Copy · SB-328-55-557R02 · 22 pages

© 328 Support Services. Filed by the FAA in regulations.gov docket FAA-2018-0503; AD 2018-19-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '7cb3cd5bbf5a8308e43f629e532e67e95a61fc1d04f33af21acb78c47a55e9cb'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

SB Dornier 328 Service Bulletin D-82231 Wessling 328 Support Services GmbH Customer Support • Global Support Centre P. O. Box 1252 Telefax: +49 8153 88111 6565 Phone: +49 8153 88111 6666 Эга* Germany E-Mail: gsc.op@328.eu Revision Transmittal Sheet This sheet transmits Revision 2 of Service Bulletin SB-328-55-557 titled:

Stabilizer - Inspection of Horizontal Stabilizer Bearing Support Rear This is a complete revision. This has been reprinted in its entirety. All previous editions must be destroyed. This revision does not require further action.

Reason for Revision:

General: Spelling Errors - not marked with revision bars Page 16: Alternative item 4 added to Material Parts List, bolt, NAS6710D31.

NOTE: The changes are marked with revision bars at the outside margin.

This Revision Transmittal Sheet is part of SB-328-55-557 Revision 2 Model: Dorier 328-100 No.: SB-328-55-557 Date of Issue: May 24, 2018 Page _1 of

No text on this page: it may be a figure. Open the PDF to see it.

Page 3OCROpen in PDF

SB Dornier 328 328 Support Services GmbH Customer Support • Global Support Centre P. O. Box 1252 Phone: +49 8153 88111 6666 J2gr Service Bulletin D-82231 Wessling Telefax: +49 8153 88111 6565 Germany E-Mail: gsc.op@328.eu SB-328-55-557 Title: Stabilizer - Inspection of Horizontal Stabilizer Bearing Support Rear 1 PLANNING INFORMATION Effectivity Dornier 328-100 Type Certificate Data Sheet EASA.A.096 Serial No.: All Reason During execution of SB-328-55-527 several stabilizer bearing supports were found corroded at the contact surface to the horizontal stabilizer rear spar.

Description The horizontal stabilizer bearing supports rear need to be inspected for corrosion and replaced on condition for horizontal stabilizers with S/Ns 1032 and up. Bearing supports rear of horizontal stabilizers with S/Ns 1005 up to and including 1031 must be replaced.

Approval The technical content of this Service Bulletin is approved under the authority of EASA approved Design Organization 328 Support Services GmbH (EASA.21J.438).

The technical content of this SB is covered by CN-100331 and CN-100411.

328 Support Services GmbH EASA approved Design organisation EASA.21J.438 © 328 Support Services GmbH 2006-2018. All Rights reserved This document is property of 328 Support Services GmbH and is supplied on the condition that it is treated as confidential. No use or reproduction may be made thereof other than that expressly authorized. The information provided by this SB has been prepared for a specific Serial Number(s) aircraft, component, component part number or specific problem on the basis of the information supplied to 328 Support Services GmbH. The information provided by 328 Support Services GmbH is not to be used for any other specific serial Number(s) aircraft, component, component part number or any other purpose than for that which it was supplied without the written approval of 328 Support Services GmbH.

Any information contained in this SB are Technical Documents and Data as defined in the Technical Data Agreement which 328 Support Services GmbH has separately concluded with the Customer. The Technical Data Agreement, especially the confidentiality obligations contained therein applies to any information provided by 328 Support Services GmbH in the course of the fulfilment of the SB.

The Design Organisation 328 Support Services GmbH is the TC-Holder of Dornier 328-100 and 328-300 and authorised to provide necessary approved data under the privilege of EASA approval number EASA 21J.438.

It is the operator's responsibility to comply with the relevant aviation regulations of the country in which the aircraft is registered.

Model: Dornier 328-100 Rev. No.: 2 No.: SB-328-55-557 Rev. Date: May 24, 2018 Date of Issue: Sep 01, 2017 Page 1 of 17

Page 4OCROpen in PDF

Compliance Mandatory.

For S/N 1005 to and including S/N 1031 the inspection and modification described within this service bulletin must be performed within the next 1000 FC or 8 Months from approval date of this Service Bulletin, whichever comes first.

From S/N 1032 and onwards the inspection described within this service bulletin must be performed within the next 5000 FH or 30 Months, whichever comes first.

Manpower Access & removal: 40.0 Mh Inspection: 4.0 Mh Modification: 16.0 Mh Additional Effort for Replacement: 24.0 Mh (depending on findings) Close-up: 56.0 Mh Functional checks: 12.0 Mh Total: 128 - 152 Mh (depending on findings) A curing time of 26 h to 7 days, depending on the selected process, is not included. Refer to SRM 51-77-20 and paragraph C of this SB for details.

It is recommended to perform this SB together with SB-328-55-527 if not yet accomplished.

The manpower needed for this SB is reduced to approximately 20 to 44 Mh depending on the result of the inspection.

Material Refer to Material Parts List.

