Copy · GE 90-100 Service Bulletin - 72-0528-R00 · 21 pages

© General Electric Company. Filed by the FAA in regulations.gov docket FAA-2013-0186; AD 2013-17-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '48c461cb61b100101aefa74e91368ae8b67cddcc01d7f7276f55defabc261908'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT Stator Shrouds P/N 1847M52P16

GE PROPRIETARY INFORMATION The information contained in this document is GE proprietary information and is disclosed in confidence. It is the property of GE and shall not be used, disclosed to others or reproduced without the express written consent of GE, including, but without limitation, it is not to be used in the creation, manufacture, development, or derivation of any repairs, modifications, spare parts, designs, or configuration changes or to obtain FAA or any other government or regulatory approval to do so. If consent is given for reproduction in whole or in part, this notice and the notice set forth on each page of this document shall appear in any such reproduction in whole or in part.

This technical data is considered EAR controlled pursuant to 15 CFR Parts 730-774 respectively. Transfer of this data by any means to a Non-US Person, whether in the United States or abroad, without the proper U.S. Government authorization (e.g., License, exemption, NLR, etc.), is strictly prohibited.

Copyright (2012) General Electric Company, U.S.A.

November 15, 2012 GE90-100 S/B 72-0528 PAGE 1 of 21

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT Stator Shrouds P/N 1847M52P16

1. PLANNING INFORMATION A. Effectivity GE90-110B1 and -115B This Service Bulletin is applicable to these GE90-100 engines:

. GE90-100 engines, serial numbers 906-682 through 906-690, 906-701 through 906-704, 906-706 through 906-709, 906-712, 906-713, 906-716 and up.

These serial numbers are the best available data.

This Service Bulletin is also applicable to all GE90-100 engines that had the stage 1 high pressure turbine (HPT) stator shrouds P/N 1847M52P16 installed during a shop visit (post-GE90-100 S/B 72-0363).

B. Description This Service Bulletin provides on-wing borescope inspection (BSI) procedures for the stage 1 HPT stator shrouds P/N 1847M52P16.

C. Compliance Category 2 GE recommends this inspection be performed at a 2,000 cycles since new (CSN) threshold for production engines and 2,000 cycles since installation (CSI) on engines that had the stage 1 HPT stator shrouds P/N 1847M52P16 installed during a shop visit.

GE also recommends this inspection be repeated at 250 cycle intervals thereafter.

NOTE 1: For engines that have accumulated more than 2,000 cycles on the stage 1 HPT stator shroud P/N 1847M52P16 at the time of initial publication of this Service Bulletin, GE recommends the affected engine be inspected within two months of the initial publication date of this Service Bulletin.

NOTE 2: For engines that have less than 2,000 cycles on the stage 1 HPT stator shroud P/N 1847M52P16 at the time of initial publication of this Service Bulletin, GE recommends the affected engine be inspected within two months of reaching 2,000 cycles on the stage 1 HPT stator shrouds.

NOTE 3: Compliance with GE90-100 S/B 72-0348 is a terminating action for this Service Bulletin.

NOTE 4: This Service Bulletin does not supersede GE90-100 S/B 72-0401, and has a different effectivity.

NOTE 5: This Service Bulletin can be accomplished on wing or in shop.

November 15, 2012 GE90-100 S/B 72-0528 PAGE 2 GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or first page.

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT Stator Shrouds P/N 1847M52P16 This Service Bulletin is offered to improve the reliability or performance of your GE product, or to help prevent the occurrence of the event or condition described in this Service Bulletin. If the operator elects not to participate in the bulletin, that decision will be taken into consideration by GE in evaluating future product performance issues that may arise in the operator’s fleet.

D. Concurrent Requirements None.

E. Reason

(1) Objective:

T o improve reliability and reduce signi ficant events.

(2) Condition:

The stage 1 HPT stator shrouds show an accelerated deterioration that can result in an unserviceable condition.

(3) Cause:

The cause for the accelerated distress is currently under investigation.

(4) Inspection:

Inspect the stage 1 HPT stator shrouds for corrosion/oxidation and missing material/holes.

(5) Substantiation:

Substantiation is by fleet experience and analysis.

F. Approval This Service Bulletin contains no modi fication information that revises the approved configuration and therefore does not require FAA approval.

G. Manpower After you get access to the borescope port of the stage 1 HPT stator shrouds, you will need approximately 4 man-hours to do the inspection portion of this Service Bulletin.

