Copy · SB-F2000-436 · 14 pages

© Dassault Aviation. Filed by the FAA in regulations.gov docket FAA-2018-0809; AD 2018-25-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '6955db4472e82438acc784b6076869bb2a67e5d2ac8fad93d40e85dc8e051d31'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

FALCON 2000 No 436 SEPTEMBER 28, 2017

MANDATORY ATA 24-24

ELECTRICAL POWER

RH ELECTRICAL CABINET

SUPPRESSION OF WIRING BUNDLE CHAFING

FALCON SERVICE BULLETIN Copyright © 2018 by Dassault Aviation All rights reserved. No part of this work may be reproduced or copied in any form or by any means without written permission of Dassault Aviation.

ELECTRICAL POWER

RH ELECTRICAL CABINET

SUPPRESSION OF WIRING BUNDLE CHAFING Initial issuance September 28, 2017 List of effective pages :

1 to 10 FALCON 2000 F2000 -436 F2000 -24-24

ELECTRICAL POWER

RH ELECTRICAL CABINET

SUPPRESSION OF WIRING BUNDLE CHAFING

1. PLANNING INFORMATION A. EFFECTIVITY This Service Bulletin is applicable to FALCON 2000 aircraft with serial numbers 70 through 231.

B. REASON Chafing of wire bundle at the bottom of RH electrical cabinet (between Frame 4 and 5) was reported on F2000 aircraft. The wire loom interfered with a metallic (ground) plate of terminal strip (700J) leading to 12 damaged wires and resulting in several flight deck effects.

The purpose of this Service Bulletin is to verify the clearance between the metallic plate and the bundle, and if necessary to modify the wire installation in order to get a correct clearance.

C. DESCRIPTION The operation consists in:

• verifying presence of the metallic plate

• checking clearance with the bundle

• if necessary cutting out the lower part of the ground plate of terminal strip (700J) and adding an edge protector.

D. COMPLIANCE Mandatory as prescribed by the Airworthiness Authorities of the country of registration of the aircraft.

E. APPROVAL This Service Bulletin covers DASSAULT AVIATION modification FALCON F2000 M3889 that has been approved under the authority of DOA nr. EASA.21J.051.

The technical content of this document is approved under the authority of DOA nr. EASA.21J.051.

F. LABOR Estimated labor-hours: Refer to Service Bulletin Commercial Summary.

NOTE: These labor-hours only concern the work described in this Service Bulletin and do not include other maintenance work that may be performed on this occasion.

G. MATERIAL - PRICE AND AVAILABILITY The modification kit may be obtained from either address listed below:

Western hemisphere: DASSAULT FALCON JET CORP.

SPARES DISTRIBUTION CENTER 200 RISER ROAD LITTLE FERRY, NJ 07643 U.S.A.

FALCON 2000 F2000 -436 September 28, 2017 F2000 -24-24 Initial issuance Page 1 / 10 DASSAULT AVIATION Proprietary Data

Telephone:

• CANADA and U.S.A.: 1-800-800-4036

• MEXICO: 001-800-800-4036

• Other countries: 1-201-541-4809 Fax:

• CANADA and U.S.A.: 1-800-800-4817

• MEXICO: 001-800-800-4817

• Other countries: 1-201-440-7021 Other continents: DASSAULT AVIATION Falcon Spares 54, AVENUE MARCEL DASSAULT B. P. 24 33701 - MERIGNAC Cedex (FRANCE) Please contact your Dassault Aviation Account Representative Telephone: 33 (0)1.48.35.56.78 E/H dafsorder@dassault-aviation.com Price and availability on request.

H. TOOLING

• TOOL BOX ( TO-20-008).

I. WEIGHT AND BALANCE Change in weight: Negligible.

Change in balance with respect to 25% MAC: Negligible.

J. ELECTRICAL LOAD ANALYSIS None.

K. REFERENCES Structural Repair Manual:

• DRILLING (Refer to RPI 51-40-03), Aircraft Maintenance Manual:

• GENERAL MAINTENANCE AND SAFETY PRECAUTIONS (Refer to TASK 20-00-00-910-801).

• USE OF THE AIRCRAFT MAINTENANCE PROCEDURES (Refer to TASK 20-00-00-910-803).

• REMOVAL / INSTALLATION OF ELECTRICAL BONDING BRAIDS (Refer to TASK 20-20-00-900-801).

• PRINCIPLES AND CHECK OF THE ELECTRICAL BONDING (Refer to TASK 20-20-00-910-801).

