Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '3b29b2cded877bc6d5ee49569442d9d4ebcc1541fa527d96d3e1af6e38de70bb' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '3b29b2cded877bc6d5ee49569442d9d4ebcc1541fa527d96d3e1af6e38de70bb' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
1. DESCRIPTION This sheet informs about Revision 01 to the Service Bulletin 190E2-32-0015.
This is a complete reissue of this Service Bulletin.
This revision incorporates the information presented in the Information Notice related to the previous issue of this Service Bulletin, as listed below:
SB190E2-32-0015R01-IN01
2. ADDITIONAL ACTION Aircraft that have complied with the previous issue of this bulletin do not need any additional action.
3. RECORD OF REVISION Basic issue: Aug 05, 2022 Revision 01: Jan 27, 2023
4. HIGHLIGHTS The topics, affected pages and a brief description of the content-related changes introduced by this revision are presented below.
Revision bars are shown in the left margin of each page to show where significant changes were made. Text displacement and text format changes are not indicated.
TOPIC / PAGE DESCRIPTION OF REVISION
1. PLANNING INFORMATION
1.C. REASON / 01 Added reason of Revision 01.
3. ACCOMPLISHMENT INSTRUCTIONS
3. ACCOMPLISHMENT INSTRUCTIONS / 06 thru 08 Updated procedure information.
TRANSMITTAL LETTER SB190E2-32-0015 Page 1 of 1 Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16
LANDING GEAR - MLG SIDE-STAY UPPER SPINDLE - ATTACHMENT PARTS INSPECTION In connection with the use of this document, Embraer does not provide any express or implied warranties and expressly disclaims any warranty of merchantability or fitness for a particular purpose.
This document contains trade secrets, confidential, proprietary information of Embraer and technical data subject to U.S. Export Administration Regulation ("EAR") and other countries export control laws and regulations. Diversion contrary to the EAR and other laws and regulations is strictly forbidden. The above restrictions may apply to data on all pages of this document.
1. PLANNING INFORMATION A. SB EFFECTIVITY Aircraft affected:
MODEL SN E-JETS E2 19020009 thru 19020015, 19020017 thru 19020040, and19020042 thru 19020066.
In-production effectivity:
This bulletin does not affect any in-production aircraft.
B. CONCURRENT REQUIREMENTS None.
C. REASON
(1) HISTORY Embraer has received reports about the MLG side stay upper spindle attachments parts (bolt, locking nut, washer and cotter pin) missing.
These attachment parts are locking elements responsible for holding the Side Stay Nut in place.
If these are missing the Side Stay Nut could be lost due to the region vibration causing a nonannunciated loss of the downlocking capability and collapse of the MLG during aircraft takeoff or landing roll.
(2) OBJECTIVE To do an one-time inspection of the MLG side stay upper spindle installation to check for the correct installation of the nut locking elements and to measure clearances present in this installation.
(3) EXPECTED BENEFITS To make sure that MLG side stay upper spindle attachments parts are properly installed in order to prevent the collapse of the MLG.
(4) REVISION HISTORY REVISION 01: This revision has been issued to update the accomplishment instructions.
This revision includes the Information Notice:
SB190E2-32-0015R01-IN01
SERVICE BULLETIN Date: Aug 05, 2022 Revision No.: 01 - Jan 27, 2023 SB190E2-32-0015 Page 1 of 11 Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16
D. DESCRIPTION This bulletin is to measure the clearance between the spindle shoulder and the bushing flange, and the clearance between the bushing flange and washer. Also, it gives instructions to do a check of the attachment parts (bolt, locking nut, washer and cotter pin) to make sure that they are properly installed on the MLG side-stay upper spindle. If they are not, it gives the instructions to install them.
To do this, it is necessary to get access to the area at MLG compartment, in zones 731 and 741.
This Bulletin is divided into 2 PARTS, as follows:
(1) APPLICABLE TO PART I:
PART I of this Service Bulletin gives the procedures to do the check of the attachment parts (bolt, locking nut, washer and cotter pin) for correct installation on the LH MLG side-stay upper spindle.
Also, it gives the procedures to measure the clearance between the spindle shoulder and the bushing flange, and the clearance between the bushing flange and the washer.
