Copy · CF34-10E SB 72-0365 R04 · 23 pages

© General Electric Company. Filed by the FAA in regulations.gov docket FAA-2021-0699; AD 2022-05-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'bee14574076ef9f497e189b8ab1c512c1a3a01bb11c63ebd29e6cca6b2ba31eb'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

CF34-10E Service Bulletins (SBs) SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check Date Printed:

2021/04/29 GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or reproduced without the express written consent of GE. Technical data is considered ITAR and/or EAR controlled; transfer of this data to a Non-US Person, without USG authorization, is strictly prohibited.

Page 1 of 23 CF34-10E SERVICE BULLETIN - 72-0365 R04 Revised:04/27/2021 SB 72-0365 R04 ENGINE - GENERAL (72-00-00) - STRAINER ASSEMBLY SCREEN

INSPECTION FOR TEFLON MATERIAL CHECK Issued:

05/08/2020 GE Designated: -CONFIDENTIAL- The information contained in this document is GE proprietary information and is disclosed in confidence. It is the property of GE and shall not be used, disclosed to others or reproduced without the express written consent of GE, including, but without limitation, it is not to be used in the creation, manufacture, development, or derivation of any repairs, modifications, spare parts, designs, or configuration changes or to obtain FAA or any other government or regulatory approval to do so. If consent is given for reproduction in whole or in part, this notice and the notice set forth on each page of this document shall appear in any such reproduction in whole or part.

This technical data is considered subject to the Export Administration Regulations (EAR) pursuant to 15 CFR Parts 730-774. Transfer of this data by any means to a Non-U.S. Person, whether in the United States or abroad, without the proper U.S.

Government authorization (e.g., License, exemption, NLR, etc.), is strictly prohibited.

Copyright (2021) General Electric Company, U.S.A.

TRANSMITTAL INFORMATION REVISION 4 TO SERVICE BULLETIN 72-0365 Revision 4 is issued to update paragraph 4., .APPENDIX - A Revision 3 was issued November 16, 2020. Revision 2 was issued August 07, 2020.

Revision 1 was issued June 30, 2020. The original was issued May 08, 2020. Revision bars in the left margin identify changes.

1. PLANNING INFORMATION A. Effectivity * * * CF34-10E This Service Bulletin is applicable to these CF34-10E engines:

*CF34-10E engines, serial numbers 424714 through 424892.

NOTE:These engines have a stationary seal manufactured with epoxy adhesive EA9658 from production.

OR *Any engine that has had a stationary seal P/N or P/N replaced orB1316-00453 B1316-01274 repaired after September 2014 per GEK 112081, 72-22-08, REPAIR 001.

NOTE:These engines could have a replaced stationary seal manufactured with epoxy adhesive EA9658 from new make or a stationary seal repaired with epoxy adhesive EA9658.

NOTE:If an engine has had a shop visit in September 2014 or later, it is the operator's responsibility to review the engine shop records to determine if the stationary seal P/N or P/N has been replaced or repaired.B1316-00453 B1316-01274 NOTE:Engine serial numbers (ESNs) 994111 through 994999 and 424101 through 424713 were not impacted from production because these engines were built before the change to the epoxy adhesive EA9658 was introduced. Make sure to review the engine shop records as specified in the above NOTE 2 for applicability.

AND *High thermal stability (HTS) or high performance capability (HPC) oil is currently or has been used in the engine anytime after September 2014. Refer to CF34-10E S/B .79-0004 NOTE:The affected stationary seals are the ones installed in the applicable engines specified in paragraph 1.A., and that have operated with HTS/HPC oils for more than 56 flightEffectivity hours (FH).

Engines with the affected stationary seal operated 56 FH or less with HTS/HPC

CF34-10E Service Bulletins (SBs) SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check Date Printed:

2021/04/29 GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or reproduced without the express written consent of GE. Technical data is considered ITAR and/or EAR controlled; transfer of this data to a Non-US Person, without USG authorization, is strictly prohibited.

Page 2 of 23 oils are not affected by this Service Bulletin, if the oil has been changed to non-HTS/HPC oil.