• BASIC SEALING METHODS (Refer to TASK 20-32-00-390-801).

• APPLICATION OF ALODINE (Refer to TASK 20-60-00-370-801).

• INSPECTION / CHECK OF ELECTRICAL AND ELECTRONIC SYSTEMS (Refer to TASK 20-90-00-200-801).

FALCON 2000 F2000 -436 September 28, 2017 F2000 -24-24 Initial issuance Page 2 / 10 DASSAULT AVIATION Proprietary Data

L. OTHER PUBLICATIONS AFFECTED None.

FALCON 2000 F2000 -436 September 28, 2017 F2000 -24-24 Initial issuance Page 3 / 10 DASSAULT AVIATION Proprietary Data

2. ACCOMPLISHMENT INSTRUCTIONS A. GENERAL AND SAFETY PRECAUTIONS

(1) Obey the general maintenance and safety precautions (Refer to TASK 20-00-00-910-801).

(2) Obey the general electrical instructions:

(a) when mechanical retrofit and/or modification operations are performed on the aircraft, take special care to protect the wiring in order to prevent metal chips (or burrs) from penetrating into the wire bundles, since they could eventually damage the insulation sheathing of the wires. Whenever possible, it is recommended that the wiring be removed from the work area. If that is not possible, it is absolutely necessary to protect the wiring,

(b) due to the risk of damaging the wire insulation, it is prohibited to blindly drill holes through a box structure containing wiring,

(c) electric and electronic equipment should be removed and installed as per the recommendations in Standard Practices, (Refer to TASK 20-00-00-910-801).

(d) visually inspect the work area for particles or debris, then vacuum-clean. The blowing of compressed air is prohibited since it could move metal chips to inaccessible areas.

(e) check that all connections are properly protected to ensure proper insulation, and that markings are visible and appropriate.

(3) Obey the Structural Repair Manual and Standard Practices procedures for the following operations:

• drilling (Refer to RPI 51-40-03),

• basic sealing methods (Refer to TASK 20-32-00-390-801).

B. PRELIMINARY STEPS

(1) The aircraft must be in the maintenance configuration (Refer to TASK 20-00-00-910-803).

(2) Remove and/or open the panels, doors, equipment and components necessary to get access to the working area.

(3) In the bottom of RH electrical cabinet, perform a visual inspection to see if there is a terminal strip (700J) with metallic plate (ground plate) (fig. 2):

• if there is a metallic plate, go to step 2.C.,

• if there is no metallic plate, no further action is required, go to step 2.D.

C. PROCEDURE Refer to fig. 1, fig. 2, fig. 3 and fig. 4

(1) In the bottom of RH electrical cabinet ( fig. 3 and fig. 4):

NOTE: Terminal strip (700J) and its ground plate are installed on RH stringers 10-11 bracket.

(a) in case of interference, check the wiring bundle (Refer to TASK 20-90-00-200-801),

(b) check that the clearance between the ground plate of terminal strip (700J) and the wiring bundle is > 12 mm (0.47 in.) (fig. 3 and fig. 4):

• if the clearance is ≥ 12 mm (0.47 in.), no further action is required, go to step 2.D., FALCON 2000 F2000 -436 September 28, 2017 F2000 -24-24 Initial issuance Page 4 / 10 DASSAULT AVIATION Proprietary Data

• if the clearance is < 12 mm (0.47 in.), go to the next step,

(c) measure a clearance of 15 mm (0.59 in.) between the ground plate and the wiring bundle, and make a mark (cutting line) on the ground plate (fig. 4), NOTE: The value of 15 mm (0.59 in.) = 12 mm (0.47 in.) + 3 mm (0.12 in.) (U protector).

(d) identify the location of the ground connections on the ground plate,

(e) remove the ground connections ( fig. 4 ) installed on the ground plate (Refer to TASK 20-20-00-900-801),

(f) remove terminal strip (700J) and its ground plate ( fig. 3)

(2) Separate terminal strip and ground plate.

(3) Modify the ground plate ( fig. 4):

(a) cut out the lower part of ground plate by respecting the mark previously made and apply alodine (Refer to TASK 20-60-00-370-801),

(b) install U protector (1-fig. 4) on the ground plate and verify that clearance of 12 mm (0.47 in.)

between ground plate and wiring bundle is always respected,

(c) if necessary, adapt cutting according to clearance (12 mm (0.47 in.) minimum) to be obtained , NOTE: The cutting describe on fig. 4, is an example. The cutting can be modified following the bundle position.

