Copy · CFM International Service Bulletin LEAP-1B-72-00-0394-01A-930A-D Issue 002 · 41 pages

© CFM International. Filed by the FAA in regulations.gov docket FAA-2024-1898; AD 2024-25-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '8226fac92cfdd757989a78265c78c14ab0522092ab60cd2c6c3163d7840355cb'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D ENGINE - FOR W ARD

COMPRESSOR ST A T OR

ASSEMBL Y (72 - 32 -

00) - ST AGE 2

COMPRESSOR ST A T OR SEAL AND ROT OR SEAL TEETH

INSPECTION

SERVICE

BULLETIN T able of contents

1.

REVISION

INFORMA TION .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

3 A.

Revision reason .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

3 B.

Revision history .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

2.

SUMMAR Y .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

4 A.

Reason .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

3.

PLANNING

INFORMA TION .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

4 A.

Applicability .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

4 B.

Concurrent requirements .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

4 C.

Reason .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

5 D.

Description .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

5 E.

Compliance .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

5 F .

Approval .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

5 G.

Manpower .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

6 H.

W eight and balance .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

6 I.

Electrical load data .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

6 J.

Software accomplishment summary .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

6 K.

Referenced documentation .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

6 L.

Documentation af fected .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

6 M.

Industry support information .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

6 N.

Interchangeability .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

4.

MA TERIAL

INFORMA TION .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

5.

ACCOMPLISHMENT

INSTRUCTIONS .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

7 A.General .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

7 B.In - Shop Corrective Action W ork - Scope Instructions .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

6.

ADDITIONAL

INFORMA TION .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

19 A.

Additional information .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

19 B.

Additional information .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

19 LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D Page 1/ 41 Issue 002 - 00 - 2024 - 01 - 23 © CFM

PROPRIET AR Y

INFORMA TION:

Subject to the restrictions on the media.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D List of tables T able:

Reasons for update .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

3 T able:

References .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

3 T able 1:

List of Suspect Parts .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

4 T able:

Support equipment .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

7 T able:

Spares .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

7 T able 2:

Serviceability Criteria .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

9 T able 3:

CFM Contact Information .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

19 T able 4:

List of Instruments .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

20 T able 5:

List of Items in Kit GE - FQAP - 802 .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

26 List of figures Figure 1 (Sheet 1/2):

Stage 2 HPC Hardware and Borescope Plug Locations with Flexible Borescope Path 12 Figure 1 (Sheet 2/2):

Stage 2 HPC Hardware and Borescope Plug Locations with Flexible Borescope Path 13 Figure 2:

Stage 2 Seals Markings V iew .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

14 Figure 3:

Optimal V iew to Honeycomb Groove .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

15 Figure 4:

3:00 and 9:00 O’Clock Area .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

16 Figure 5:

Channel - Like Cavity and Seal T eeth Rack .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

17 Figure 6:

Rub Depth Calculation .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

18 Figure 7:

Seal T eeth Inspection Areas .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

31 Figure 8:

Probe P/N US - 3313 .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

32 Figure 9:

Probe Fixture P/N JO57138 - R1 .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

33 Figure 10:

Calibration Standard and Holder , Probe and Probe Fixture .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

34 Figure 1 1:

Calibration Standard .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

35 Figure 12:

Assembly of Probe Holder Handle P/N JO58579 - R1 and ECI Probe Holder P/N JO57138 - R1 .

36 Figure 13:

Calibration Standard Holder .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

37 Figure 14:

Calibration Display - Probe P/N:

US - 3313 .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

38 Figure 15:

Form 2562 - 1 .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

39 Figure 16:

Stage 3 - 4 Blisk Inspection T echnique .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

40 Figure 17:

EC Reject Threshold .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

41 LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D Page 2/ 41 Issue 002 - 00 - 2024 - 01 - 23 © CFM

PROPRIET AR Y

INFORMA TION:

Subject to the restrictions on the media.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D CFM

PROPRIET AR Y

INFORMA TION The information contained in this document is CFM proprietary information and is disclosed in confidence.

