TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'cab6e89d9ee9ed5dcab52ddd1f9a9a0e398f04bfe66bf1c7ead9f08040e3210b' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'cab6e89d9ee9ed5dcab52ddd1f9a9a0e398f04bfe66bf1c7ead9f08040e3210b' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
. SERVICE BULLETIN .
Revision 1. Nov 09/09 6000ELM-24-614
Formerly Smiths Aerospace
TO: ALL HOLDERS OF SERVICE BULLETIN 6000ELM-24-614, DATED 8th May 2003.
FROM: GE AVIATION SYSTEMS LTD On May 4th 2007 the Aerospace business of Smiths Group, formally known as Smiths Aerospace Ltd, was sold to General Electric Corporation and became GE Aviation Systems Ltd, doing business as GE Aviation.
This page transmits Revision No. 1 to Service Bulletin 6000ELM-24-614. Revision No. 1 replaces Service Bulletin 6000ELM-24-614, dated 8th May 2003 in its entirety.
This revision corrects the following errors:
1. The circuits shown as Figure 2 and Figure 3 fail ed to show the presence of a circuit breaker in position C1. Additionally they both failed to show that the circuit breaker shown in position E8 is only fitted in 6069ELM1 panels. The procedure has been amended so that Row D is worked first in order that the 5-tag busbar, which is removed from Row D, is used on Row C.
2. On Page 14 paragraph 2.A.(30) details the selecti on of labels which are used to identify the circuit breakers on a specific row. Paragraph (30)(f) listed the following:
Label Row E, part no. ELM812-36E when this should have read Label Row E, part no. ELM812-40E
3. Paragraphs (31) through (36) detail the fitting of the labels, making reference to the specific panel part numbers to which each label is applicable. References to panels 6069ELM1 should have read 6058ELM1 and references to panels 6058ELM1 should have read 6069ELM1.
Both the above errors were repeated in the conversion kit details on page 18.
NOTE: Operators of 6058ELM1 or 6069ELM1 panels who carried out the work affected by the errors referred to above in paragraphs (30) through (36) from the original document (i.e. pre revision 1) will need to carry out the procedures in new paragraphs (37) and (38) to return their panels to the correct standard.
Changed material is indicated with revision bars.
No text on this page: it may be a figure. Open the PDF to see it.
GEK 115335 For Europe, Africa, India and Middle East contact:
GE Aviation Customer Services - Cheltenham Bishops Cleeve, Cheltenham, Glos GL52 8SF, United Kingdom T: + 44 (0)1242 673355 F: + 44 (0)1242 669165 For Asia, Australasia and the Pacific contact:
GE Aviation 3 Hakea Street, Brisbane Airport, QLD4007, Australia T: + 61 7 3860 0700 F: + 61 7 3860 0701 For the Americas contact:
GE Aviation Customer Services – Clearwater P.O. Box 9013, Clearwater, FL 33758 United States of America T: + 1 (727) 539 1631 F: + 1 (727) 539 0680 GLOBAL CONTACT: cs.support@ge.com CAGE CODE: K5294 GE Ref: SCD Revision AL, Ref: 3.7.4.134.1, 134.14, 134.17 Manual Ref: N/A
SERVICE BULLETIN
Copyright (2009), GE Aviation Systems Ltd UK The information contained in this document is GE Aviation Systems Ltd proprietary in formation and is disclosed in confidence. I t is the property of GE Aviation Systems Ltd and shall not be used, discl osed to others or reproduced wit hout the express written consen t of GE Aviation Systems Ltd, including, but without limitation, it is not to be used in the creation, manufacture, development, or der ivation of any repairs, modifications, spar e parts, design, or configuration changes or to obtain FAA or any other government or regulatory ap proval to do so. If consent is given for reproduction in whole or in part, this notice and the notice set forth on each page of this docu ment shall appear in any such reproduction in whole or in part. The informat ion contained in this document ma y also be controlled by U.S. export control laws. Unauthorized export or re-export is prohibited.