(d) if the lower hole (Hole E-fig. 4 ) was occupied and that it is impossible to install the ground connections, drill a new hole (Hole F-fig. 4 ) diameter in accordance with lug and protect with alodine (Refer to TASK 20-60-00-370-801),

(e) install U protector (1-fig. 4 ) on ground plate with interlaying sealant (Refer to TASK 20-32-00-390-801),

(f) write " SBF2000-436 APPLIED " near the part original marking and protect with vinyl varnish,

(4) Install terminal strip (700J) and its ground plate modified at the same location (Refer to paragraph

2.C.(1)(f)).

(5) Install ground connections on ground plate (Refer to TASK 20-20-00-900-801).

D. FINAL STEPS

(1) Install and/or close panels, doors, components and equipment removed and/or opened previously (paragraph 2.B.(2)).

E. RECORDING Record compliance with this Service Bulletin in the appropriate aircraft documents.

Fill out the card located at the end of the Service Bulletin and mail or fax it to Dassault Aviation or Dassault Falcon Jet, or fill out the electronic Service Bulletin reply form located in the ”Service Bulletin" page on the Falcon portal.

FALCON 2000 F2000 -436 September 28, 2017 F2000 -24-24 Initial issuance Page 5 / 10 DASSAULT AVIATION Proprietary Data

3. MATERIAL INFORMATION NOTE: Compliance with this Service Bulletin by substituting the part numbers below with interchangeable subsequent part numbers (as per the Master List) is acceptable, provided the subsequent part numbers have the same effectivity as the original ones.

A. LOCAL PROCUREMENT

• As indicated in Consumable Products Manual (CPM):

• interlaying sealant,

• alodine,

• vinyl varnish.

• Neoprene 31B6 (or P/N 106L0100 (0.1 m) that can be ordered to one of the addresses listed in paragraph 1.G.).

FALCON 2000 F2000 -436 September 28, 2017 F2000 -24-24 Initial issuance Page 6 / 10 DASSAULT AVIATION Proprietary Data

Page 9OCROpen in PDF

DASSAULT SERVICE BULLETIN

AVIATION FALCON 2000 F2000 -436 FRAME 4. FRAME 5_ RH electrical cabinet FR4 FR5 Fuselage section

WORKING AREA RH 8 PCB box RH electrical cabinet RH 14 PCB box RH relay box RH electrical cabinet Figure 1: RH ELECTRICAL CABINET (FR4 & 5) September 28, 2017 F2000-24-24 Initial issuance Page 7 / 10

Page 10OCROpen in PDF

DASSAULT SERVICE BULLETIN

AVIATION FALCON 2000 F2000 -436

TOP VIEW OF RH ELECTRICAL CABINET Ground plate & terminal strip (700J)

CHAFING ZONE - WIRING BUNDLE DAMAGED Ground plate Example of wiring bundle damaged ~ Ground connections WD Figure 2: WIRING CHAFING IN RH ELECTRICAL CABINET September 28, 2017 F2000-24-24 Initial issuance Page 8 / 10

Page 11OCROpen in PDF

DASSAULT SERVICE BULLETIN

AVIATION FALCON 2000 F2000 -436 FRAME 4 & 5 RH (Bottom of RH electrical cabinet) Cabin skin from FR4 to FR11 FR4 FR11 Half-frame 4 & 5 RH LH/RH Stringer 10 OC LH/RH Stringer 11 Ground plate 1 Neoprene 31B6 _FRAME 4 _ FRAME 5 Interlaying sealant Figure 3: GROUND PLATE & TERMINAL STRIP (700J) LOCATION (FR4 & 5) September 28, 2017 F2000-24-24 Initial issuance Page 9 / 10

Page 12OCROpen in PDF

DASSAULT SERVICE BULLETIN

AVIATION FALCON 2000 F2000 -436 GROUND PLATE & TERMINAL STRIP (700J) UP Ground plate Example Annotation of ground added connections FWD SBF2000-436 APPL Ground plate & terminal strip (700J) JUMBER Leave sufficient clearance between wire bundle and ground plate Ground plate cut out with U protector Hole (F) 0 3.1

(0.13 12 mini

(0.47) Wire bundle

- Hole (E) DOWN Neoprene 31B6 (0.12) Interlaying sealant 9

(0.35) Dimensions are in: mm (in.)

Figure 4: EXAMPLE OF GROUND PLATE MODIFICATION September 28, 2017 F2000-24-24

END OF DOCUMENT Initial issuance Page 10 / 10