Special Tools GSE No. 12.6.03 Platform, adjustable GSE No. 07.1.13 Hoisting equipment GSE No. 07.1.14 Hoisting fitting GSE No. GM.5.0 Torque wrench or equivalent P/N 001U536A2110000 Positioning Fixture Bearing Rib 8 P/N 001U551A1440000 Drilling Jig Rear Horizontal Stabilizer D0328-100 P/N 001U551A1447000 Installation Kit (bolt, with washer and nut), 2 EA NOTE: A separate drill template, P/N 001U551A1440000, is necessary for each bearing support rear installation in case of a replacement of the support. The two kits of additional bolts, nuts and washers, P/N 001U551A1447000, and the Positioning Fixture Bearing Rib 8, P/N 001U536A2110000, can be used again for further installations.

Page 2 of 17 SB-328-55-557 Rev. 2

Page 5OCROpen in PDF

Eddy current tester: Elotest M3 or M2 or equivalent SE.4.50 Probe KAS 66-3 or equivalent SE.4.45 Calibration standard or equivalent Visual inspection equipment: Light source, e.g. flashlight, magnifying glass Weight and Balance N/A Electrical Load Data N/A References AMM JIC 00-30-01 AMM JIC 00-30-10 AMM JIC 55-10-00-020-801-YYY AMM JIC 55-10-00-420-801-YYY AMM JIC 55-11-70-220-803-A01 Make the Aircraft Safe for Maintenance - Material and Aircraft Handling General Maintenance Practices - Material and Aircraft Handling Horizontal Stabilizer - Removal Horizontal Stabilizer - Installation Horizontal Stabilizer, Rear Support to vertical Stabilizer including Bolts - Detailed Inspection.

NTM 51-25-60 Eddy Current Inspection - General NTM 51-25-90 Detailed Visual Inspection - General SRM 51-21-00 Cleaning processes SRM 51-40-11 Fastener Hole and Drill Data - Metallic Structure SRM 51-40-12 Fastener Hole and Drill Data - Non-metallic Structure SRM 51-40-22 Countersinking non-metallic Structure SRM 51-40-30 Fastener Spacing and Margin Data SRM 51-41-10 Rivet Identification and Specification SRM 51-41-20 Rivet Installation & Removal Metallic Structure SRM 51-41-30 Rivet Installation & Removal Non-metallic Structure SRM 51-41-50 Oversize Rivets SRM 51-74-00 Corrosion Prevention SRM 51-74-11 Corrosion Removal from Aluminium Alloys SRM 51-74-20 Corrosion Preventive Treatment SRM 51-77-20 Composite Repairs - Material, Handling and Preparation SRM 51-91-00 Protective Treatment SRM 51-92-00 Paint Coating Model: Dornier 328-100 Rev. No.: 2 No.: SB-328-55-557 Rev. Date: May 24, 2018 Date of Issue: Sep 01, 2017 Page 3 of 17

Page 6OCROpen in PDF

SRM 55-11-20 Horizontal Stabilizer SRM 55-11-70 Horizontal Stabilizer Fittings SB-328-55-527 Stabilizer - Inspection of Horizontal Stabilizer Support Fittings Other Publication affected N/A Reporting Compliance with this Service Bulletin must be reported to the 328 Support Services GmbH Customer Support with the Compliance Report (CR) for configuration control.

NOTE: A/C S/N, P/N and S/N of the horizontal stabilizer, nature of horizontal stabilizer (original or spare), location and results of the inspection - independent on the outcome - must be reported. Refer to the compliance report sheet in the annex of this Service Bulletin.

NOTE: In case of replacement the bearing support rear must be returned to the 328 Support Services GmbH Customer Support.

Page 4 of 17 SB-328-55-557 Rev. 2

Page 7OCROpen in PDF

2 ACCOMPLISHMENT INSTRUCTIONS WARNING: OBEY THE GENERAL MAINTENANCE PRACTICES AND SAFETY

PRECAUTIONS REFER TO ALL RELATED SRM, AMM, AMM-JIC CHAPTERS, IN PARTICULAR:

AMM JIC Chapter 00 00-30-10 General Maintenance Practices CAUTION: Put a note into the cockpit not to move the controls A Preparation

1) Make the aircraft safe for maintenance. Refer to AMM JIC 00-30-01.

2) Remove the horizontal stabilizer. Refer to AMM JIC 55-10-00-020-801-YYY. Obey the related safety precautions.

3) Clean the inspection areas (see SRM 51-21-00).

4) Remove the temporary protection system (Corrosion Inhibiting Compound).

Fig. 1: Inspection and Modification area: Horizontal stabilizer rear spar and bearing support rear at the centre section of the horizontal stabilizer Model: Dornier 328-100 Rev. No.: 2 No.: SB-328-55-557 Rev. Date: May 24, 2018 Date of Issue: Sep 01, 2017 Page 5 of 17

Page 8OCROpen in PDF

B Inspection

1) Do the necessary inspections of SB-328-55-527, if not done. Refer to SB-328-55-

527. Report result to 328 Support Services GmbH Customer Support regardless of its outcome.

2) Make sure that the 6 spherical bearings of the bearing supports do not have too much play (axial play < 100 um).