It is the property of CFM and shall not be used, disclosed to others or reproduced without the express written consent of CFM, including, but without limitation, it is not to be used in the creation, manufacture, development, or derivation of any repairs, modifications, spare parts, design, or configuration changes or to obtain F AA or any other government or regulatory approval to do so.

If consent is given for reproduction in whole or in part, this notice and the notice set forth on each page of this document shall appear in any such reproduction in whole or in part.

The information contained in this document may also be controlled by U.S.

export control laws.

Unauthorized export or re - export is prohibited.

Reasons for update T able:

Reasons for update [TECHNICAL] T o update paragraphs

3.,

PLANNING

INFORMA TION,

4., MA TERIAL

INFORMA TION,

5.,

ACCOMPLISHMENT

INSTRUCTIONS, and

6.,

ADDITIONAL

INFORMA TION.

References T able:

References T echnical Publication LEAP - 1B - 72 - 30 - 00 - 05A - 53AA - C LEAP - 1B - 72 - 00 - 00 - 01A - 31AA - C LEAP - 1B - 72 - 32 - 00 - 05A - 53BA - C LEAP - 1B - 72 - 00 - 31 - 01A - 310A - C LEAP - 1B - 72 - 31 - 00 - 01A - 530A - C LEAP - 1B - 72 - 30 - 00 - 01A - 710A - C LEAP - 1B - 72 - 31 - 00 - 01A - 710A - C LEAP - 1B - 72 - 32 - 00 - 05A - 71BA - C Management information Manufacturer recommendation:

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

Recommended T ask type:

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

Inspection Original issue date:

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

2023 - 07 - 20

1.

REVISION

INFORMA TION A.

Revision reason to be continued ...

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D Page 3/ 41 Issue 002 - 00 - 2024 - 01 - 23 © CFM

PROPRIET AR Y

INFORMA TION:

Subject to the restrictions on the media.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D Issue Number Revision Reason 001 Baseline.

002 T o update paragraphs

3.,

PLANNING

INFORMA TION,

4., MA TERIAL

INFORMA TION,

5.,

ACCOMPLISHMENT

INSTRUCTIONS, and

6.,

ADDITIONAL

INFORMA TION.

B.

Revision history Issue Number Issue Date 001 2023 - 07 - 20

2.

SUMMAR Y A.

Reason T o improve reliability .

3.

PLANNING

INFORMA TION A.

Applicability This Service Bulletin is applicable to:

• Engine type:

LEAP - 1B

• Engine model(s):

LEAP - 1B21,LEAP - 1B23,LEAP - 1B25,LEAP - 1B27,LEAP - 1B28,LEAP - 1B28B1,LEAP - 1B28B2,LEAP - 1B28B2C,LEAP - 1B28B3,LEAP - 1B28BBJ1,LEAP - 1B28BBJ2 This Service Bulletin is applicable to these LEAP - 1B engines:

• LEAP - 1B engines, serial numbers 60A635, 60A639, 60A641 through 60A663, 60A665, 60A669, 60A670, 60A671, 60A673, 60A676 through 60A679, 60A681, 60A682, 60A686 through 60A693, 60A696, and 60A702.

These serial numbers are the best available data.

The parts listed in T able 1 below are af fected by this Service Bulletin.

T able 1:

List of Suspect Parts Part Nomenclature Part Number Manufacturer CAGE Codes Production Date Codes Stage 2 compressor stator seal (stage 2 seal) (SIN:

076N2) 2639M52G01 21023 BS, CS, DS, ES Stage 2 compressor stator seal (stage 2 seal) (SIN:

076N3) 2639M52G02 21023 BS, CS, DS, ES NOTE:

Parts of manufacturer CAGE code different than "21023" are not suspect parts.

Also, these will not be accompanied by production date codes.

B.

Concurrent requirements None.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D Page 4/ 41 Issue 002 - 00 - 2024 - 01 - 23 © CFM

PROPRIET AR Y

INFORMA TION:

Subject to the restrictions on the media.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D C.

Reason

(1) Objective:

T o improve reliability .