(2) APPLICABLE TO PART II:
PART II of this Service Bulletin gives the procedures to do the check of the attachment parts (bolt, locking nut, washer and cotter pin) for correct installation on the RH MLG side-stay upper spindle. Also, it gives the procedures to measure the clearance between the spindle shoulder and the bushing flange, and the clearance between the bushing flange and the washer.
NOTE: The modification presented in this bulletin does not affect Fatigue Critical Structure (FCS).
E. COMPLIANCE
1) SB CATEGORY
Category 02: RECOMMENDED
2) SB ACCOMPLISHMENT
Embraer recommends the accomplishment of this SB in the next 500FH/350FC or 3 months, whichever comes first, from the SB issue date.
F. APPROVAL The inspection mentioned in this Service Bulletin does not affect the type design previously approved by Agência Nacional de Aviação Civil (ANAC).
NOTE: If any aircraft listed in the SB effectivity has an incorporated modification or repair that is not from EMBRAER and which affects the content of this Service Bulletin, the operator will take full responsibility for obtaining approval by a regulatory agency for any adaptation necessary before the incorporation of this Service Bulletin.
G. ESTIMATED MANPOWER This is an estimate of the manpower necessary to accomplish this Service Bulletin on a single aircraft.
It is intended for direct labor only, performed by experienced personnel and does not include the time to plan, prepare or inspect the work. Sealant, paint or adhesive curing times are not included either.
It is assumed that all the tools, parts and other means are readily available when necessary.
An adjustment to these values may be necessary to meet particular circumstances.
SERVICE BULLETIN SB190E2-32-0015 Page 2 of 11 Date: Aug 05, 2022 Revision No.: 01 - Jan 27, 2023 Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16
(1) APPLICABLE TO PART I:
– Access opening: 0.1 man-hours.
– Inspection: 0.1 man-hours.
– Modification: 2.0 man-hours.
– Access closure: 0.1 man-hours.
– Test: None.
NOTE: The estimate man-hours to do this modification may vary according to the issues found during the inspections described in this Service Bulletin.
(2) APPLICABLE TO PART II:
– Access opening: 0.1 man-hours.
– Inspection: 0.1 man-hours.
– Modification: 2.0 man-hours.
– Access closure: 0.1 man-hours.
– Test: None.
NOTE: The estimate man-hours to do this modification may vary according to the issues found during the inspections described in this Service Bulletin.
H. WEIGHT AND BALANCE None.
I. ELECTRICAL LOAD DATA Not changed.
J. SOFTWARE ACCOMPLISHMENT SUMMARY None.
K. REFERENCES AMM 190E2/( ) Aircraft Maintenance Manual PART II - 20-00-00 and 20-10-02 - STANDARDPRACTICES-AIRFRAME.
AMM 190E2/( ) Aircraft Maintenance Manual PART II - 32-11-11 and 32-12-01 - LANDINGGEAR.
SRM 190E2/( ) Structural Repair Manual Part II - 51-21-05 - STANDARD PRACTICES ANDSTRUCTURES.
L. OTHER PUBLICATIONS AFFECTED None.
SERVICE BULLETIN Date: Aug 05, 2022 Revision No.: 01 - Jan 27, 2023 SB190E2-32-0015 Page 3 of 11 Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16
2. MATERIAL INFORMATION A. MATERIAL - PRICE AND AVAILABILITY
(1) MATERIAL AVAILABLE FROM EMBRAER None.
(2) MATERIAL AVAILABLE FROM OTHER VENDORS None.
B. INDUSTRY SUPPORT INFORMATION None.
C. MATERIAL NECESSARY FOR EACH AIRCRAFT When applicable, the use of alternative or similar parts is allowed, once it is approved by Embraer as indicated in the related Embraer Technical Publications or through a formal Embraer communication channel.
The necessary expendable or consumable parts presented in the AMM Tasks mentioned in this bulletin can be acquired from the operator's inventories or ordered as spares.
When necessary, additional information is presented as Notes in the respective Table.
(1) TOP KITS AND KITS None.
(2) MATERIAL TO BE PROCURED
(a) Parts The material below or equivalent required for the accomplishment of this bulletin should be procured from the operator’s inventories or from a local supplier.
