09 WL119.12 LBL
38.00 BL
0.00 RBL
38.00 Special Detailed Inspection of the Engine Support Beam, FS640.00 Cap Angles, Preventative or Repair Modification − Inspection/Check Figure 3 (Sheet 1 of 4)
TR 53- 133 Page 9of 12 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 53−61−149 EFFECTIVITY: SEE PARAGRAPH 2
1. Upper web.
4. Upper doubler.
LEGEND Indicate scan areas Indicate inspection areas Indicate transducer positions, beam direction and movement rnd5361149_009.dg, kp, Jan. 27, 2015
VIEW LKG DOWN
ON UPPER WEB OF ENGINE SUPPORT BEAM FS640.00 FS625.30 LBL36.20 LBL31.41 LBL27.50 LBL22.30 LBL18.00 LBL13.30 LBL9.50 LBL4.28 BL0.00 1 4
SYMBOL INSPECT Examine the upper web internally through cut−outs in the aft web and the horizontal flange of the upper doubler externally both sides of these fasteners.
Examine the horizontal flange of the upper doubler externally both sides of these fasteners.
TYPICAL TRANSDUCER PLACEMENT AND MOVEMENT
BOTH SIDES OF FASTENERS TO BE INSPECTED
TRANSDUCER Special Detailed Inspection of the Engine Support Beam, FS640.00 Cap Angles, Preventative or Repair Modification − Inspection/Check Figure 3 (Sheet 2 of 4)
TR 53- 133 Page 10of 12 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 53−61−149 EFFECTIVITY: SEE PARAGRAPH 2 rnd5361149_010.dg, kp, Jan. 27, 2015 FS640.00 FS625.30 LBL27.50 LBL22.30 LBL18.00 LBL13.30 LBL9.50 LBL4.28 BL0.00
VIEW LKG UP
ON LOWER WEB OF ENGINE SUPPORT BEAM 2 5
SYMBOL INSPECT Examine the lower web internally through cut−outs in the aft web and the horizontal flange of the lower doubler externally both sides of these fasteners.
Examine the horizontal flange of the lower doubler externally both sides of these fasteners.
2. Lower web.
5. Lower doubler.
LEGEND Indicate scan areas Indicate inspection areas Indicate transducer positions, beam direction and movement
TYPICAL TRANSDUCER PLACEMENT AND MOVEMENT
BOTH SIDES OF FASTENERS TO BE INSPECTED
TRANSDUCER Special Detailed Inspection of the Engine Support Beam, FS640.00 Cap Angles, Preventative or Repair Modification − Inspection/Check Figure 3 (Sheet 3 of 4)
TR 53- 133 Page 11of 12 Sep 15/23
NONDESTRUCTIVE TESTING MANUAL Part 4 − Ultrasonic Part 4 53−61−149 EFFECTIVITY: SEE PARAGRAPH 2 rnd5361149_011.dg, hg, jun24/2014 LBL36.20 LBL31.41 LBL27.50 LBL22.30 LBL18.00 LBL13.30 LBL9.50 LBL4.28 BL0.00
3. Aft Web.
4. Upper doubler.
5. Lower doubler.
LEGEND Indicate scan areas Indicate inspection areas Indicate transducer positions, beam direction and movement
VIEW LKG FWD ON AFT WEB OF ENGINE SUPPORT BEAM AT FS640.00 5 3 4
SYMBOL INSPECT Examine the aft web internally through cut−outs in aft web both sides of these fasteners.
Examine the vertical flanges of upper and lower doublers externally both sides of these fasteners.
WL119.12 WL111.09
TYPICAL TRANSDUCER PLACEMENT AND MOVEMENT
BOTH SIDES OF FASTENERS TO BE INSPECTED
TRANSDUCER Special Detailed Inspection of the Engine Support Beam, FS640.00 Cap Angles, Preventative or Repair Modification − Inspection/Check Figure 3 (Sheet 4 of 4)
TR 53- 133 Page 12 of 12 Sep 15/23