NOTE:Engines with affected seal that have operated with HTS/HPC oils for more than 56 FH have to be inspected per the recommended intervals specified in paragraph 1.C., .Compliance If the operator elects to change to non-HTS/HPC oil before 56 FH on the affected stationary seal operated with HTS/HPC oils, procedure to change oil specified in paragraph 6., must be done.APPENDIX - C B. Description This Service Bulletin provides instructions to do a periodic inspection of the A-sump strainer (strainer assembly) for Teflon particles. If Teflon particles are found in the strainer assembly, this indicates that the stationary seal may be failing. If enough Teflon particles are captured in the strainer assembly, the A-sump scavenge system will be plugged resulting in overboard loss of oil and loss of oil pressure which may result in an in-flight shutdown (IFSD).

C. Compliance Category 2 GE recommends that you do this Service Bulletin per the below inspection threshold intervals:

*For engines with less than 2,250 FH on the affected stationary seal, do the first inspection as soon as possible after the engine reaches 2,250 FH, but no later than 2,350 FH.

*For engines with 2,250 FH or more, but less than 10,000 FH on the affected stationary seal, do the first inspection within the next 100 FH.

*For engines with less than 9,500 FH on the affected stationary seal, as of the issuance of Revision 2 of this Service Bulletin, GE recommends that the engine be sent to a service center to have the stationary seal repaired or replaced by 10,000 FH.

*For engines with 9,500 FH or more on the affected stationary seal, as of the issuance of Revision 2 of this Service Bulletin, GE recommends that the engine be sent to a service center to have the stationary seal repaired or replaced within the next 500 FH.

Once the first inspection of the affected stationary seal has been completed, do the inspection of the affected stationary seal per the following inspection intervals:

*Every 750 FH for engines with the stationary seal that have 2,250 FH to 7,000 FH.

*Every 375 FH for engines with the stationary seal that have 7,001 FH to 10,000 FH.

*Every 100 FH for engines with the stationary seal that have more than 10,000 FH.

If customer/shop is not able to confirm what oil has been used in the engine or if the affected stationary seal was repaired in the past, it is recommended to comply with this Service Bulletin.

Impact B This recommendation is to address a condition that may result in an Increased Rate of In-Flight Shutdowns (IFSD), Take-Off Aborts (TOA), Air Turn Backs (ATB) or Diversions (DIV).

NOTE:This Service Bulletin can be accomplished on wing or in shop.

This Service Bulletin is offered to improve the reliability or performance of your GE product, or to help prevent the occurrence of the event or condition described in this Service Bulletin. If the operator elects not to participate in the bulletin, that decision will be taken into consideration by GE in evaluating future product performance issues that may arise in the operator's fleet.

D. Concurrent Requirements None.

E. Reason

(1) Objective:

To reduce significant events.

(2) Condition:

Since October 2018, the CF34-10E fleet has experienced several IFSDs and unexpected engine removals (UERs) as a result of the stationary seal polytetrafluoroethylene [PTFE (Teflon)] disbonding from the aluminum housing when used with HTS or HPC oils.

(3) Cause:

The properties of the adhesive used on the affected stationary seals deteriorate, resulting in disbonding of the Teflon abradable from the aluminum housing. The stationary seal deterioration is accelerated by the exposure to higher than expected temperatures and to

CF34-10E Service Bulletins (SBs) SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check Date Printed:

2021/04/29 GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or reproduced without the express written consent of GE. Technical data is considered ITAR and/or EAR controlled; transfer of this data to a Non-US Person, without USG authorization, is strictly prohibited.

Page 3 of 23 HTS or HPC oil.

(4) Inspection:

Do an inspection of the strainer assembly as specified in paragraph 1.C., forCompliance all engines that operate under these three conditions:

(a) Engines with the affected stationary seal operated more than 56 FH with HTS or HPC oil class E/G. Refer to CF34-10E S/B .79-0004

(b) Engines with a stationary seal manufactured or repaired with epoxy adhesive EA9658 (repaired or installed in September 2014 or later). Refer to GEK 112081, 72-22-08, REPAIR 001.

(c) Engines where the affected stationary seal has accumulated 2,250 FH or more since installation or repair.

For engines with less than 9,500 FH on the affected stationary seal, as of the issuance of Revision 2 of this Service Bulletin, GE recommends that the engine be sent to a service center to have the stationary seal repaired or replaced by 10,000 FH.

