Copy · U.S. DOT/FAA - WI-MSB 40NG-018 · 10 pages

© Diamond Aircraft. Filed by the FAA in regulations.gov docket FAA-2013-0348, the docket of AD 2013-08-21. Not covered by OpenAirDocs’ CC0 dedication.

TextOCR

This text is OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'b3c2051abdbe8d7bc0a490adc7847eb14f613a83554488deaeb326e4ee23cc2c'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

Diamond Diamond Aircraft Industries GmbH WI-MSB 40NG-018 AIRCRAFT N. A. Otto-Straße 5 Revision 1 A-2700 Wiener Neustadt Page 1 of 10 Austria 26-Nov-2012

WORK INSTRUCTION WI-MSB 40NG-018

GENERAL INFORMATION

1.1 Subject Replacement of charge air tubes.

1.2 Reference Documents DA 40 NG Airplane Maintenance Manual, Doc. No. 6.02.15, latest effective issue.

Diamond aircraft SI 40NG-007 Installation and tightening torque of worm drive clamps.

1.3 Remarks

a) All work must be done by a certified aircraft service station or a certified aircraft maintenance mechanic.

b) All work, in particular if not described in this work instruction, must be done in accordance with the referenced maintenance manual.

c) For conversion factors between SI units and US/Imperial units refer to AMM Chapter 02.

d) In case of doubt, contact Diamond Aircraft Industries GmbH.

DRAWINGS, SPECIAL TOOLS & MATERIALS I.1 Drawings None.

II.2 Special Tools None.

Page 2OCROpen in PDF

Diamond Diamond Aircraft Industries GmbH WI-MSB 40NG-018 AIRCRAFT A-2700 Wiener Neustadt N. A. Otto-Straße 5 Page 2 of 10 Revision 1 Austria 26-Nov-2012 П.З Material If RSB 40NG-011 or MAM 40-506 or MAM 40-502 was carried out, use the material below:

Quantity Part Number Description 1 D44-8122-20-00_2 Turbo Connector Assy 1 D44-8126-00-05_2 Charge Air Tube 1 DIN 3771 46.2x3.55 O-Ring MVQ 70 8 TORRO_60-80_12_W1 Worm drive Clamps If RSB 40NG-011 or MÄM 40-506 or MAM 40-502 was NOT carried out, use the material below:

Quantity Part Number Description 1 D44-8126-00-08 Charged Air Hose 1 D44-8122-00-10_1 Elbow 45° (Hose) 8 TORRO_60-80_12_W1 Worm Drive Clamps 1 DIN 933-M8x16-YZP Hexagon head screw D44-8122-20-00_2 Turbo Connector Assy 1 D44-8126-00-05_2 Charge Air Tube 1 DIN 3771 46.2x3.55 O-Ring MVQ 70 Material is available from Diamond Aircraft Industries.

Page 3OCROpen in PDF

Diamond Diamond Aircraft Industries GmbH WI-MSB 40NG-018 AIRCRAFT N. A. Otto-Straße 5 Revision 1 A-2700 Wiener Neustadt Page 3 of 10 Austria 26-Nov-2012

INSTRUCTIONS | If RSB 40NG-011 or MÄM 40-506 or MÄM 40-502 was carried out:

Make sure AMM-TR-MÄM 40-530 has been incorporated into the AMM.

2 Remove cowlings (i.a.w. AMM section 71-10).

WARNING DO NOT STAND WITHIN THE DANGER AREA OF THE PROPELLER. IF

THE ENGINE STARTS, THE PROPELLER CAN CAUSE DEATH OR INJURY TO PERSONS.

WARNING MAKE SURE THAT THE ENGINE IS SAFE BEFORE YOU WORK ON THE ENGINE CONTROLS. IF THE PROPELLER TURNS IT CAN CAUSE INJURY TO PERSONS.

3 Remove current charge air tubing between turbo charger and intercooler:

• Remove and discard all used (8) worm drive clamps on the turbo connector assy D44-8122-20-00 and the charge air tube D44-8126-00-05_1.

• Remove and discard the turbo connector assy D44-8122-20-00 (including o-ring) and charge air tube D44-8126-00-05_1.

4 Install charge air tube D44-8126-00-05_2 and turbo connector assy D44-8122-20-00_2 (refer to SI 40NG-007 latest revision).