(2) Condition:

The suspected rotating and static parts could be subject to increased rub depth with possible stage 3 - 4 compressor rotor blisk (stage 3 - 4 blisk) seal teeth coating damage.

(3) Cause:

The suspected stage 2 seals may have been manufactured without detailed finish machining and installed into the forward stator assembly .

Suspect stage 2 seals may introduce a stock - on condition, which could create deeper rubs and mechanical damage to the mating rotors coating system during initial operations.

Concurrent presence of these conditions could introduce local material damage to rotating seal teeth from increased rub severity .

(4) Inspection:

One - time 360 - degree borescope inspection (BSI) to identify suspect parts and evaluate the condition of static and rotating seal interface.

(5) Substantiation:

Substantiation is by analysis.

D.

Description This Service Bulletin provides a recommendation to do a one - time BSI of the honeycomb structure of the suspected stage 2 seals and rotating seal teeth coating condition.

This Service Bulletin provides instructions to find the serviceability of the suspected components that failed BSI.

E.

Compliance Category 2 NOTE:

Some steps in paragraphs

3.E., Compliance and

5.,

ACCOMPLISHMENT

INSTRUCTIONS are identified as Required for Compliance (RC).

If this Service Bulletin is mandated by an Airworthiness Directive (AD), the steps identified as RC must be done to comply with the AD.

Steps not identified with RC are recommended and may be deviated from;

done as a part of other actions;

or done with accepted methods different from those given in this Service Bulletin if the RC steps can be done and the airplane returned to a serviceable condition.

RC - CFM recommends that you do this Service Bulletin as soon as possible without ef fect on revenue service but before 1,600 cycles since new (CSN) or within 60 days of the Service Bulletin issue date, whichever occurs later .

Impact A This recommendation is to address a condition that may af fect Flight Safety .

NOTE:

This Service Bulletin can be done on wing or in shop.

This Service Bulletin is of fered to improve the reliability or performance of your CFM product, or to help prevent the occurrence of the event or condition described in this Service Bulletin.

If the operator elects not to participate in the bulletin, that decision will be taken into consideration by CFM in evaluating future product performance issues that may arise in the operator ’ s fleet.

F .

Approval LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D Page 5/ 41 Issue 002 - 00 - 2024 - 01 - 23 © CFM

PROPRIET AR Y

INFORMA TION:

Subject to the restrictions on the media.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D The technical content of this Service Bulletin is approved by the F AA and under the Authority of DOA No.

EASA.21J.086.

G.

Manpower After you get access to the high pressure compressor (HPC) stage 3 BSI port (port F), you will need approximately 4 man - hours to do the inspection portion of this Service Bulletin.

H.

W eight and balance W eight and balance are not changed.

I.

Electrical load data Not Applicable.

J.

Software accomplishment summary Not Applicable.

K.

Referenced documentation American Society of Non - Destructive T esting (ASNT - TC - 1A) Air T ransport Association Specification No.

105 (A T A

105) Guidelines For T raining and Qualifying Personnel in Nondestructive T est Methods Boeing 737 - 7/8/8200/9 Aircraft Maintenance Manual (AMM) CFM LEAP - 1B Engine Illustrated Parts Catalog (EIPC), CFM - TP - 620 EIPC.21 CFM LEAP - 1B Engine Shop Manual (ESM), CFM - TP - 620 SM.21 COSAC (Comité Sectoriel Aérospatial de Certification) NAS410 - NAS Certification & Qualification of Nondestructive T est Personnel L.

Documentation affected None.

M.

Industry support information Please submit a commercial inquiry on the customer portal with D - 2348 referenced.

N.

Interchangeability Not Applicable.

4.

MA TERIAL

INFORMA TION List of material sets Not Applicable.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D Page 6/ 41 Issue 002 - 00 - 2024 - 01 - 23 © CFM

PROPRIET AR Y

INFORMA TION:

Subject to the restrictions on the media.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D List of support equipment Support equipment Name T ool Number Reference (Qty) MFR Unit $ Price (Pkg Qty) L/T Standard T ools

FLEXIBLE

BORESCOPE

(2.8 mm max.

diameter ,

2.0 m min.

cord length) - Not Applicable

(1) - - ( -) - NOTE:

Replenishment Lead T ime (L/T) in days.