For engines with 9,500 FH or more on the affected stationary seal, as of the issuance of Revision 2 of this Service Bulletin, GE recommends that the engine be sent to a service center to have the stationary seal repaired or replaced within the next 500 FH.

(5) Substantiation:

Substantiation is by analysis.

F. Approval This Service Bulletin contains no modification information that revises the approved configuration and therefore does not require FAA or regulatory approval.

G. Manpower After you get access to the strainer assembly, you will need approximately 1.0 man-hour to do the inspection portion of this Service Bulletin.

If borescope inspection (BSI) for fly-on allowance is performed per paragraph

4., , consider the following estimated labor hours:APPENDIX - A *1.5 hours to do a BSI through the plug S1 on the HPC.

*0.5 hour to do a BSI through the 2:00 or 3:00 o'clock position (or any adjacent door) variable by-pass valve (VBV) door.

H. Weight and Balance Weight and balance are not changed.

I. References (Use the latest version of these documents) GEK 9250, Commercial Engine Standard Practices Manual (SPM) GEK 112081, CF34-10E Engine Manual (EM) GEK 112081-1, CF34-10E Line Maintenance Manual (LMM) GEK 112082, CF34-10E Illustrated Parts Catalog (IPC) GEK 112085, CF34-10E Illustrated Tool and Equipment Manual (ITEM) CF34-10E S/B , Oil - General (79-00-00) - Approved Oils79-0004 J. Publications Affected None.

K. Interchangeability Not applicable.

L. Software Accomplishment Summary Not applicable.

2. MATERIAL INFORMATION A. Material - Price and Availability

(1) Parts necessary to do this Service Bulletin:

None.

(2) Other Spare Parts:

Part Number Qty/ Eng Part Name Unit ($) Price Pkg Qty Lead Time Days 1963M80P15 (1) Packing, Preformed Quote (-) Quote J1438P022 (ALT) Packing, Preformed Quote (-) Quote 1963M80P40 (1) Packing, Preformed Quote (-) Quote J1438P905 (ALT) Packing, Preformed Quote (-) Quote 1963M80P07 (1) Packing, Preformed Quote (-) Quote J1438P014 (ALT) Packing, Preformed Quote (-) Quote 1963M80P17 (1) Packing, Preformed Quote (-) Quote J1438P029 (ALT) Packing, Preformed Quote (-) Quote NOTE:Prices are provided for planning purposes and are subject to change.

(3) Consumables:

Code Number Description

CF34-10E Service Bulletins (SBs) SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check Date Printed:

2021/04/29 GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or reproduced without the express written consent of GE. Technical data is considered ITAR and/or EAR controlled; transfer of this data to a Non-US Person, without USG authorization, is strictly prohibited.

Page 4 of 23 C02-019 Oil, Engine Lubricating (engine oil) C03-001 Primer, Zinc Chromate C04-002 Solvent, General (Stoddard solvent) Deleted C10-182 Cloth, Cleaning for Aircraft Structural (cleaning cloth) B. Industry Support Information Contact your Customer Support Manager (CSM), reference D-1367.

C. Configuration Chart None.

D. Parts Disposition Discard the preformed packings (05-375, 72-63-00) and (05-355) if exposed.

The screw thread plug (05-380), the strainer assembly (05-360), the double hexagon self-locking nut (nut) (05-370) and the flat washer (05-365) can be reused. Refer to in paragraph 3., of thisFigure 1 ACCOMPLISHMENT INSTRUCTIONS Service Bulletin for referenced items.

E. Tooling - Price and Availability Tool Number Description 10C1253 Fixture, Puller - Accessory Gearbox Scavenge Screens (puller fixture) ( (or equivalent)Figure 2) Local Purchase XLG3 Flexible Borescope with probe 3.9 mm diameter with tip forward view PXT480FG (silver) and tip side view PXT480SG (brown)

3. ACCOMPLISHMENT INSTRUCTIONS A. Inspection

(1) Do an inspection of the strainer assembly (05-360, 72-63-00, as follows:Figure 1)

(a) Remove the screw thread plug (05-380) from the strainer assembly (05-360).

(b) Remove and discard the preformed packing (05-375) from the screw thread plug (05-380).