H. Weight and Balance Weight and balance are not changed.

November 15, 2012 GE90-100 S/B 72-0528 PAGE 3 GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or first page.

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT Stator Shrouds P/N 1847M52P16 I. References (Use the latest version of these documents) GE90-100 Boeing 777 Aircraft Maintenance Manual (AMM) GEK 110005, GE90-100 Illustrated Parts Catalog (IPC) GE90-100 S/B 72-0348, ENGINE - HPT Stage 2 Nozzle Assembly (72-52-00) - Stage 1 HPT Stator Shroud and Stage 1 HPT Stator Shroud Hanger - New and Rework GE90-100 S/B 72-0363, ENGINE - General (72-00-00) - Spare Parts Release for GE90-100 Engines GE90-100 S/B 72-0401, ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT Stator Shroud J. Publications Affected GE90-100 Boeing 777 Aircraft Maintenance Manual (AMM) K. Interchangeability Not applicable.

L. Software Accomplishment Summary Not applicable.

2. MATERIAL INFORMATION A. Material - Price and Availability

(1) Parts necessary to do this Service Bulletin:

None.

(2) Other Spare Parts:

None.

(3) Consumables:

None.

B. Industry Support Information Contact your Customer Support Manager (CSM).

C. Configuration Chart Not applicable.

November 15, 2012 GE90-100 S/B 72-0528 PAGE 4 GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or first page.

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT Stator Shrouds P/N 1847M52P16 D. Parts Disposition None.

E. Tooling - Price and Availability Tool Number Description -- T orque Wrench capable of up to 220 lb in. (25 N·m) -- Flexible Borescope ( flexscope) 6 mm or 8 mm diameter minimum of 3.5 meters in length (recommended equipment) NOTE:A flexscope shorter than 3.5 meters cannot be used to accomplish this inspection.

3. ACCOMPLISHMENT INSTRUCTIONS A. Stage 1 HPT Stator Shroud BSI with a 3.5-Meter or Longer Flexscope NOTE 1: Video BSI or photos are strongly recommended when this inspection is done.

NOTE 2: Stage 1 HPT stator shroud damage has been seen at all clock positions. Damage occurs more at mid chord and aft on stage 1 HPT stator shroud surface. Inspection of the entire stage 1 HPT stator shroud surface is required. You must look between the blades and under the blade tips to make sure that no indications are missed.

WARNING: USE THERMAL GLOVES WHEN YOU MOVE OR TOUCH HOT OR COLD PARTS. HOT OR COLD PARTS CAN CAUSE INJURY .

CAUTION: MAKE SURE THE TEMPERATURE OF THE ENGINE AND THE ADJACENT AREAS NEAR THE BSI PORTS ARE LESS THAN 150 F (66 C) DEGREES. DO NOT DO A BSI IF THE ADJACENT AREAS ARE TOO HOT TO TOUCH. DO THE BSI WHEN THE ENGINE TEMPERATURE IS LESS THAN 150 F (66 C) DEGREES. THIS WILL PREVENT DAMAGE TO THE BORESCOPE EQUIPMENT .

(1) Do a 360-degree BSI of the stage 1 HPT stator shroud (1, Figure 1) leading edge (LE) and mid chord. Refer to the GE90-100 Boeing 777 AMM, TASK 72-00-00-290-805-H01, SUBTASK 72-00-00-290-007-H01, and do as follows:

NOTE 3:A flexscope less than 3.5 meters in length cannot be used to do the BSI of the stage 1 HPT stator shrouds.

(a) Remove the borescope plug at the "Q" location.

(b) Insert a flexscope into the borescope port of the combustor diffuser nozzle (CDN) and pass it into the flow path.

November 15, 2012 GE90-100 S/B 72-0528 PAGE 5 GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or first page.

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT Stator Shrouds P/N 1847M52P16

(c) Follow the direction of the stage 1 HPT nozzle and continue to insert the flexscope over the top of the engine. Continue to feed the flexscope into the flow path until you can see the flexscope insertion point ( flexscope entering through the borescope port).

NOTE: It is very important that you can see the borescope entry point to make sure that a full 360 degrees flexscope travel has been accomplished for the inspection.

(d) Carefully remove the flexscope. Make sure to examine the stage 1 HPT stator shrouds as you remove the flexscope. Inspect the mid chord of the stage 1 HPT stator shrouds (area of the stage 1 HPT stator shrouds between the blades) and the LE of the stage 1 HPT stator shrouds.