All technical documentation and information contained herein, with respect to assembly and disassembly, cleaning, inspection methods and limits, repair methods and limits, operational limits, life limits and the like, have been developed and approved for use with this equipment and parts that have been manufactured and/or approved by GE and that have been maintained in accordance with GE technical documentation and recommendations. GE has no contractual or legal obligation for, nor knowledge of, non-GE-approved parts and repairs. Accordingly, this document is not intended to apply to non-GE-approved parts and repairs.
DESTINATION CONTROL STATEMENT The technical data contained in this document (or file) is controlled for export under the Export Administration Regulations (EAR), 15 CFR Parts 730-774, ECCN: 9E991. Violations of these laws may be subject to fines and penalties under the Export Administration Act.
May 08/03 6000ELM-24-614 Revision No.1. Nov 09/09 Page1 of 20 ELECTRICAL POWER – P210 RIGHT POWER MANAGEMENT PANEL PANELS 6058ELM1, 6066ELM1 AND 6069ELM1 REQUIRING CTU, P210 PASSENGER TELECOMMUNICATION SYSTEM
AND CABIN FILESERVER/DISK DRIVE UNIT
WITH FLIGHT DECK SWITCH INTERFACE
1. PLANNING INFORMATION A. Effectivity
(1) Aircraft affected: Refer to BCAG Service Bulletin Number 777-24-0077
(2) Unit affected: P210 Right Power Management Panel
(3) Part Numbers: GE Part No. Boeing Part No.
60**ELM* S281W601-60** Where * equals any number.
. SERVICE BULLETIN .
May 08/03 6000ELM-24-614 Revision 1. Nov 09/09 Page 2
GE Proprietary Information – subject to the restrictions on the cover or first page
B. Concurrent Requirements This bulletin is one of a number that detail the work required to be embodied on the P210 panel to accommodate Flight Deck Switch circui try. This Service Bulletin should be carried out after Service Bulletins 6000ELM-24-555, 6000ELM-24-456, 6000ELM-24-545 and 6000ELM-24-624.
C. Reason
(1) Condition Conversion corrects The P210 ELMS panel is unable to accommodate the Cabin Telecommunication Unit (CTU), the P210 Passenger Telecommunication System and the Cabin File Server/Disk Drive Unit as required by the Flight Deck Switch circuitry.
(2) Extent condition encountered Panels 6058ELM1, 6066ELM1 and 6069ELM1.
(3) Expected benefits of conversion The P210 ELMS panel complies with the requirement to accommodate the CTU, P210 Passenger Telecommunication System and the Cabin File Server/Disk Drive Unit as required by the Flight Deck Switch circuitry.
D. Description This work requires the removal of three busbars and busbar connections at Circuit Breakers C6 (C23430 – CTU), D3/E5 (C23432/C23434 P210 Passenger Telecommunication System) and E7 (C23454 – Cabin File Server/Disk Drive Unit). These four Circuit Breakers are then connected to another supply via the contacts of an existing relay K24302. Three new busbars are fitted and the busbar connections removed earlier are then reconnected. One new wire and six new Flexible Bus cables are introduced as a result of this work. Figures 2 to 4 refer.
E. Compliance ELMS P210 Right Power Management Panels as defined in BCAG Service Bulletin Number 777-24-0077.
F. Approval The repairs and modifications herein comply with the applicable regulations and are on record with the supplier as FAA-approved, as well as EASA/JAA approved.
G. Manpower The incorporation of this work will take approximately 4 man hours excluding testing.
. SERVICE BULLETIN .
May 08/03 6000ELM-24-614 Revision 1. Nov 09/09 Page 3
GE Proprietary Information – subject to the restrictions on the cover or first page
H. Material and Availability The conversion kit, part number 6000ELM-24-614, is currently available and is rechargeable.
For details of the contents of the conversion kit, refer to paragraph 3 of this Service Bulletin.