3) Remove the bearing support rear.

a) Remove equipment, fasteners and secondary structure to get a condition as shown in tig. 2.

NOTE: In case of a subsequent replacement of the removed bearing support rear. It will be necessary to copy the fastener hole positions onto the undrilled spare bearing support rear.

NOTE: Obey SRM 51-40 and subsequent chapters for rivet identification and removal of fasteners. Do not damage holes.

NOTE: If necessary use non-metallic tools to remove the bearing support rear from the horizontal stabilizer rear spar, to not damage the rear spar and/or the support.

b) Clean bearing support rear and remove corrosion inhibiting compound and sealant. Refer to SRM 51-21-00.

Fig 2: Horizontal stabilizer rear spar centre after removal of the bearing support rear and the detachment and/or removal of secondary structure.

4) Do a detailed visual inspection of the bearing support rear for corrosion and cracks.

Specially examine the area adjacent to the lower edge of the HS rear spar and bonding contact surfaces, see fig. 3.

Page 6 of 17 SB-328-55-557 Rev. 2

Page 9OCROpen in PDF

5) Do an eddy current inspection of the bearing support rear from both sides in general.

Specially examine the areas of the web marked with green frames, refer to fig. 3.

Obey NTM 51-25-60. Examine for corrosion and cracks.

Fig 3: Example for corrosion found on a bearing support rear (red frames). During inspection specially examine the green framed areas.

6) Examine the edges of the bearing support rear for chafe marks. Refer to fig. 4 for location and identification of chafe marks. The bearing support rear can have chafing marks because of a contact between an angle installed on fairing assemblies 001B551A2850 000 / -001 and the bearing supports rear, see fig. 4 and 5.

Fig. 4: Typical chafe mark on the edge of the bearing support rear Model: Dornier 328-100 Rev. No.: 2 No.: SB-328-55-557 Rev. Date: May 24, 2018 Date of Issue: Sep 01, 2017 Page 7 of 17

Page 10OCROpen in PDF

C D Fairing Fig. 5: Location and cause of chafing of the bearing support rear: In some cases the angle has been installed to the fairing assembly 001B551A2850000 and -001 (view D) with corner anchor nuts and screws as an alternative to HLGPL rivets and collars.

The attachment rivet and the edge of the angle can cause chafing of the bearing support, as shown in the lower picture marked by a red frame.

Page 8 17 SB-328-55-557 Rev. 2

Page 11OCROpen in PDF

C Modification of the Horizontal Stabilizer Rear Spar

1) To create a flat/smooth contact surface for the bearing support rear to be installed, remove the resin and/or paint lump at the lower edge of the horizontal stabilizer rear spar by grinding. See the green mark in the sketch of fig. 6.

NOTE: Small concave areas can stay as they are, but elevated surfaces must be ground off. Do not damage the original composite structure of the rear spar and the copper bonding stripe.

Resin and/or paint lump Bearing support rear HS Rear Spar Void to be filled with sealant Fig. 6: The lower edge of the horizontal stabilizer rear spar shows elevated areas:

The mating surface to the bearing support rear must be flat/smooth. Small concave areas can stay, but must be filled with sealant during the installation of the bearing support. Make sure that the void, marked in red, is completely filled with sealant to keep water out.

2) Prepare bearing support rear foot print area (+ approximately 10 mm, if not otherwise limited) on the rear spar for the application of a composite wet lay-up. For the surface preparation procedure see SRM 51-77-20, chapter 4.

Model: Dornier 328-100 Rev. No.: 2 No.: SB-328-55-557 Rev. Date: May 24, 2018 Date of Issue: Sep 01, 2017 Page 9 of 17

Page 12OCROpen in PDF

CAUTION: Do not cover the copper stripes for bonding with the glass ply. Make sure the cut-out of the protective glass fabric ply is correct. The surfaces of the copper stripe and the adjacent surfaces must stay metallic blank before installation.

3) Prepare a ply of glass fabric, mat. no. 05-091 or an equivalent, and wet it with epoxy resin/hardener, mat. no. 08-022 (Alternate: 08-030). For material information see SRM 51-77-20, chapter 5.

4) Clean and degrease rear spar surface for composite lay-up, see SRM 51-77-20, chapter 4.

5) Apply glass fabric ply. Obey SRM 51-77-20, chapter 7 and 8. Let cure.

Copper stripes for bonding. Cut-out glass fabric ply, Bonding area must not be covered.

... Prepare for Lay-Up

- Edge of Glass Ply

• Rear Attachment Fitting Fig. 7: Application of glass ply.

6) Make sure the surface is even. If necessary rework the surface, but do not grind through the glass ply.

Page 10 SB-328-55-557 Rev. 2

Pages 13–22 of 22