(e) While you examine the stage 1 HPT stator shrouds, evaluate each stage 1 HPT stator shroud as speci fied in paragraph 3.B., I nspection Results Evaluation, and complete the Inspection Findings Report Form as specified in paragraph 3.C., I nspection Findings Reporting, and Figure 3.

(f) When you complete the inspection, install the borescope plug. Refer to the GE90-100 Boeing 777 AMM, SUBTASK 72-00-00-410-011-H01.

(2) Do a 360-degree BSI of the stage 1 HPT stator shroud (1, Figure 1) trailing edge (TE) and mid chord as follows:

NOTE:A flexscope less than 3.5 meters in length cannot be used to do the BSI of the stage 1 HPT stator shrouds.

(a) Remove the borescope plug at the "R" location.

(b) Insert a flexscope into the borescope port of the HPT case and pass it into the flow path.

(c) Follow the direction of the stage 2 HPT nozzle and continue to insert the flexscope under the bottom of the engine. Continue to feed the flexscope into the flow path until you can see the flexscope insertion point (flexscope entering through the borescope port).

NOTE: It is very important that you can see the borescope entry point to make sure that a full 360 degrees flexscope travel has been accomplished for the inspection.

(d) Carefully remove the flexscope. Make sure to examine the stage 1 HPT stator shrouds as you remove the flexscope. Inspect the mid chord of the stage 1 HPT stator shrouds (area of the stage 1 HPT stator shrouds between the blades) and the TE of the stage 1 HPT stator shrouds.

(e) While you examine the stage 1 HPT stator shrouds, evaluate each stage 1 HPT stator shroud as speci fied in paragraph 3.B., I nspection Results Evaluation, and complete the Inspection Findings Report Form as specified in paragraph 3.C., I nspection Findings Reporting, and Figure 4.

November 15, 2012 GE90-100 S/B 72-0528 PAGE 6 GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or first page.

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT Stator Shrouds P/N 1847M52P16

(f) When you complete the inspection, install the borescope plug. Refer to the GE90-100 Boeing 777 AMM, SUBTASK 72-00-00-410-014-H01.

B. Inspection Results Evaluation

(1) Use the shroud serviceability limits published in the GE90-100 Boeing 777 AMM, TASK 72-00-00-290-805-H01, SUBTASK 72-00-00-290-007-H01, except for the following:

NOTE: Refer to Figure 2 for examples of the stage 1 HPT stator shrouds thermal distress.

(a) Holes within 0.35 inch (8.9 mm) of the LE are serviceable on a reduced inspection interval of every 50 cycles.

(b) Holes beyond 0.35 inch (8.9 mm) of the LE less than 0.15 inch (3.8 mm) in diameter [maximum area of 0.018 sq in. (0.12 sq cm)] are serviceable on a reduced inspection interval of every 25 cycles if the LE of the shroud is present forward of the hole.

NOTE: If you can see the stage 1 hanger internal baf fle, the damage is more than 0.35 inch (8.9 mm) from the LE and must be evaluated in accordance with the serviceability requirements listed above in this Service Bulletin.

(c) Holes beyond 0.35 inch (8.9 mm) of the LE between 0.15 inch (3.8 mm) in diameter [maximum area of 0.018 sq in. (0.12 sq cm)] and 0.25 inch

(6.4 mm) in diameter [maximum area of 0.049 sq in. (0.32 sq cm)] are serviceable on a reduced inspection interval of every 10 cycles if the LE of the shroud is present forward of the hole.

NOTE: If you can see the stage 1 hanger internal baf fle, the damage is more than 0.35 inch (8.9 mm) from the LE and must be evaluated in accordance with the serviceability requirements listed above in this Service Bulletin.

(d) Lifting of the shroud split line, LE or TE is acceptable if the area of the lifting material meets the requirements in the GE90-100 Boeing 777 AMM, SUBTASK 72-00-00-290-007-H01 for missing material.

(e) Black oxide/corrosion build up ar ound the shroud cooling holes on shroud flow path surface is acceptable for repeat inspection interval of every 250 cycles.

(f) Black oxide/corrosion build up on shroud surface that blocks cooling holes is acceptable for repeat inspection interval of every 100 cycles.

C. Inspection Findings Reporting

(1) Report the inspection findings to GE Group Field Service/PSE Representative.

Fill out the Inspection Findings Report Form. Refer to Figure 3 and Figure 4.

November 15, 2012 GE90-100 S/B 72-0528 PAGE 7 GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or first page.