For details of the price and availability of the conversion kit, refer to the supplementary page of this Service Bulletin. For further information contact either:
GE Aviation, Spares & Repairs Dept. CSD1, Bishops Cleeve, Cheltenham, Glos. GL52 8SF, England or GE Aviation, Customer Services - Clearwater, P.O. Box 9013, Clearwater, FL 33758, United States of America I. Tooling Required In addition to standard airplane electrical wiring tools the following specialist tooling (or equivalent) is required:
(1) Crimp Plier, Part No. M22520/1-01.
(2) Positioner, Part No. M22520/1-02.
(3) Crimp Plier, Part No. AMP 525692.
(4) Insertion/Extraction Tool, Part No. M81969/14-04 (Yellow/White).
J. Weight and Balance None.
K. Electrical Load Data Refer to BCAG Service Bulletin Number 777-24-0077.
L. Reference
(1) BCAG Aircraft Maintenance Manual.
(2) BCAG Service Bulletin Number 777-24-0077.
M. Other Publications Affected BCAG Aircraft Maintenance Manual.
SERVICE BULLETIN
RIGHT POWER MANAGEMENT PANEL, P210
SEE A SEE
MAIN EQUIPMENT CENTER ACCESS DOOR, 117AL FWDE
MAIN EQUIPMENT CENTER (A Airplane Connectors B) P210 Right Power Management Panel (Left Hand Door & EU Door not illustrated) Figure 1 May 08/03 6000ELM-24-614 Revision 1. Nov 09/09 Page 4 GE Proprietary Information - subject to the restrictions on the cover or first page
SERVICE BULLETIN
- C28403
PHASE A }-c30408
PHASE B Applicable to 6069ELM1 panels only - c35423 3-c28716 }-C26415 -CTÉÁ00 PHASE C 3B c23310 121314 3723309 3. 02$303
- 29-11-12 115V AC Right Section 1 Bus Before Conversion Figure 2 R421 / 1 DM24405C W3202-1002-22• - W3202-1049-22• M24405 DM24405A TYPE A TB407/2 M24403 ELMS P210 ELECTRONIC UNIT May 08/03 6000ELM-24-614 Revision 1. Nov 09/09 Page 5 GE Proprietary Information - subject to the restrictions on the cover or first page
SERVICE BULLETIN
PHASE A
PHASE B 6069ELM1 panels only }r- c254031 →-C7·å00 3- c35423 3-C26415 Applicable to PHASE C · 23310 c2ŸŠ14 · c23309 ·c25303 W3205-0100-8 W3205-0098-8 29-11-12 115V AC Right Section 1 Bus After Conversion Figure 3 TB421/1 TB407/2 CONDITIONING CARD DM24405C DP 415 -W3204-0592-22 W3202-1002-22 - W3202-1049-22 DM24405A TYPE TB407/2 W3202-0134-22 M24403 P210 ELMS ELECTRONIC UNIT D 21003 May 08/03 6000ELM-24-614 Revision 1. Nov 09/09 Page 6 GE Proprietary Information - subject to the restrictions on the cover or first page
. SERVICE BULLETIN .
May 08/03 6000ELM-24-614 Revision 1. Nov 09/09 Page 7
GE Proprietary Information – subject to the restrictions on the cover or first page
CTU, P210 Passenger Telecommunication System and Cabin File Server/Disk Drive Unit Flight Deck Switch Power Distribution from Relay K24302 After Conversion Figure 4
ув)
SERVICE BULLETIN 10-position Relay Bracket Assembly Relay Base® DK24302 Land Relay K24302 K24013 000 Cabinet Assembly - Typical Layout Figure 5 May 08/03 6000ELM-24-614 Revision 1. Nov 09/09 Page 8 GE Proprietary Information - subject to the restrictions on the cover or first page
. SERVICE BULLETIN .
May 08/03 6000ELM-24-614 Revision 1. Nov 09/09 Page 9
GE Proprietary Information – subject to the restrictions on the cover or first page
2. ACCOMPLISHMENT INSTRUCTIONS WARNINGS: FAILURE TO FOLLOW THE APPLICABLE INSTRUCTIONS GIVEN IN THIS PUBLICATION AS AMENDED BY GE REVISIONS MAY ENDANGER SAFETY.