NEW PN DESCRIPTION OLD PN QTY DISP/Notes AN4-25 BOLT-HEXAGONHEAD,STEEL AN4-25 2 6 NAS1149C0432R WASHER,FLAT-CRES NAS1149C0432R 2 6 MS17825-4 NUT,HEXAGON MS17825-4 2 6 MS24665-134 PIN,COTTER-SPLIT,STEEL MS24665-134 2 6
(b) Consumable Materials The material below or equivalent required for the accomplishment of this bulletin should be procured from the operator’s inventories or from a local supplier.
SERVICE BULLETIN SB190E2-32-0015 Page 4 of 11 Date: Aug 05, 2022 Revision No.: 01 - Jan 27, 2023 Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16
Applicable to PARTS I and II NEW PN DESCRIPTION OLD PN QTY DISP/Notes COR-BAN 27L
CORROSION-
INHIBITING
COMPOUND COR-BAN 27L AR 6 DISPOSITION: 6 = Apply as required QUANTITY: AR = As Required D. MATERIAL NECESSARY FOR EACH SPARE None.
E. REIDENTIFIED PARTS None.
F. TOOLING - PRICE AND AVAILABILITY Whenever required, the necessary tooling presented in the AMM Tasks mentioned in this bulletin, should be procured from the operator’s inventories or ordered as spares.
SERVICE BULLETIN Date: Aug 05, 2022 Revision No.: 01 - Jan 27, 2023 SB190E2-32-0015 Page 5 of 11 Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16
3. ACCOMPLISHMENT INSTRUCTIONS NOTE:
1) The definition of a General Visual Inspection (GVI) for this Service Bulletin is: “A visual examination of an interior or exterior area, installation or assembly to detect obvious damage, failure or irregularity. This level of inspection is made from within touching distance, unless otherwise specified. A mirror may be necessary to enhance visual access to all exposed surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may require removal or opening of access panels or doors. Stands, ladders or platforms may be required to gain proximity to the area being checked.”
2) For the purpose of this Service Bulletin, a Detailed Inspection (DET) is: “An intensive examination of a specific item, installation or assembly to detect damage, failure or irregularity.
Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be necessary. Surface cleaning and elaborate access procedures may be required.”
3) Obey all of the WARNINGS and CAUTIONS included in the mentioned manuals and procedures.
4) The Manuals and other documents are mentioned as acronyms or with a simplified form.
Refer to section 1.K. REFERENCES for a more complete definition.
The steps below outline the general accomplishment instructions.
The detailed sequence is included in the respective figure, when necessary.
A. Make sure that the aircraft is safe for maintenance. Refer to AMM TASK 20-00-00-910-801-A/200 - Aircraft Safety Procedures Before Maintenance - Standard Procedures.
B. PART I – LH MLG SIDE-STAY UPPER SPINDLE
(1) Open the MLG INBD doors. Refer to AMM TASK 32-12-01-860-801-A/200 - Main-Landing-Gear Inboard Door (open) - Configuration.
(2) On the LH MLG side-stay, do the GVI and make sure that the attachment parts (bolt P/N AN4-25, washer P/N NAS1149C0432R, locknut P/N MS17825-4 and cotter pin P/N MS24665-134) are correctly installed on the LH MLG side-stay upper spindle. Refer to Figure 1.
(3) If all attachment parts are installed (bolt, locking nut, washer and cotter pin), do the Step 3.B.(5).
(4) If any attachment part is missing, do as follows:
(a) Identify the missing attachment part(s) (bolt P/N AN4-25, washer P/N NAS1149C0432R, locknut P/N MS17825-4 and cotter pin P/N MS24665-134) and install it as follows ( Figure
1):
1 Apply a thin layer of Corrosion Inhibiting Compound (MEP_09-075) COR-BAN 27L to the attachment part(s) (bolt P/N AN4-25, washer P/N NAS1149C0432R, and/or locknut P/N MS17825-4) (SRM PART II 51-21-05 - FASTENER SEALING).
2 Install the attachment part(s) (bolt P/N AN4-25, washer P/N NAS1149C0432R, and/or locknut P/N MS17825-4) on the spindle.