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT Stator Shrouds P/N 1847M52P16

(2) Video borescope/photograph the inspection of the stage 1 HPT stator shrouds. Retain the inspection records for one year (12 months).

(3) Send the completed Inspection Findings Report Form and pictures to:

kyle.blomgren@ge.com November 15, 2012 GE90-100 S/B 72-0528 PAGE 8 GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or first page.

Page 9OCROpen in PDF

GE (O • -100 SERIES GE Aircraft Engines

SERVICE BULLETIN ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT Stator Shrouds P/N 1847M52P16 FWD A-A 1 (REF) LEGEND:

1. STAGE 1 HPT STATOR SHROUD (QTY-40) 1368214-00 Location of the Stage 1 HPT Stator Shroud Figure 1, ( Sheet 1 of 3 ) November 15, 2012 GE90-100 S/B 72-0528 PAGE 9 GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

Page 10OCROpen in PDF

GE O • -100 SERIES GE Aircraft Engines

SERVICE BULLETIN ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT Stator Shrouds P/N 1847M52P16 TE STAGE 1 HPT • STAGE 1 HPT STATOR

NOZZLE SHROUD HANGER LE STAGE 2 HPT NOZZLE 1 (REF) STAGE 1 HPT ROTOR

BLADE TIP TE 1368219-00 Location of the Stage 1 HPT Stator Shroud Figure 1, ( Sheet 2) November 15, 2012 GE90-100 S/B 72-0528 PAGE 10 GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

Page 11OCROpen in PDF

GEN ) - 100 SERIES GE Aircraft Engines

SERVICE BULLETIN ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT Stator Shrouds P/N 1847M52P16

DISTANCE FROM SHROUD

LE TO FORWARD

SIDE OF SHROUD RAIL

0.200 LE 0.350

(5.08) (8.89) STAGE 1 SHROUD

APPROXIMATED

DIMENSIONS TO

COOLING HOLE ROWS

0.200 TE LE

(5.08) NOTES:

1. BLACK DOTS ARE THE AIR FLOW EXIT HOLES OF THE STAGE 1 HPT STATOR SHROUD.

2. DIMENSIONS FOR HOLE COOLING HOLE LOCATIONS ARE FOR THE STAGE 1 HPT STATOR SHROUD P/N 1847M52P16.

3. DIMENSIONS ARE IN INCHES WITH MILLIMETERS IN PARENTHESES.

4. DIMENSIONS ARE APPROXIMATE AND TO BE USED FOR REFERENCE ONLY. 1368220-00 Location of the Stage 1 HPT Stator Shroud Figure 1, ( Sheet 3) November 15, 2012 GE90-100 S/B 72-0528 PAGE 11 GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

Page 12OCROpen in PDF

GE ( • - 100 SERIES GE Aircraft Engines

SERVICE BULLETIN ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT Stator Shrouds P/N 1847M52P16

APPROXIMATE DISTANCE BETWEEN COOLING HOLE ROWS 0.300 (7.62)

APPROXIMATE DISTANCE BETWEEN COOLING HOLE ROWS 0.200 (5.08)

BLOCKED COOLING HOLES SERVICEABLE ON A 100 CYCLE

RE-INSPECTION LE HPT STAGE 1 ROTOR BLADE

NO BLOCKED COOLING HOLES REFER TO SERVICEABLE ON A 250 CYCLE TE STAGE 1 HPT NOZZLE NOTE 3 RE-INSPECTION LE STAGE 1 HPT OUTER PLATFORM

STATOR SHROUD

MATERIAL BUILD-UP IS A

SERVICEABLE CONDITION

1. THE DISTANCE FROM THE LE OF THE STAGE 1 HPT STATOR SHROUD TO THE LE OF THE STAGE 1 HPT ROTOR BLADE IS APPROXIMATELY 0.35 (8.9).

THIS CAN BE USED AS A REFERENCE TO

DETERMINE THE APPROXIMATE LOCATION OF ANY MISSING MATERIAL.

2. INSPECT BETWEEN THE STAGE 1 HPT ROTOR BLADE AIRFOILS.

3. OXIDE/CORROSION BUILD UP IS BLACK OR SILVER

MATERIAL ON SHROUD FLOW PATH

4. DIMENSIONS ARE IN INCHES WITH MILLIMETERS IN PARENTHESES. 1368221-00 Stage 1 HPT Stator Shrouds - Thermal Distress Figure 2, ( Sheet 1 of 8) November 15, 2012 GE90-100 S/B 72-0528 PAGE 12 GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

Pages 13–21 of 21