(c) Use the 10C1253 puller fixture ( or equivalent to remove the strainerFigure 2) assembly (05-360, 72-63-00, as follows:Figure 1) 1 Remove the nut (05-370) and flat washer (05-365) that attach the strainer assembly (05-360) to the stud on the accessory gearbox (AGB) main assembly.

2 Put the puller adapter (Item 01, into the strainer assembly (05-360,Figure 2) 72-63-00, Figure 1).

3 Lightly hit the body dent puller (Item 02, to the opposite side toFigure 2) remove the strainer assembly (05-360, 72-63-00, Figure 1).

4 Remove and discard the preformed packing (05-355).

(d) Do a visual inspection of the strainer assembly (05-360) for evidence of particles of Teflon material. Refer to and do as follows:Figure 3 NOTE:A visual standard to help maintenance personnel to identify the Teflon particles from other particles commonly found in the screen is posted on :myGEAviation.com *Log on to myGEAviation.com *Documents *Technical Presentations *Reference Materials 1 If you find Teflon particles in the strainer assembly (05-360, 72-63-00, Figure screen this means that the stationary seal has deterioration of Teflon and you1) must continue with paragraph 4., for further instructions.APPENDIX - A 2 If you do not find Teflon particles in the strainer assembly (05-360), engine removal for stationary seal replacement is not necessary and you can continue with the recurrent inspections of the strainer assembly (05-360). Continue with the step 3.A.(1)(e) of this Service Bulletin to install again the strainer assembly (05-360).

(e) Clean and flush the strainer assembly (05-360, 72-63-00, as follows:Figure 1) 1 Alternative Procedures Available. Clean the strainer assemblies (05-360). Refer to GEK 9250, 70-21-03, CLEANING METHOD NO. 3 - STEAM CLEANING.

2 Alternative Procedure. Clean the strainer assemblies (05-360, 72-63-00, Figure Refer to GEK 9250, 70-21-21, CLEANING METHOD NO. 21 - CARBON REMOVAL BY1).

AQUEOUS BASE CARBON REMOVER.

3 Alternative Procedure. Clean the strainer assemblies (05-360, 72-63-00, Figure Refer to GEK 9250, 70-21-22, CLEANING METHOD NO. 22 - LIGHT DUTY AQUEOUS1).

CLEANING.

4 Alternative Procedure. Clean the strainer assembly (05-360, 72-63-00, Figure 1) as follows:

CF34-10E Service Bulletins (SBs) SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check Date Printed:

2021/04/29 GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or reproduced without the express written consent of GE. Technical data is considered ITAR and/or EAR controlled; transfer of this data to a Non-US Person, without USG authorization, is strictly prohibited.

Page 5 of 23 WARNING:REFER TO THE PRODUCT LABEL AND THE MANUFACTURER'S (MATERIAL) SAFETY DATA SHEET (SDS) FOR INSTRUCTIONS ON THE HAZARDS, STORAGE, SAFE HANDLING AND PROPER USE OF THIS PRODUCT.

a Use Stoddard solvent (C04-002) to clean the strainer assembly (05-360) as follows:

1) Use a clean container partially filled with Stoddard solvent (C04-002).

2) Immerse the strainer assembly (05-360) and shake it in the Stoddard solvent (C04-002) to dislodge the contamination material. If necessary, do this step again.

3) Soak a lint-free cleaning cloth (C10-182) in Stoddard solvent (C04-002).

4) Scrub any contamination material from the strainer assembly (05-360) and mesh, if necessary, by brushing or wiping.

5) Wipe the surface dry with a different clean lint-free cleaning cloth (C10-182).

6) Deleted.

7) Fully flush with clean and fresh water.

WARNING:USE EYE PROTECTION WHEN YOU USE COMPRESSED AIR TO CLEAN, COOL, OR DRY PARTS OR TOOLS. PARTICLES CAN CAUSE AN INJURY TO YOUR EYES. ENSURE COMPRESSED AIR PRESSURE IS LESS THAN 30 PSIG (207 KPA). DO NOT POINT COMPRESSED AIR AT YOURSELF OR OTHER PERSONS.

8) Dry the strainer assembly (05-360) with filtered pressurized air at 20 to 30 psig (138 to 207 kPa gage).