• Install the Turbo Connector Assy including o-ring DIN 3771 46.2x3.55 MVQ 70.

Do NOT tighten the V-Clamp at the turbo charger at this time.

• Install the charge air hose D44-8126-00-08 to the turbo connector assy D44-8122-20-

• Install the charge air tube D44-8126-00-05_2 to the charge air hose D44-8126-00-08 and move the 8 new worm drive clamps into position (refer to SI 40NG-007 latest revision).

• Connect the charge air tube D44-8126-00-05_2 to the charge air hose D44-8122-00-10_1.

CAUTION DO NOT TIGHTEN THE WORM DRIVE CLAMPS WITH THE ENGINE BEING HOT. THIS CAN DAMAGE THE SILICONE HOSES AND MAY RESULT IN LOSS OF ENGINE POWER.

Page 4OCROpen in PDF

Diamond Diamond Aircraft Industries GmbH WI-MSB 40NG-018 N. A. Otto-Straße 5 Revision 1

AIRCRAFT A-2700 Wiener Neustadt Page 4 of 10 Austria 26-Nov-2012 5 Position the charge air tube and turbo connector assy.

Make sure that the charge air tube has at least 12mm clearance to the firewall and at least 5mm clearance to the coolant tube aft of the engine (refer to Figure 1 and 2 below).

Firewall - Min. 12 mm Charge Air Tube Min. 5mm Clearance Coolant Tube RSGU Clamp Figure 1: Clearance between charge air tube to firewall and coolant tube

• Make sure that the charge air tube has at least 5mm clearance to the oil line aft of the engine (refer to Figure 2 below).

Minimum Clearance 5mm Figure 2: Attachment of charge air tube

Page 5OCROpen in PDF

Diamond Diamond Aircraft Industries GmbH WI-MSB 40NG-018 AIRCRAFT N. A. Otto-Straße 5 Revision 1 A-2700 Wiener Neustadt Page 5 of 10 Austria 26-Nov-2012 6 Make sure the Alternate Air Bowden Cable is routed as shown in figures 3 and 4.

Figure 3: Bowden Cable Installation - Top View Figure 4: Bowden Cable Installation - View from RH side

Page 6OCROpen in PDF

Diamond Diamond Aircraft Industries GmbH WI-MSB 40NG-018 AIRCRAFT N. A. Otto-Straße 5 Revision 1 A-2700 Wiener Neustadt Page 6 of 10 Austria 26-Nov-2012 Tighten worm drive clamps (SI 40NG-007, latest revision):

• Position and tighten the worm drive clamps on the charge air hoses D44-8122-00-10_1 and D44-8126-00-08 according to SI 40NG-007 latest revision.

CAUTION DO NOT TIGHTEN THE WORM DRIVE CLAMPS WITH THE ENGINE BEING HOT. THIS CAN DAMAGE THE SILICONE HOSES AND MAY RESULT IN LOSS OF ENGINE POWER.

• Apply torque seal on the worm drive clamps (see Figure 3 below).

Figure 5: Worm drive clamp torque seal

• Tighten the V-clamp on the turbo connector assy with 5 Nm.

8 Clean working areas, check for foreign objects.

9 Check all altered, replaced, repaired parts for proper function.

10 Test all systems in working area for function.

11 Make all necessary entries in the airplane logs.

| If RSB 40NG-011 or MÄM 40-506 or MÄM 40-502 was NOT carried out:

12 Make sure AMM-TR-MÄM 40-530 has been incorporated into the AMM.

13 Remove cowlings (i.a.w. AMM section 71-10).

WARNING DO NOT STAND WITHIN THE DANGER AREA OF THE PROPELLER. IF

THE ENGINE STARTS, THE PROPELLER CAN CAUSE DEATH OR INJURY TO PERSONS.

WARNING MAKE SURE THAT THE ENGINE IS SAFE BEFORE YOU WORK ON THE ENGINE CONTROLS. IF THE PROPELLER TURNS IT CAN CAUSE INJURY TO PERSONS.

