Copy · U.S. DOT/FAA - Agusta BT 119-22 · 20 pages

© Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2008-0327, the docket of AD 2008-14-05. Not covered by OpenAirDocs’ CC0 dedication.

TextOCR

This text is OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '0d2bd89d166610faeee00e1d989f1b6ed68fe2e2e0ee0f6c4874910097e5d939'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

Via Giovanni Agusta, 520 AGUSTA Tel.: +39 0331-229111 - Fax: +39 0331-229605/222595 21017 Cascina Costa di Samarate (VA) Italy

AN AGUSTAWESTLAND COMPANY

TRANSLATION OF BOLLETTINO TECNICO N 119-22 The technical content of this document is approved DATE July 11, 2007 under the authority of DOA nr EASA.21J.005.

REV.

Compliance with MANDATORY this bollettino is:

SUBJECT:INSPECTION AND REPLACEMENT OF THE HYDRAULIC LINES P/N 109-0761-64-103 AND 109-0761-65-103 BY MEANS OF THE KIT P/N 109-0824-03-101 APPLICATION REASON: Avoid the possible interference between the hydraulic lines P/N 109- 0761-64-103 and 109-0761-65-103, of the No° 1 hydraulic system, and tail rotor control rod assy P/N 109-0032-01-41.

HELICOPTERS AFFECTED:

All the Agusta A119 helicopters up to S/N 14028 included.

COMPLIANCE:

PARTI Within the next 50 (fifty) flight hours and successively periodically repeat the inspection each 100 (one hundred) flight hours up to the compliance of PART I^ PART I^ Within and not later than July 31, 2008.

DESCRIPTION:

Cases of interference between hydraulic line P/N 109-0761-65-103 and the tall rotor control rod assy have been reported on some A109 series helicopters.

The interference during the normal flight operations can produce wear of hydraulic lines with the subsequent loss of hydraulic fluid.

The A119 helicopters are potentially subject to the same type of malfunction because constructively and functionally similar in subject area.

An appropriate entry should be made in the aircraft log book upon accomplishment.

If ownership of aircraft has changed, please, forward to new owner.

Page 1 of 17

Page 2OCROpen in PDF

B.T. 119-22 To avoid the above, two new hydraulic lines P/N 109-0763-96-101 and P/N 109-0763-97-101 have been produced, that coupled with a new mounting method, allow an increase in clearance between lines and tail rotor control rod assy.

This Bollettino is issued in order to provide:

- Inspection requirements (PART I^), for interference, until the compliance of the PART II^ of this Bollettino;

- the necessary instructions for the Kit P/N 109-0824-03-101 installation (PARTI).

REQUIRED MANPOWER:

The following estimated manpower hours are required for compliance with this Bollettino:

PART 1^: 2 (two).

PART I|^: 16 (sixteen).

WARRANTY:

The parts required to apply the present Bollettino shall be supplied on a free of charge basis by Agusta upon request, except for the consumable Upon application of this Bollettino, Customers are requested to submit to Agusta Warranty Administration the Technical Bulletin Compliance form attached to this Bollettino duly completed in all its parts.

REQUIRED MATERIALS:

The following materials are required for compliance with this Bollettino:

PART I^:

N.A.

PART I^:

PART NUMBER DENOMINATION Q.TY 109-0824-03-101 Hydraulic line tail rotor servo actuator retrofit kit 109-0763-96-101 Hydraulic line assy 109-0763-97-101 Hydraulic line assy AN3-22A Bolt . 1 MS21042L3 Self-locking nut .. 1 AS21919WDG04 Clamp AS21919WDG05 Clamp . 1 NAS1149D0332K Washer . 1 NAS43DD3-36N Spacer .2 NAS43DD3-35N Spacer . 1 AN743Z13 Bracket .2 AS5406D04 Fitting 999-8001-64-1 Sleeve 300 mm NAS1738B4-2 Rivet or:

CR3213-4-2 Rivet Page 2 of 17

Page 3OCROpen in PDF

B.T. 119-22 In addition the following consumable materials are necessary SPECIFICATION DENOMINATION Q.TY TT-N-95 Aliphatic naphtha A.R.

or:

PD-680 Type I| Cleaning solvent A.R.

MIL-P-23377 Epoxy polyamide primer A.R.

(cod. 900004523) MS20995C32E Lockwire A.R.

SPECIAL TOOLS:

N.A.

WEIGHT AND BALANCE CHANGES:

Negligible.

REFERENCES:

A119 Maintenance Manual.

A119 Rotorcraft Flight Manual.

PUBLICATIONS AFFECTED:

A119 Illustrated Parts Catalog.

