TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '6f6fa254bf816ddd5a45bbb7a0d32c7381bdd381a14161a5ff4dbfb5080562c9' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '6f6fa254bf816ddd5a45bbb7a0d32c7381bdd381a14161a5ff4dbfb5080562c9' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SERVICE BULLETIN
SUBJECT
NUMBER 280-53-287
FUSELAGE (ATA 53) – FUSELAGE – FORWARD
FUEL TANK PROBE CLEARANCE
VERIFICATION
RECORD ONLY SEPTEMBER 26, 2019
Gulfstream.............................................
SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 1 of 15
FUSELAGE - FORWARD FUEL TANK PROBE CLEARANCE VERIFICATION
PLANNING INFORMATION 202
1. Effectivity Aircraft serial numbers 2001 through 2184
2. Concurrent Requirement None
3. Reason During check of the forward fuel tank it has been found that the distance between the probe to the forward fuel tank structure doesn’t meet the minimum 8.0 mm (0.31 inch) requirements (probe No. 1 to the lower skin and probe No. 3 to the upper skin and angle P/N 30P371126800-501).
4. Description This service bulletin provides instruction to access to the forward probe No. 1 and aft probe No. 3 fuel probes in the forward fuel tank in order to measure each probe’s distance to the adjacent skin, and if the minimum 8.0 mm (0.31 inch) distance requirement is not met, implementation of this service bulletin’s rework instructions are required.
5. Compliance Compliance with this service bulletin is mandatory no later than November 30, 2022.
6. Approval This service bulletin has been reviewed by the Civil Aviation Administration of Israel (CAAI). The design content herein complies with the applicable Civil Aviation Regulations and is CAAI-approved.
7. Manpower The following information is for planning purposes only:
Estimated man-hours: 20
8. Weight and Balance None September 26, 2019
Gulfstream.............................................
SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 2 of 15
9. Electrical Load Data No Change
10. Software Accomplishment Summary None
11. References G280 Aircraft Maintenance Manual (AMM), chapters 12, 20 and 28.
Gulfstream Aerospace LP G280 TC design change MOD G25-10077 Doc. 30P045/060794, table 3-1 and table 8-2 Doc. 30P650/071366 para 5.2.6 NOTE: This Service Bulletin incorporates design data approved under G280 TC design change MOD G25-10077 for installation on the standard type certificated aircraft. Approval for any deviation from the instructions contained in this service bulletin should be obtained, if required, from the local regulatory authority in accordance with the local relevant regulations.
12. Other Publications Affected G280 AMM G280 IPC NOTE: Data concerning this service bulletin will be published in a future revision of the affected manual(s). This service bulletin will provide technical data until the revisions are published.
13. Interchangeability or In termixability of Parts None September 26, 2019
Gulfstream.............................................
SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 3 of 15
MATERIAL INFORMATION
1. Material - Availability The parts required to accomplish this service bulletin are available by contacting Spare Parts Sales at 800-810-GULF (4853) or 912-965-4178.
2. Warranty Information - Structure Labor and materials will be at no charge for this service bulletin if the aircraft is still within the related warranty period as of the original issue date of this service bulletin and work is accomplished within the recommended compliance time, as stated in this document, at a Gulfstream Authorized Warranty Facility or Factory Authorized Service Center with related aircraft model certification. * *Coverage is granted per the terms and conditions of the Gulfstream Aircraft Sales Agreement to the original purchaser or subsequent owner with appropriate Assignment of Warranties on file with Gulfstream.
NOTE: Additional labor hours incurred due to aircraft configuration or mechanical difficulties must be charged as a separate discrepancy and submitted for warranty consideration.
3. Material Necessary for Each Aircraft A. Material to be Procured:
New P/N Keyword Old P/N Qty 30P371100008-501A01-505 Sensor bracket assembly -1 30P371100008-501A01-507 Sensor bracket assembly -1 30P371100008-501A01-509 Sensor bracket assembly -1 NAS1802-3-10 Screw, hex head, cruciform recess, non-lock -3 NAS1149C0332R Washer, flat, plain, #10 size, 0.032 inch -A / R NAS6703U3 Bolt, t ension, hex head - 3 NAS1149C0363R Washer, flat, plain, #10 size, 0.063 inch -A / R September 26, 2019
Gulfstream.............................................
SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 4 of 15 B. Materials Supplied by the Operator:
PR1750 sealant or equivalent
4. Reidentified Parts None
5. Special Tooling Fuel Quantity Test Set, GSE 2800142 or equivalent Fuel Quantity Measurement System (FQMS), GSE 2820595 or equivalent NAS1802-3-16 Screw, hex head, cruciform recess, non-lock -1 NAS1149C0316R Washer, flat, plain, #10 size, 0.016 inch -A / R New P/N Keyword Old P/N Qty September 26, 2019
Gulfstream.............................................
SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 5 of 15
ACCOMPLISHMENT INSTRUCTIONS CAUTION: PROTECT WIRE BUNDLE S, CONNECTORS AND SURROUNDING
STRUCTURE DURING ANY MAINTENANCE PROCEDURES FROM SHAVINGS, DEBRIS AND CONTAMINATION. MAINTAIN A PROPERLY
CLEANED WORK AREA THROUGHOUT THE PROCEDURE TO ENSURE THE INTEGRITY OF THE AFFECTED COMPONENT/SYSTEM. VISUALLY
INSPECT WORK AREA USING ADDITIONAL LIGHT AS NECESSARY TO
VERIFY ABSENCE OF ANY DEBRIS PRIOR TO COMPLETION OF PROCEDURE. FAILURE TO COMPLY MAY RESULT IN DAMAGE TO COMPONENTS AND/OR SYSTEMS.
1. Prepare aircraft for safe maintenance. Re fer to Aircraft Maintenance Manual (AMM), Chapter 20.
CAUTION: MAKE SURE ELECTRICAL POWER IS DISCONNECTED FROM AIRCRAFT.
FAILURE TO COMPLY MAY RESULT IN INJURY TO PERSONNEL AND/OR DAMAGE TO AIRCRAFT.
2. Disconnect external electrical power from aircraft. Refer to AMM, Chapter 20.
3. Defuel forward tank if required and drain fo rward fuel tank. Refer to AMM, Chapter 12.
4. Open forward fuel tank access panels 123BR, 123ER, 123FR and 152DR to access fuel probes No. 1 and No. 3. Refer to Figure 1.
5. Measure the gaps between the probes No. 1 and No. 3 and fuel structure (upper skin, lower skin and stringers).
A. If all gaps measured are equal to or greater than 8.0 mm (0.31 inch), proceed to step 9.
B. If any gaps measured are less than 8.0 mm (0.31 inch), proceed to the next step for that gap.
6. Remove forward fuel tank probes No. 1 and No. 3 as required. Refer to AMM, Chapter 28 and Figure 2.
7. Install forward fuel tank probe No. 3 as follows:
NOTE: For screw, nut and bolt Installation refer to AMM, Chapter 20.
A. Install sensor bracket assembly, P/N 30P37110008-501A01-509 (1) using flat washer, P/N NAS1149C0332R (2) and bolt, P/N NAS6703U3 (3).
Refer to Figure 3.
September 26, 2019
Gulfstream.............................................
SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 6 of 15 B. Install upper part of probe No. 3, P/N 30P884200200-001 on sensor bracket assembly as follows:
(1) Install screw, P/N NAS1802-3-16 (4) with flat washer, P/N NAS1149C0332R
(5) and adjust the gap between the probe and the fuel tank upper skin to be between 8.0 - 9.0 mm (0.31 - 0.35 inch) using washers, P/N NAS1149C0332R (6), P/N NAS1149C0363R (7) and P/N NAS1149C0316R (8) as required.
(2) Reinstall lower part of probe No. 3, P/N 30P884200200-001 to its original position using screw, P/N NAS1802-3-10 (9), and flat washer, P/N NAS1149C0332R (10).
(3) Adjust the forward probe to attain 8.0 - 9.0 mm (0.31 - 0.35 inch) distance from inner surface of the fuel tank upper skin and stiffener, P/N 30P371126800-501.
(4) Ensure gap between probe and lower skin is equal to or greater than 8.0 mm (0.31 inch).
C. Record the measured gaps fr om steps 7.B.(1) and 7.B.(3).
8. Install forward fuel tank probe No. 1 as follows:
A. Install sensor bracket assembly , P/N 30P371100008-501A01-505 (11) and P/N 30P371100008-501A01-507 (7) as follows (Refer to Figure 4):
(1) Install bolts, P/N NAS6703U3 (13), with flat washers P/N NAS1149C0332R
(14) and screw, P/N NAS1802-3-10 (15) with flat washer, P/N NAS1149C0332R (16).
(2) Install sensor bracket a ssembly, P/N 30P371100008-501A01-507 (7).
B. Reinstall probe No. 1, P/N 30P884200000-001 in place using bolt, P/N NAS6703U3 (17) with washer, P/N NAS1149C0332R (18), and screw P/N NAS1802-3-10 (19) with washer, P/N NAS1149C0332R (20).
C. Ensure gap between the af t probe and the fuel tank upper and lower skins is equal to or greater than 8.0 mm (0.31 inch).
D. Record the measured gaps from step 8.C.
9. Install all fuel tank access panels removed in Step 4. for forward fuel tank probes removal.
September 26, 2019
Gulfstream.............................................
SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 7 of 15
10. Perform Fuel Quantity Measurement S ystem – Capacitance / Resistance Check Adjustment / Test for the Forward Fuel Tank Probes as follows:
CAUTION: DAMAGE TO SENSITIVE COMPONENTS MAY OCCUR IF ELECTROSTATIC DISCHARGE SAFETY PRECAUTIONS ARE NOT OBSERVED.