3 Make sure that the threads of locknut P/N MS17825-4 and bolt P/N AN4-25 fully engage. The base of the locknut P/N MS17825-4 must not touch the surface.
SERVICE BULLETIN SB190E2-32-0015 Page 6 of 11 Date: Aug 05, 2022 Revision No.: 01 - Jan 27, 2023 Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16
4 Turn the locknut P/N MS17825-4 and measure the locking torque with a torque wrench.
5 Make sure that the locking torque is 0.39 - 3.39 N.m (3.5 - 30.0 lb.in).
NOTE: If you find a locknut P/N MS17825-4 that is not in the correct range, you must replace it and do steps 3, 4, and 5 again.
6 Add the locking torque value measured in step 5 to the standard torque of 1 - 3 N.m
(8.8 - 26.5 lb.in) to get the final torque.
7 Apply the final torque to locknut P/N MS17825-4 with a torque wrench, as follows:
a Tighten the locknut P/N MS17825-4 to the bolt P/N AN4-25 to remove the clearance.
b Torque the locknut P/N MS17825-4 with the minimum final torque value and continue to torque as necessary to align its slot with the cotter pin P/N MS24665-134 hole in the bolt P/N AN4-25.
NOTE: Be careful not to apply more than the maximum torque value.
8 Safety the locknut P/N MS17825-4 to the bolt P/N AN4-25 with a new cotter pin P/N MS24665-134 (AMM TASK 20-10-02-910-801-A/200 - Typical Safetying Methods - Maintenance Practices).
(b) Do the Step 3.B.(5).
(5) With a feeler gauge, do a DET inspection to measure the clearance between the spindle shoulder and the bushing flange (A) and the clearance between the bushing flange and the washer (B).
The clearance measurement (A+B) must use the criteria that follows to dispatch the aircraft (Figure 2):
(a) If the clearance dimension (A+B) is less than or equal to 0.5 mm (0.0196 in), no action is necessary.
(b) If the clearance dimension (A+B) is between 0.6 mm (0.0236 in) and 2.0 mm (0.0787 in), remove and install the LH MLG side-stay upper spindle in the next 10 Flight Cycles (FC).
Refer to AMM TASK 32-11-11-400-801-A/400 - Main-Landing-Gear Side Stay - Installation.
(c) If the clearance dimension (A+B) is more than 2.0 mm (0.0787 in), remove and install the LH MLG side-stay upper spindle. Refer to AMM TASK 32-11-11-400-801-A/400 - Main- Landing-Gear Side Stay - Installation.
(6) Close the MLG INBD doors. Refer to AMM TASK 32-12-01-860-802-A/200 - Main-Landing-Gear Inboard Door (close) - Configuration.
C. PART II – RH MLG SIDE-STAY UPPER SPINDLE
(1) Open the MLG INBD doors. Refer to AMM TASK 32-12-01-860-801-A/200 - Main-Landing-Gear Inboard Door (open) - Configuration.
(2) On the RH MLG side-stay, do the GVI and make sure that the attachment parts (bolt P/N AN4-25, washer P/N NAS1149C0432R, locknut P/N MS17825-4 and cotter pin P/N MS24665-134) are correctly installed on the RH MLG side-stay upper spindle. Refer to Figure 1.
(3) If all attachment parts are installed (bolt, locking nut, washer and cotter pin), do the Step 3.C.(5).
(4) If any attachment part is missing, do as follows:
SERVICE BULLETIN Date: Aug 05, 2022 Revision No.: 01 - Jan 27, 2023 SB190E2-32-0015 Page 7 of 11 Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16
(a) Identify the missing attachment part(s) (bolt P/N AN4-25, washer P/N NAS1149C0432R, locknut P/N MS17825-4 and cotter pin P/N MS24665-134) and install it as follows ( Figure
1):
1 Apply a thin layer of Corrosion Inhibiting Compound (MEP_09-075) COR-BAN 27L to the attachment part(s) (bolt P/N AN4-25, washer P/N NAS1149C0432R, and/or locknut P/N MS17825-4) (SRM PART II 51-21-05 - FASTENER SEALING).
2 Install the attachment part(s) (bolt P/N AN4-25, washer P/N NAS1149C0432R, and/or locknut P/N MS17825-4) on the spindle.