NOTE:

Prices are provided for planning purposes and are subject to change.

List of supplies Not Applicable.

List of spares Spares New PN / SIN / MFR (New Qty) Unit $ Price (Pkg Qty) L/T New Part Name (CSN) 2552M03G03 / 056A2 / 07482

(1) 518,500 .00

(1) 60 BLISK, ST AGE 3 - 4

COMPRESSOR ROT OR (01 - 100 00A, 72 - 31 -

00) 2639M52G01 / 076N2 / 07482

(2) 6,941.00

(1) 5 SEAL, ST AGE 2

COMPRESSOR ST A T OR (01 - 320 00A, 72 - 32 -

00) 2639M52G02 / 076N3 / 07482

(2) 6,941.00

(1) 5 SEAL, ST AGE 2

COMPRESSOR ST A T OR (01 - 330 00A, 72 - 32 -

00) NOTE:

Replenishment Lead T ime (L/T) in days.

NOTE:

Prices are provided for planning purposes and are subject to change.

List of removed spares Not Applicable.

5.

ACCOMPLISHMENT

INSTRUCTIONS A.

General NOTE:

These accomplishment instructions refer to methods, techniques, and practices specified in other documents.

When the words "refer to" are used and there are other acceptable methods, techniques, and practices (including tools, equipment, and test equipment) those acceptable methods, techniques, practices (including tools, equipment, and test equipment) may be used to complete the work.

When the words "in accordance with" are included in the instruction, the methods, techniques, and practices specified (including tools, equipment, and test equipment) in the specified document must be used.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D Page 7/ 41 Issue 002 - 00 - 2024 - 01 - 23 © CFM

PROPRIET AR Y

INFORMA TION:

Subject to the restrictions on the media.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D

(1) Get access and remove compressor stator borescope plug (borescope plug) (SIN:

073S1, Figure 1 ) in stage 3 BSI port (port F).

Refer to the Boeing 737 - 7/8/8200/9/10 AMM, 72 - 00 - 00,

INSPECTION/CHECK, T ASK 72 - 00 - 00 - 290 - 804 - G00, Subtask 72 - 00 - 00 - 020 - 006 - G00.

(2) Do an inspection of the removed borescope plug (SIN:

073S1, Figure 1 ) in stage 3 BSI port (port F).

Refer to the Boeing 737 - 7/8/8200/9/10 AMM, 72 - 00 - 00, PREP ARA TION FOR

BORESCOPE

INSPECTION, T ASK 72 - 00 - 00 - 290 - 801 - G00, Subtask 72 - 00 - 00 - 290 - 003 - G00.

(3) RC - Do a 360 - degree BSI of the trail edge (TE) area of the stage 2 seals (SIN:

076N2 and SIN:

076N3, Figure 1 ) to verify identification markings as follows:

(a) Insert the flexible borescope through the stage 3 BSI port (port F) and guide it between the stage 2 compressor stator shrouds (stage 2 shrouds) (SIN:

071C0, SIN:

071C1, SIN:

071C2, and SIN:

071C3) TE and stage 3 - 4 compressor rotor blisk (stage 3 - 4 blisk) (SIN:

056A2) lead edge (LE) to see the aft J - hook of the stage 2 seals (SIN:

076N2 and SIN:

076N3).

NOTE:

It is necessary to insert a minimum

2.0 m long flexible borescope into the lower cavity between the HPC rotor and stator .

It is recommended that the borescope probe is

2.8 mm in diameter (maximum).

(b) Feed the flexible borescope 360 degrees along the stage 2 seals (SIN:

076N2 and SIN:

076N3) TE.

(c) Get a view of the aft J - hook of the stage 2 seals (SIN:

076N2 and SIN:

076N3) to see the identification markings, such as part number , manufacturer CAGE code, and production date code.

Refer to Figure 2 .

(d) Start the video recording on the BSI equipment.