COMPLIANCE INSTRUCTIONS:

GENERAL NOTES > Unless otherwise specified retain all parts that will be removed. Replace damaged hardware.

> Place an identification tag on all components that are re-usable, including the attaching hardware that have been removed to gain access to the modification area and adequately protect them until their later re-use.

• Exercise extreme care during drilling operations to prevent cables or hosing damage.

> All dimensions are in mm.

Page 3 of 17

Page 4OCROpen in PDF

B.T. 119-22 > After the completion of structural work, remove all shaving and sharp edges. If necessary re-apply protective treatment.

• Clean the areas that may have been contaminated by hydraulic fluid or engine oil using aliphatic naphtha.

PARTI

1. Prepare the helicopter on ground for a safe maintenance, disconnect any power supply.

N Remove the main transmission upper forward fairing.

Gain access to inside box beam through lightening hole. Using a mirror and a suitable light source, inspect the possible interference area between the hydraulic lines and the tail rotor control rod assy P/N 109-0032-01-41 (ref. figure 1).

CAUTION During the visual inspection move several times the pedals completely back and forth in order to single out the least clearance point or the possible presence of e interference.

NOTE In case the displacing/removal of the sealant seep protections is required, after the inspection restore the protections.

4. In case there is no interference between the hydraulic lines and the tail rotor control rod assy, proceed as follows:

4.1. Reinstall the main transmission upper forward fairing.

4.2. Return the helicopter to a ready to flight condition.

4.3. Record compliance with this PART of the Bollettino in the helicopter log book.

4.4. Repeat this PART (within the next 100 hours and subsequently every 100 hours) until the compliance with PART II of this Bollettino.

Page 4 of 17

Page 5OCROpen in PDF

B.T. 119-22 In case interference between the hydraulic lines and the tail rotor control rod assy is reported, perform the PART II.

PART I^

1. Prepare the helicopter on ground for a safe maintenance, disconnect any power supply.

2. Remove the upper forward fairing, open the left engine oil fan compartment access doors.

3. Disconnect the forward rod end of the droop compensator control system linear actuator in accordance with instructions provided in the A119 Maintenance Manual (ref. figure 2).

3.1. Rotate Droop stop aft and secure.

Remove hydraulic lines P/N 109-0761-64-103 and 109-0761- 65-103 as follows:

4.1. Remove mounting hardware of hydraulic lines P/N 109-0761- 64-103 and 109-0761-65-103 from the helicopter roof (ref.

figure 1).

4.2. If installed, displace/remove the sealant seep deck protections.

4.3. Remove the inspection panel P/N 109-0322-10-41, located on LH box beam; retain hardware for later reuse.

4.4. In order to facilitate hydraulic lines removal, remove the bracket P/N 109-0761-25-5 mounting hardware, retain the hardware for later reuse (ref figure 3).

4.5. Disconnect hydraulic lines P/N 109-0761-64-103 and 109-0761- 65-103 from the relevant mount and withdraw them from the helicopter box beam.

NOTE 1 Follow the HYDRAULIC POWER SYSTEMS MAINTENANCE PRECAUTIONS related to the hydraulic systems, reported in the A119 Maintenance Manual, chapter 29 NOTE 2 Adequately recover the drained oil from the hydraulic lines.

Page 5 of 17

Page 6OCROpen in PDF

B.T. 119-22 NOTA 3 Plug all the disconnected hydraulic lines to avoid oil spillage and contaminations.

Remove clamps that fix together the removed hydraulic lines and retain hardware for later reuse.

In case during the inspection (PART I^) interference between hydraulic lines and the tail rotor control rod assy has been reported, or damage of the hydraulic lines in the area of possible interference with the tail rotor control rod assy have been reported, perform the following procedure (from step 5.1.

to step 5.19.).

5.1. Remove the left access door P/N 109-0322-10-13 and open the left upper servicing platform D9 (ref. A119 Maintenance Manual chapter 6).

5.2. Remove line P/N 109-0680-14-101 from the solenoid valve P/N 109-0711-09-103 in accordance with A119 Maintenance Manual (ref. figures 4 and 5).

5.3. Remove clamp P/N AS21919WDG32 or MS21919WDG32 (whichever is installed) as shown in figure 5.

5.4. Remove clamps located on the ducts P/N 6050501245 or NAS1375A08SM196 (whichever is installed) and shown in figure 5, move the connecting hose P/N 109-0680-11-101 to gain access to the junction area.

5.5. Remove line P/N 109-0680-14-101, note the locking system in order to reproduce it during the installation phase (ref. figure 5).

CAUTION During removal, pay particular attention to not damage the ring P/N NAS595.

5.6. In order to facilitate the tail rotor control rod removal, it is allowed to remove the exhaust duct of the engine oil cooler fan P/N 109-0620-90-101.