(f) Install the strainer assembly (05-360, 72-63-00, removed in step 3.A.(1)(c)Figure 1) as follows:

WARNING:REFER TO THE PRODUCT LABEL AND THE MANUFACTURER'S (MATERIAL) SAFETY DATA SHEET (SDS) FOR INSTRUCTIONS ON THE HAZARDS, STORAGE, SAFE HANDLING AND PROPER USE OF THIS PRODUCT.

1 Apply engine oil (C02-019) to the preformed packing (05-355) and to the threads of the stud at the strainer assembly (05-360) installation location.

2 Install the strainer assembly (05-360) with the preformed packing (05-355) on the AGB main assembly housing front.

3 Secure the strainer assembly (05-360) to the AGB main assembly housing front with the nut (05-370) and the flat washer (05-365) and do as follows:

a Torque the nut (05-370) to 36 to 40 lb in. (4.0 to 4.5 Nm).

(g) Install the screw thread plug (05-380) on the strainer assembly (05-360) as follows:

WARNING:REFER TO THE PRODUCT LABEL AND THE MANUFACTURER'S (MATERIAL) SAFETY DATA SHEET (SDS) FOR INSTRUCTIONS ON THE HAZARDS, STORAGE, SAFE HANDLING AND PROPER USE OF THIS PRODUCT.

1 Apply engine oil (C02-019) to the preformed packing (05-375).

2 Attach the preformed packing (05-375) to the screw thread plug (05-380).

3 Install the screw thread plug (05-380) on the strainer assembly (05-360) and do as follows:

a Torque the screw thread plug (05-380) to 125 to 135 lb in. (14.1 to 15.2 Nm).

(2) Deleted.

B. Program Support

(1) An optional program support is available for data collection on engines removed and/or borescope inspected for further engineering evaluation, and to revise the content of this Service Bulletin. Contact GE Aviation Fleet Support to one of the contacts below and send the information that follow:

E-mail (USA): aviation.fleetsupport@ge.com E-mail (China and Asia): aviation.fleetsupport.cn@ge.com U.S.A. Phone: (513) 552-3272 International Phone: (513) 552-3272 China & Asia Phone: +86 21 38777666

(a) Send strainer assembly (05-360) pictures with Teflon material.

(b) Send records of the oil consumption, pressure, and temperature.

(c) Send BSI video and/or pictures of the stationary seal.

Page 6OCROpen in PDF

CF34-10E Service Bulletins (SBs) SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check FWD.

(05-370) (05-365) (05-355) (05-360) ALL IPC REFERENCES FROM NOTE: (05-380) (05-375) 72-63-00 UNLESS SPECIFIED DIFFERENTLY. 6013956-00 AGB Main Assembly Locator Figure 1 GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or Date Printed: reproduced without the express written consent of GE. Technical data Page 2021/04/29 considered ITAR and/or EAR controlled; transfer of this data to a Non-US 6 of 23 Person, without USG authorization, is strictly prohibited.

Page 7OCROpen in PDF

CF34-10E Service Bulletins (SBs) SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check

STRAINER

ASSEMBLY (TYPICAL) ITEM 01 ITEM 02 LEGEND:

ITEM 01 PULLER ADAPTER ITEM 02 BODY DENT PULLER NOTE:

ITEM NUMBERS AGREE WITH ITEM NUMBERS OF TOOL, 10C1253. 6013957-00 10C1253 Puller Fixture Figure 2 PROPRIETARY INFORMATION - Not to be used, disclosed to others or Date Printed: reproduced without the express written consent of GE. Technical data Page 2021/04/29 considered ITAR and/or EAR controlled; transfer of this data to a Non-US 7 of 23 Person, without USG authorization, is strictly prohibited.

Page 8OCROpen in PDF

CF34-10E Service Bulletins (SBs) SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check 6013958-00 Particles of Teflon Material in Strainer Assembly Figure 3 (Sheet 1) GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or Date Printed: reproduced without the express written consent of GE. Technical data Page 2021/04/29 considered ITAR and/or EAR controlled; transfer of this data to a Non-US 8 of 23 [Person, without USG authorization, is strictly prohibited.

Page 9OCROpen in PDF

CF34-10E Service Bulletins (SBs) SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check 6017377-00 Particles of Teflon Material in Strainer Assembly Figure 3 (Sheet 2)

4. APPENDIX - A If you find Teflon particles in the strainer assembly, it is necessary to remove the engine from service and send the engine to a service center for the replacement oi the aifectec stationary seal, however, five cycles fly-on for engine repositioning could be permitted if the following procedure is performed:

(1) If not already performed, remove the strainer assembly (05-360, 72-63-00, Figure 1) as specified in step 3.A.(1)(c) of this Service Bulletin.