(e) Pull the flexible borescope to do an inspection of the stage 2 seals (SIN:

076N2 and SIN:

076N3) TE markings.

Focus on manufacturer CAGE code and production date code.

Each code must be clearly visible.

Refer to Figure 2 .

NOTE:

There are four stage 2 seals (SIN:

076N2 and SIN:

076N3) segments.

There is one manufacturer CAGE code and one production date code per seal segment.

Manufacturer CAGE code marking is dot - peened and is easily readable.

Production date code is ink - marked or handwritten and could be unclear or not visible.

Refer to Figure 2 .

(4) RC - Evaluate the BSI results from paragraph

5.A.(3) and do as follows:

(a) If all four stage 2 seals (SIN:

076N2 and SIN:

076N3) segments manufacturer CAGE code and production date code are confirmed to be outside of the suspect population listed in T able 1 , BSI is complete and engine is serviceable.

NOTE:

Findings can be reported to CFM.

Contact details are specified in paragraph

6.,

ADDITIONAL

INFORMA TION.

(b) If one or more stage 2 seals (SIN:

076N2 and SIN:

076N3) segments has manufacturer CAGE code and production date code markings as listed in T able 1 or date codes markings are illegible, do as follows:

1 Reset the flexible borescope position for another 360 - degree BSI.

2 Get a view of the honeycomb structure and seal tooth of the stage 3 - 4 blisk (SIN:

056A2).

Rub track in the honeycomb must be visible.

Optimal view shown in Figure 3 .

3 Start video recording and complete a 360 - degree BSI of the rotating seal tooth and honeycomb structure interface, pay special attention to the split lines between stage 2 seals (SIN:

076N2 and SIN:

076N3) segments, located at the 3:00, 6:00, 9:00, and 12:00 o'clock areas.

Refer to Figure 4 .

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D Page 8/ 41 Issue 002 - 00 - 2024 - 01 - 23 © CFM

PROPRIET AR Y

INFORMA TION:

Subject to the restrictions on the media.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D NOTE:

During this BSI, the flexible borescope will be put in a cavity created by rotor seal tooth, honeycomb seal surface, and rotor arm of the stage 3 - 4 blisk (SIN:

056A2), which will help in flexible borescope navigation.

Refer to Figure 5 .

(5) RC - Use a frame (photo) from BSI video to estimate the rub depth on the suspected honeycomb seal segments, where the manufacturer CAGE and production date codes match the codes listed in T able 1 , or date code markings are illegible.

Post process the selected image as follows:

NOTE:

CFM can provide technical assistance in rub depth calculation in paragraph

5.A.(5)(a) through

5.A.(h).

If necessary , submit the request to CFM, refer to paragraph

6.,

ADDITIONAL INFOR- MA TION for contact details.

NOTE:

The engine can be operated until the evaluation of the BSI data is completed as specified in step

5.A.(5) and this Service Bulletin is done in accordance with paragraph

3.E., Compliance.

(a) Use a software for visual presentation aligning BSI photo as shown in example picture.

Refer to Figure 6 (Detail A).

(b) T race converging perspective lines on the BSI image.

Refer to Figure 6 (Detail A).

(c) T race contours of hexagonal honeycomb seal cells (one row) and reconstruct missing edges with perspective lines as an aid.

Refer to Figure 6 (Detail B).

(d) Measure perceived cell width (wp), perceived cell height (hp) and perceived rub depth (dp) as shown in Figure 6 (Detail C).

(e) Calculate scaling factor (SF) using measured honeycomb wp and type design cell data

(w).

Refer to Figure 6 (Detail D and Detail E).

(f) Calculate scaled honeycomb height (hp_scaled).

Refer to Figure 6 (Detail D).

(g) Calculate angle of view α (alpha) with the formula shown in Figure 6 (Detail D).

(h) Calculate scaled honeycomb rub depth (dp_scaled).

Refer to Figure 6 (Detail D).

(i) Calculate true rub depth

(d) with the formula shown in Figure 6 (Detail D).

(j) Compare true rub depth

(d) against T able 2 .