THIS DOCUMENT ONLY COVERS IMPLEMENTATION OF THE REFERENCED CHANGE. IT DOES NOT ADDRESS PRE OR POST-IMPLEMENTATION TASKS.
TO ENSURE THE SAFETY OF PERSONNEL IMPLEMENTING THE WORK,
REFERENCE MUST BE MADE TO ALL INSTRUCTIONS REGARDING SAFETY RELATED PROCEDURES (E.G. POWER DOWN) DETAILED IN THE AIRCRAFT MAINTENANCE MANUAL.
NOTES: 1. During the embodiment of this Service Bulletin any Anti-Abrasion Tape (part number 1756-746), Lacing Tape or Heatshrink (part number 1837-1909-02), which has to be removed is to be replaced from customers own resources.
2. During the embodiment of this Service Bulletin most labels that are to be fitted must be positioned in the same location as the old label they are replacing, the old label must be entirely removed. Ho wever, labels containing Circuit Breaker titles and/or Bus information may be placed over the existing label if necessary.
3. In order to improve access to specified connectors it is acceptable to disconnect other connectors or remove hardware as necessary. Operators must ensure that any such disturbances are noted and returned to their original state before this work is completed.
A. Embodiment Instructions
(1) Refer to Figure 1 and on the P210 Right Power Management Panel proceed as follows:
(a) Release the 2-off fasteners on the Right Hand (RH) Door. Open and engage the RH Door stay.
(b) Release the 4-off fasteners on the Left Hand (LH) Door. Open and engage the LH Door stay.
(2) Unlock the 2-off captive screws securing the LH Relay Panel and lower to the horizontal position. Repeat this procedure for the RH Relay Panel.
(3) On the LH Door, locate the 5-tag Busbar in row D linking Circuit Breakers D1 to D5.
(4) Refer to Figure 2 and remove the CB Screw Assemblies securing the 5-tag Busbar to Circuit Breakers D1 to D5. Note the position of the Flexible Cable Assembly that links Circuit Breaker D1 to A2 terminal B1. Retain the CB Screw Assemblies and also retain the 5-tag Busbar.
. SERVICE BULLETIN .
May 08/03 6000ELM-24-614 Revision 1. Nov 09/09 Page 10
GE Proprietary Information – subject to the restrictions on the cover or first page
(5) From the conversion kit, select the following items:
(a) 2-tag, 60 Amp Busbar, part no. 80-268-208-02.
(b) 5-inch 60 Amp Flexible Cable Assembly, part number 40-761-146-05.
(c) Yellow Heatshrink Sleeve, part number 1837-1907-02.
(6) Refer to Figure 3 and fit the new 2-tag Busbar into position over terminal 1 of Circuit Breakers D1 to D2. Secure in position using two of the retained CB Screw Assemblies. Reconnect the Flexible Cable A ssembly linking Circuit Breaker D1 to A2 terminal B1.
CAUTION: DURING THIS CONVERSION ALL CIRCUIT BREAKER TERMINAL SCREWS MUST BE TORQUE LOADED TO BETWEEN 13.50 AND 16.50 LBF INCHES (1.5 AND 1.8 Nm).
(7) Prepare the 60 Amp Cable Assembly as follows:
(a) Cut two lengths of Yellow Heatshrink Sleeve, each approximately ½ inch long.
(b) Refer to Figure 6 below, then fit a Yellow Heatshrink Sleeve to each end of the new Flexible Cable Assembly for Phase B identification.
(c) Using a heatgun, apply direct heat to the sleeves until secure .
Cable Assembly
Figure 6
(8) Return to the LH door and refer to Figure 3. Using the retained CB Screw Assemblies, connect the new 5-inch Flexible Cable Assembly as follows:
Cable Assembly to be fitted (LH Door Assembly) From Circuit Breaker To Circuit Breaker Length Sleeve Colour D2 terminal 1 D5 terminal 1 5 inches Yellow