(2) Remove all Teflon particles from the strainer assembly and put them in a table. Refer to Figure 3 and do as follows:

(a) Count the total quantity of Teflon particles.

(b) No fly-on is permitted if the total quantity of Teflon particles (any size) is more than 20 particles.

(3) Review maintenance records to make sure that the oil consumption, pressure, and temperature are within limits and as follows:

(a) No fly-on is permitted if any oil parameter is not within limits.

GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or Date Printed: reproduced without the express written consent of GE. Technical data Page 2021/04/29 considered ITAR and/or EAR controlled; transfer of this data to a Non-US 9 of 23 Person, without USG authorization, is strictly prohibited.

CF34-10E Service Bulletins (SBs) SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check Date Printed:

2021/04/29 GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or reproduced without the express written consent of GE. Technical data is considered ITAR and/or EAR controlled; transfer of this data to a Non-US Person, without USG authorization, is strictly prohibited.

Page 10 of 23

(4) Clean the electrical chip detector (01-450, 72-00-05, and self-closing valveFigure 4) (01-430). Refer to GEK 112081-1, 77-00-00, REMOVAL 008 and REMOVAL 018.

(5) Do a BSI of the stationary seal through the forward sump seal air tube (05-100, 72-00-01, for evidence of missing or unbonded Teflon material in the track as follows:Figure 5)

(a) Alternative Procedure Available. Get access through the plug S1 on the high pressure compressor at the 2:00 o'clock position directly upstream to reach the pressurization tube between the struts of the fan hub frame (FHF) at the 2:00 or 3:00 o'clock position. Refer to Figure 6.

(b) Alternative Procedure. Get access through the VBV door at the 2:00 or 3:00 o'clock position (or any adjacent door) to reach the pressurization tube between the struts of the FHF at the 2:00 or 3:00 o'clock position as follows:

1 Use nitrogen bottle gas to open the VBV door as specified in GEK 112081, 72-00-00, SPECIAL PROCEDURES 007, Subtask 72-00-00-480-002, or disconnect the VBV door to let you open it manually as follows:

a Remove the VBV door (35-150, 72-23-00, as follows:Figure 10)

1) Remove the rod end bearing (bearing) (35-140) and by-pass valve clevis (by-pass clevises) (35-120) assemblies from the door bellcrank (35-20) and VBV door (35-150) as follows:

a) Remove the flat washers (35-180), double hexagon head shear bolts (bolts) (35-170), and 12 point self-locking nuts (nuts) (35-190).

b) Make a trial and do a check if you can slightly open the VBV door (35-150) to insert the borescope probe. If it is possible to insert the borescope probe, continue with step 4.A.(5)(b) 1)f). If it is not1a possible to insert the borescope probe, continue with step 4.A.(5)(b)1

1)c).a

c) Remove the bearing (35-140) and by-pass clevis (35-120) assembly from the VBV door (35-150).

d) Remove the bolt (35-110) and nut (35-100).

e) Remove the bearing (35-140) and by-pass clevis (35-120) assembly from the door and door bellcrank (35-20).

f) Open the VBV door (35-150), insert the BSI probe, and continue with step 4.A.(6).

b If you disconnected the VBV door (35-150) manually, reconnect it once you have completed the BSI of the stationary seal and removed the BSI equipment as follows:

1) Install the bearing (35-140) and by-pass clevis (35-120) assemblies in the door bellcrank (35-20) and VBV door (35-150) as follows:

a) Apply zinc chromate primer (C03-001) to all areas of the flat washers (35-180) and bolts (35-170) that touch aluminum parts.

b) Install a bearing (35-140) and by-pass clevis (35-120) assembly on the door bellcrank (35-20). Attach it with a bolt (35-110) and a nut (35-100). Install the bolt (35-110) from the bottom.

c) Torque the nut (35-100) to 32.2 to 37.8 lb in. (3.63 to 4.27 Nm).

d) Attach the bearing (35-140) and by-pass clevis (35-120) assembly to the VBV door (35-150) with flat washers (35-180), bolts (35-170), and nuts (35-190).