Manage the engine accordingly .

T able 2:

Serviceability Criteria Assessed rub depth CFM recommendation Within

0.030 inch

(0.76 mm) Engine is serviceable and can return to service.

BSI is complete.

Greater than

0.030 inch

(0.76 mm) Remove the engine before 2,900 CSN to further evaluate serviceability as specified in paragraph

5.B., In - Shop Corrective Action W ork - Scope Instructions.

(6) Install again the previously removed borescope plug (SIN:

073S1, Figure 1 ) in stage 3 BSI port (port F).

Refer to the Boeing 737 - 7/8/8200/9/10 AMM, 72 - 00 - 00,

INSPECTION/CHECK, T ASK 72 - 00 - 00 - 290 - 804 - G00, Subtask 72 - 00 - 00 - 010 - 01 1 - G00.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D Page 9/ 41 Issue 002 - 00 - 2024 - 01 - 23 © CFM

PROPRIET AR Y

INFORMA TION:

Subject to the restrictions on the media.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D B.

In - Shop Corrective Action W ork - Scope Instructions

(1) This section applies only if the BSI evaluation in step

5.A.(5)(j) identified rub depths beyond the serviceability criteria specified in T able 2 .

(2) Remove the forward compressor stator assembly [HPC forward stator assembly (SIN:

07000)] to enable 360 - degree inspection access to the stage 3 - 4 blisk (SIN:

056A2) forward seal teeth and mating stage 2 seals (SIN:

076N2 and SIN:

076N3) listed in T able 1 .

Refer to the LEAP - 1B ESM, 72 - 30 - 00,

DISASSEM- BLE ENGINE

MODULAR

SECTION ( Refer to:

LEAP - 1B - 72 - 30 - 00 - 05A - 53AA - C ), and do as follows:

(a) Do an inspection of the parts and modules removed for access to the stage 3 - 4 blisk (SIN:

056A2) forward seal teeth.

Refer to the LEAP - 1B ESM, 72 - 00 - 00, CHECK

INSPECTION ( Refer to:

LEAP - 1B - 72 - 00 - 00 - 01A - 31AA - C ).

(3) RC - Do an inspection of the stage 2 seals (SIN:

076N2 and SIN:

076N3) honeycomb listed in T able 1 as follows:

(a) Maximum groove depth must be less than

0.040 in

(1.02 mm) in depth.

A verage axial distance between adjacent grooves or edge must be more than

0.093 in

(2.36 mm).

(b) Damaged cells length at ends must be less than

0.125 in

(3.18 mm).

All other areas,

0.125 sq in.

(80.65 sq mm) total damage for each stage (all segments), if the damage does not go axially across the seal.

(c) Remove the unserviceable stage 2 seals (SIN:

076N2 and SIN:

076N3).

Refer to the LEAP - 1B ESM, 72 - 32 - 00,

DISASSEMBLE ENGINE

SUBASSEMBLIES ( Refer to:

LEAP - 1B - 72 - 32 - 00 - 05A - 53BA - C ).

(4) RC - Do an inspection of the forward arm seal teeth of the stage 3 - 4 blisk (SIN:

056A2, Figure 5 ) for missing coating.

Refer to the LEAP - 1B ESM, 72 - 00 - 31, VISUAL

EXAMINA TION ( Refer to:

LEAP - 1B - 72 - 00 - 31 - 01A - 310A - C ).

(5) RC - Do an eddy current inspection (ECI) of the forward arm seal teeth of the stage 3 - 4 blisk (SIN:

056A2, Figure 5 ).

Refer to paragraph

6.B., Additional information.

(6) RC - If the condition of the stage 3 - 4 blisk (SIN:

056A2, Figure 5 ) seal teeth on the forward rack is rejected as specified in the ECI inspection results from step

5.B.(5) or missing coating evaluation from step

5.B.(4) of the stage 3 - 4 blisk (SIN:

056A2), the stage 3 - 4 blisk (SIN:

056A2) is unserviceable and you must do as follows:

(a) Remove the stage 3 - 4 blisk (SIN:

056A2) from the HPC rotor assembly (SIN:

05000).