Tank Unit (Fuel Probes) Capacitor Checks A. Select the POWER ON / OFF switch to the ON position.
B. Verify there is no in dication of a low battery in the display window.
C. Wait 3 minutes befor e staring the test.
D. Select the FUNCTION SELECT kn ob to the MEASURE EXT Position.
E. Select the MEGGAR SELECT knob to the TU position.
F. Connect a ground cable from the CHASSIS c onnector of the fuel quantity test set to aircraft ground.
G. Connect test harness connector to forward tank connector 84YP.
H. Connect the interface test harness connector J9 to the fuel quantity test set to TANKS UNITS LO-Z connector.
I. Connect the interface test harness connector J7 to the fuel quantity test set to TANKS UNITS HI-Z connector.
J. Verify all the switches on the interface box are selected to the GROUND position.
NOTE: In order to check each probe value, only select the applicable tank unit (fuel probe) to TEST position. After reading capacitance value, return the switch to the GROUND position.
K. Select applicable interfac e box switch (SW-1, SW-2 or SW-3) to the TEST position to check each tank unit (fuel probe) capacitance value. After reading each capacitance value, return the switch to the GROUND position.
September 26, 2019
Gulfstream
SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 8 of 15 L. Verify the measured tank units (fuel probes) capacit ance values are with the specified ranges per the following table:
Forward Tank Wiring Checkout NOTE: Reading of 0 ohm indicates a short circuit.
An indication of “-Or.-” while reading the SHIELD positions is an acceptable reading as this reading is infinitely higher than what can be read on the display for any SHIELD position and meets the requirement.
M. On the fuel quantity test set FREQUENCY SELECT knob, select MΩ.
N. On the interface box, select SW-1, SW-2 and SW-3 to the MEGGAR position.
O. Select SW-1 to the TEST position.
P. Verify measured values are as specified in Table 2.
Q. Select SW-1 back to the MEGGAR position.
R. Select SW-2 to the TEST position.
S. Verify measured values ar e as specified in Table 2.
T. Select SW-2 back to the MEGGAR position.
U. Select SW-3 to the TEST position.
V. Verify measured values are as specified in Table 2.
W. Select SW-3 back to the MEGGAR position.
Table 1:
FORWARD TANK UNITS (FUEL PROBES) CAPACITANCE VALUES Tank Unit (Probe) Switch M inimum (pF) Maximum (pF) 1Q 2 149.30 165.10 2Q 1 113.00 125.10 3Q 3 76.10 84.20 September 26, 2019
Gulfstream.............................................
SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 9 of 15 X. For each of the fuel t ank harnesses, the following MEGGAR SELECT switch positions are to be checked to verify that forward fuel probes insulation resistance are within the required values:
11. After rework completion perfo rm leakage test as follows:
A. Refuel the forward tank per AMM, Chapter 12 and verify that the maximum fuel quantity reading of the forward tank is within the required range (refer to the relevant row in table below according to the fuel type and temperature)
12. Check for fuel leaks ar ound work area and access panel(s) per the following requirements:
(a) If fuel leak is detected, repair source of fuel leak.
Table 2:
TEST POSITION MINIMUM VALUE (M Ω) LO-Z/HI-Z 0.43 - 2.25 LO-Z/SHIELD 100 HI-Z/SHIELD 100 SHIELD/GND 100 LO-Z/GND 100 HI-Z/GND 100 Table 3: Fuel Quantity for FWD Fuel Tank Fuel Tank Fuel Type Fuel Temperature [°C] Minimum Fuel Quantity (LBs) Maximum Fuel Quantity (LBs) Fuel Quantity results (LBs)
FWD TANK Brayco 0 – 9 1450 1600 JET A 0 – 9 1390 1550 Brayco 10 – 30 1350 1560 JET A 10 – 30 1370 1510 Brayco 31 – 40 1310 1520 JET A 31 – 40 1350 1470 September 26, 2019
Gulfstream
SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 10 of 15
(b) Use lint free cloth to clean all spil led fuel on aircraft and / or floor.
(c) Use compressed air to dry hard to reach areas.
13. Ensure work area is clean a nd clear of foreign objects (FOD).
14. Record compliance with this service bulleti n in the aircraft’s permanent maintenance records and return aircraft to flight status.
15. Report compliance with this service bu lleting to Gulfstream Computerized Maintenance Program (CMP) by uploading the attached service reply card, along with the CMP task card(s) sign-off using MyGulfstream, MyCMP Document Upload or e-mail to cmp.docproc@campsystems.com.
If technical assistance is required, contact your area Gulfstream Field Service Representative or call Gulfstream Customer Support at 800-810-GULF (4853).
September 26, 2019
Gulfstream.............................................
SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 11 of 15 Access Panel Location Figure 1 September 26, 2019