e) Install a flat washer (35-180) on the bolt (35-170) and install the bolt (35-170) in a counterclockwise direction, aft looking forward (ALF), on the VBV door (35-150) and bearing (35-140). Attach it with the flat washer (35-180) and nut (35-190).

c If you performed the procedure specified in GEK 112081, 72-00-00, SPECIAL PROCEDURES 007, Subtask 72-00-00-480-002 to open the VBV door (35-150), use nitrogen bottle gas to retract the actuator to close the VBV door (35-150) that you opened to do the inspection once you completed the BSI of the stationary seal and removed the BSI equipment. If you opened the door by a detachment of the bypass clevis (35-120), then this step is not necessary.

(6) Enter the borescope probe into the pressurization tube until you reach the No. 1 seal port.

(7) Move the borescope probe through the seal passage until you reach the Teflon track.

(8) Do a 360 degrees BSI of the Teflon track circumference and as follows:

(a) The missing Teflon must be not more than a circumferential length of 2.00 inches (50.8 mm) accumulated.

NOTE:Teflon seal total circumferential length is approximately 35.0 inches (889 mm).

(b) No fly-on is permitted if missing Teflon is more than 2.00 inches (50.8 mm) accumulated.

(9) Do a BSI of the forward sump scavenge oil tube and hose (10-165, 72-00-01, oilFigure 4), scavenge tube (15-100, 72-23-00, , and forward sump seal oil tube (05-50,Figure 7) 72-00-01, as follows:Figure 5)

(a) Remove and do a BSI of the forward sump scavenge oil tube and hose (10-165, 72-00-01, and as follows:Figure 4) 1 No fly-on is permitted if the forward sump scavenge oil tube and hose (10-165) is blocked and the blockage cannot be removed.

(b) Do a BSI of the oil scavenge tube (15-100, 72-23-00, Look for blockage inFigure 7).

the line and for Teflon particles in the strut hole and as follows:

CF34-10E Service Bulletins (SBs) SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check Date Printed:

2021/04/29 GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or reproduced without the express written consent of GE. Technical data is considered ITAR and/or EAR controlled; transfer of this data to a Non-US Person, without USG authorization, is strictly prohibited.

Page 11 of 23 1 No fly-on is permitted if the oil scavenge tube (15-100) is blocked and the blockage cannot be removed.

2 No fly-on is permitted if there are particles in the strut hole that cannot be removed.

(c) Do a BSI of the forward sump seal oil tube (05-050, 72-00-01, Look forFigure 5).

blockage in the line or in the seal port forward to the tube entrance and as follows:

1 No fly-on is permitted if the forward sump seal oil tube (05-50) is blocked and the blockage cannot be removed.

2 No fly-on is permitted if Teflon particles are accumulated in the seal port that cannot be removed.

(d) Remove the BSI equipment and reassemble the removed hardware.

(e) Remove and do an inspection of the strainer assembly (05-360, 72-63-00, onFigure 1) the opposite engine according to paragraphs 3.A.(1)(a) through 3.A.(1)(d) of this Service Bulletin and as follows:

1 No fly-on is permitted if any quantity of the Teflon particles is accumulated in the strainer assembly (05-360) of the opposite engine.

(f) Install again the strainer assembly (05-360) on the two engines according to paragraphs

3.A.(1)(e) through 3.A.(1)(g) of this Service Bulletin.

(g) Do an oil system leak check. Refer to GEK 112081-1, 72-00-00, TESTING 003.

Page 12OCROpen in PDF

CF34-10E Service Bulletins (SBS) SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check (01-430) (D++ 10) (01-435) (01-450) NOTE:

ALL IPC REFERENCES FROM 72-00-05 UNLESS SPECIFIED DIFFERENTLY. 6017035-00 Electrical Chip Detector and Forward Sump Scavenge Oil Tube and Hose Location Figure 4 (Sheet 1) PROPRIETARY INFORMATION - Not to be used, disclosed to others Date Printed: reproduced without the express written consent of GE. Technical data Page 2021/04/29 considered ITAR and/or EAR controlled; transfer of this data to a Non-US 12 of 23 Person, without USG authorization, is strictly prohibited.

Pages 13–23 of 23