Refer to the LEAP - 1B ESM, 72 - 31 - 00,

DISASSEMBLE

PROCEDURE ( Refer to:

LEAP - 1B - 72 - 31 - 00 - 01A - 530A - C ).

(b) Remove all the stage 2 seals (SIN:

076N2 and SIN:

076N3).

Refer to the LEAP - 1B ESM, 72 - 32 - 00,

DISASSEMBLE ENGINE

SUBASSEMBLIES ( Refer to:

LEAP - 1B - 72 - 32 - 00 - 05A - 53BA - C ) and T able 1 .

NOTE:

The stage 2 seals (SIN:

076N2 and SIN:

076N3) removal is recommended to avoid damage on replaced stage 3 - 4 blisk (SIN:

056A2).

(7) Assemble the HPC module assembly (SIN:

08000), HPC forward stator assembly (SIN:

07000), and HPC rotor assembly (SIN:

05000) again as necessary .

Refer to the LEAP - 1B ESM, 72 - 30 - 00,

ASSEMBLE PRO- CEDURE ( Refer to:

LEAP - 1B - 72 - 30 - 00 - 01A - 710A - C ) and do as follows:

(a) RC - If previously removed as unserviceable, install a new or serviceable stage 3 - 4 blisk (SIN:

056A2).

Refer to the LEAP - 1B ESM, 72 - 31 - 00,

ASSEMBLE

PROCEDURE ( Refer to:

LEAP - 1B - 72 - 31 - 00 - 01A - 710A - C ).

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D Page 10/ 41 Issue 002 - 00 - 2024 - 01 - 23 © CFM

PROPRIET AR Y

INFORMA TION:

Subject to the restrictions on the media.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D

(b) RC - If previously removed as unserviceable, install a new or serviceable stage 2 seals (SIN:

076N2 and SIN:

076N3).

Refer to the LEAP - 1B ESM, 72 - 32 - 00,

ASSEMBLE ENGINE

SUBASSEMBLIES ( Refer to:

LEAP - 1B - 72 - 32 - 00 - 05A - 71BA - C ).

CAUTION:

IF YOU

REPLACE ONE OR MORE ST AGE 2 SEALS (SIN:

076N2 AND SIN:

076N3), DO A PRE -

GROOVING OF THE NEW

HONEYCOMB SEAL AND/OR A RECOA TING OF THE

INTERST AGE SEAL TEETH ON THE

ASSOCIA TED ST AGE 3 - 4 BLISK (SIN:

056A2).

DO NOT ENGAGE THE UNCOA TED

INTERST AGE SEAL TEETH WITH A NEW

HONEYCOMB SEAL.

DAMAGE T O THE ENGINE CAN OCCUR

(8) Return unserviceable stage 3 - 4 blisk (SIN:

056A2) and stage 2 seals (SIN:

076N2 and SIN:

076N3) to CFM.

Refer to paragraph

6.A., Additional information.

LEAP - 1B - 72 - 00 - 0394 - 01A - 930A - D Page 1 1/ 41 Issue 002 - 00 - 2024 - 01 - 23 © CFM

PROPRIET AR Y

INFORMA TION:

Subject to the restrictions on the media.

Page 12OCROpen in PDF

cim The Power of Flight LEAP-1B-72-00-0394-01A-930A-D

FLEXIBLE

BORESCOPE

ROUTING BORESCOPE PLUG (SIN: 073S1) (PORT F) STAGE 2 VANE (SIN: 072C0) (SIN: 072C1) STAGE 2 BLISK - A (SIN: 056A1) -STAGE 3-4 BLISK (SIN: 056A2) FWD ICN-LEAP-1B-72000394-B-07482-00001-A-001-01 Stage 2 HPC Hardware and Borescope Plug Locations with Flexible Borescope Path Figure 1 (Sheet 1 of 2) LEAP-1B-72-00-0394-01A-930A-D Page 12/41 Issue 002-00 - 2024-01-23 © CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

Pages 13–24 of 41