3 Make sure that the threads of locknut P/N MS17825-4 and bolt P/N AN4-25 fully engage. The base of the locknut P/N MS17825-4 must not touch the surface.
4 Turn the locknut P/N MS17825-4 and measure the locking torque with a torque wrench.
5 Make sure that the locking torque is 0.39 - 3.39 N.m (3.5 - 30.0 lb.in).
NOTE: If you find a locknut P/N MS17825-4 that is not in the correct range, you must replace it and do steps 3, 4, and 5 again.
6 Add the locking torque value measured in step 5 to the standard torque of 1 - 3 N.m
(8.8 - 26.5 lb.in) to get the final torque.
7 Apply the final torque to locknut P/N MS17825-4 with a torque wrench, as follows:
a Tighten the locknut P/N MS17825-4 to the bolt P/N AN4-25 to remove the clearance.
b Torque the locknut P/N MS17825-4 with the minimum final torque value and continue to torque as necessary to align its slot with the cotter pin P/N MS24665-134 hole in the bolt P/N AN4-25.
NOTE: Be careful not to apply more than the maximum torque value.
8 Safety the locknut P/N MS17825-4 to the bolt P/N AN4-25 with a new cotter pin P/N MS24665-134 (AMM TASK 20-10-02-910-801-A/200 - Typical Safetying Methods - Maintenance Practices).
(b) Do the Step 3.C.(5).
(5) With a feeler gauge, do a DET inspection to measure the clearance between the spindle shoulder and the bushing flange (A) and the clearance between the bushing flange and the washer (B).
The clearance measurement (A+B) must use the criteria that follows to dispatch the aircraft (Figure 2):
(a) If the clearance dimension (A+B) is less than or equal to 0.5 mm (0.0196 in), no action is necessary.
(b) If the clearance dimension (A+B) is between 0.6 mm (0.0236 in) and 2.0 mm (0.0787 in), remove and install the RH MLG side-stay upper spindle in the next 10 Flight Cycles (FC).
Refer to AMM TASK 32-11-11-400-801-A/400 - Main-Landing-Gear Side Stay - Installation.
(c) If the clearance dimension (A+B) is more than 2.0 mm (0.0787 in), remove and install the RH MLG side-stay upper spindle. Refer to AMM TASK 32-11-11-400-801-A/400 - Main- Landing-Gear Side Stay - Installation.
(6) Close the MLG INBD doors. Refer to AMM TASK 32-12-01-860-802-A/200 - Main-Landing-Gear Inboard Door (close) - Configuration.
SERVICE BULLETIN SB190E2-32-0015 Page 8 of 11 Date: Aug 05, 2022 Revision No.: 01 - Jan 27, 2023 Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16
D. Put the aircraft back to a serviceable condition. Refer to AMM TASK 20-00-00-910-802-A/200 - Aircraft Safety Procedures After Maintenance - Standard Procedures.
E. Write the accomplishment of PART I and/or PART II of this bulletin in the applicable documents.
NOTE: Please use the online SB evaluation form available on the FlyEmbraer portal ( http:// www.flyembraer.com). Go to "Maintenance > eTechPubs > Utilities > SB Evaluation Form" to inform us about the SBs that you have incorporated in your fleet, as well as the difficulties found during the SB incorporation.
This will allow Embraer to consider your aircraft configuration when providing future modifications.
Your feedback will be much appreciated to improve the quality of Embraer modifications.
SERVICE BULLETIN Date: Aug 05, 2022 Revision No.: 01 - Jan 27, 2023 SB190E2-32-0015 Page 9 of 11 Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16
FIGURE 1 - MLG SIDE-STAY UPPER SPINDLE - GVI (Sheet 1 of 1) EM170E2SB320009B.IDR A B DO A VISUAL INSPECTION TO MAKE SURE THAT ALL THE ATTACHMENT PARTS ARE CORRECTLY INSTALLED.1 1 B BOLT PN AN4-25 WASHER PN NAS1149C0432R
LOCKNUT PN MS17825-4
COTTER PIN PN MS24665-134 A
SERVICE BULLETIN SB190E2-32-0015 Page 10 of 11 Date: Aug 05, 2022 Revision No.: 01 - Jan 27, 2023 Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16