Page 7OCROpen in PDF

Diamond Diamond Aircraft Industries GmbH WI-MSB 40NG-018 AIRCRAFT N. A. Otto-Straße 5 Revision 1 A-2700 Wiener Neustadt Page 7 of 10 Austria 26-Nov-2012 14 Remove current charge air tubing:

• Remove and discard all used (8) worm drive clamps between turbo charger and intercooler.

• Remove and discard the charge air elbow hose SNS5X-0-60_72-90°.

• Remove the turbo adapter D44-8126-70-01 from turbo charger.

• Remove the P-clamp, which holds the charged air tube on the air filter box (refer to Figure 4 below).

Figure 6: Attachment of charged air tube

• Remove and discard charge air tube D44-8126-00-05.

• Remove and discard charge air hose D44-8122-00-10.

15 Install charge air tube D44-8126-00-05_2 and turbo connector assy D44-8122-20-00_2 (refer to SI 40NG-007, latest revision).

• Install the hexagonal head screw DIN 933-M8x16-YZP with washer into the air filter box where the P-clamp was previously removed.

• Install the Turbo Connector Assy including o-ring DIN 3771 46.2x3.55 MVQ 70.

Do NOT tighten the V-Clamp at the turbo charger at this time.

• Install the charge air hose D44-8126-00-08 to the turbo connector assy D44-8122-20-

• Install the charge air tube D44-8126-00-05_2 to the charge air hose D44-8126-00-08 and move the 8 new worm drive clamps into position (refer to SI 40NG-007, latest revision).

• Connect the charge air tube D44-8126-00-05_2 to the charge air hose D44-8122-00-10_1

CAUTION DO NOT TIGHTEN THE WORM DRIVE CLAMPS WITH THE ENGINE BEING HOT. THIS CAN DAMAGE THE SILICONE HOSES AND MAY RESULT IN LOSS OF ENGINE POWER.

Page 8OCROpen in PDF

Diamond Diamond Aircraft Industries Gmbh WI-MSB 40NG-018 AIRCRAFT N. A. Otto-Straße 5 Revision 1 A-2700 Wiener Neustadt Page 8 of 10 Austria 26-Nov-2012 16 Position the charge air tube and turbo connector assy.

Make sure that the charge air tube has at least 12mm clearance to the firewall and at least 5mm clearance to the coolant tube aft of the engine (refer to Figure 7 and 8 below).

Firewall - Min. 12 mm Charge Air Tube Min. 5mm Clearance Coolant Tube RSGU Clamp Figure 7: Clearance between charged air tube to firewall and coolant tube

• Make sure that the charge air tube has at least 5mm clearance to the oil line aft of the engine (refer to Figure 8 below).

Minimum Clearance 5mm Figure 8: Attachment of charged air tube

Page 9OCROpen in PDF

Diamond Diamond Aircraft Industries GmbH WI-MSB 40NG-018 AIRCRAFT N. A. Otto-Straße 5 Revision 1 A-2700 Wiener Neustadt Page 9 of 10 Austria 26-Nov-2012 17 Make sure the Alternate Air Bowden Cable is routed as shown in figures 9 and 10.

Figure 9: Bowden Cable Installation - Top View Figure 10: Bowden Cable Installation - View from RH side

Page 10OCROpen in PDF

Diamond Diamond Aircraft Industries GmbH WI-MSB 40NG-018 AIRCRAFT N. A. Otto-Straße 5 Revision 1 A-2700 Wiener Neustadt Page 10 of 10 Austria 26-Nov-2012 18 Tighten worm drive clamps (SI 40NG-007, latest revision):

• Position and tighten the worm drive clamps on the charge air hoses D44-8122-00-10_1 and D44-8126-00-08 according to SI 40NG-007 latest revision.

CAUTION DO NOT TIGHTEN THE WORM DRIVE CLAMPS WITH THE ENGINE BEING HOT. THIS CAN DAMAGE THE SILICONE HOSES AND MAY RESULT IN LOSS OF ENGINE POWER.

• Apply torque seal on the worm drive clamps (see Figure 11 below).

Figure 11: Worm drive clamp torque seal

• Tighten the V-clamp on the turbo connector assy with 5 Nm.

19 Clean working areas, check for foreign objects.

20 Check all altered, replaced, repaired parts for proper function.

21 Test all systems in working area for function.

22 Make all necessary entries in the airplane logs.

23 Make all necessary entries in the airplane logs.