5.7. Disconnect rod assy P/N 109-0032-08 or P/N 109-0040-55 (whichever is installed) from the bellcrank P/N 109-0040-35 in accordance with A119 Maintenance Manual (ref. figure 6).

5.8. Disconnect tail rotor control rod assy P/N 109-0032-01-41 in accordance with A119 Maintenance Manual.

Page 6 of 17

Page 7OCROpen in PDF

B.T. 119-22

CAUTION Do not change the tail rotor control rod assy length during reinstallation.

5.9. In order to avoid tail rotor control rod assy damage, adequately protect the engine bay support rib lightening hole.

5.10. Withdraw tail rotor control rod assy through the door P/N 109- 0322-10-41 hole.

NOTE It is allowed to reuse the removed control rod when, after the inspection as per the A119 Maintenance Manual, only when within the limits provided in the Manual.

Be sure not to change the tail rotor control rod assy length during the repair procedure.

5.11. If a damaged tail rotor control rod assy is found annotate the total length and replace it with a new rod assy in accordance with A119 Maintenance Manual.

5.12. Place tail rotor control rod assy in its position through door P/N 109-0322-10-41 hole.

5.13. Install tail rotor control rod assy P/N 109-0032-01-41 in accordance with A119 Maintenance Manual.

CAUTION If the tail rotor control rod assy length is unchanged, adjustment of flight controls is not required.

5.14. Install rod assy P/N 109-0032-08 or P/N 109-0040-55 (whichever is removed) to bellcrank P/N 109-0040-35 in accordance with A119 Maintenance Manual (ref. figure 6).

5.15. Reconnect pipe P/N 109-0680-14-101 and relevant ring, and lock as previously noted (ref. figure 5).

5.16. Insert ducts P/N 6050501245 or NAS1375A08SM196 (whichever is installed) on hose P/N 109-0680-11-101 and tighten the metallic clamps (ref. figure 5).

5.17. Install pipe P/N 109-0680-14-101 at the solenoid valve P/N 109- 0711-09-103 in accordance with A119 Maintenance Manual (ref figures 4 and 5).

Page 7 of 17

Page 8OCROpen in PDF

B.T. 119-22

5.18. If removed, install exhaust duct of the engine oil cooler fan P/N 109-0620-90-101.

5.19. Install the previously removed left access door P/N 109-0322- 10-13, close the left upper servicing platform D9 (ref. A119 Maintenance Manual chapter 6).

6. Assemble together the brackets P/N AN743Z13 (as shown in figure 7) using:

a) Clamps P/N AS21919WDG04, AS21919WDG05;

b) Bolt P/N AN3-22A, washers P/N NAS1149D0332K;

c) N° 2 spacers P/N NAS43DD3-36N, and n°1 spacer P/N NAS43DD3-35N;

d) Nut P/N MS21042L3.

In accordance with figure 7, using the fixing assy made at step 6, countermark and drill • 3,6 - 3,8 mm the beam and the brackets.

Remove fixing assy made at step 6 and then remove the bracket mount.

9. Clean area from contaminates and debris and restore the protective treatment using epoxy polyamide primer.

NOTE Pay particular attention to avoid that the shavings fall in box beam.

10. Install brackets P/N AN743Z13, using n° 4 rivets P/N NAS1738B4-2 as shown in figure 7.

11. Install new hydraulic lines in accordance with the following procedure:

11.1. Install, as shown in figure 3, between hydraulic lines P/N 109- 0763-96-101 and P/N 109-0763-97-101 clamps removed from lines P/N 109-0761-64-103 and 109-0761-65-103 using the relevant hardware.

11.2. pipe P/N 109-0763-97-101, install sleeve P/N 999-8001-64-1, between clamp and fitting as shown in figure 3.

11.3. Install and secure, using relevant hardware and fittings hydraulic lines P/N 109-0763-96-101 and P/N 109-0763-97-101 as shown in figure 3.

Page 8 of 17

Page 9OCROpen in PDF

B.T. 119-22 NOTE In case the connection between the hydraulic P/N 109-0763-97-101 and line P/N 109-0762-40-1 is difficult, it is possible to replace fitting P/N AN815-4D, already installed, with fitting P/N AS5406D04.

11.4. Install bracket P/N 109-0761-25-5 using relevant hardware (ref figure 3).

11.5. Secure, to box beam, the hydraulic lines P/N 109-0763-96-101 and P/N 109-0763-97-101 (as shown in figure 7) using:

a) Clamps P/N AS21919WDG04, AS21919WDG05;

b) Bolt P/N AN3-22A, washers P/N NAS1149D0332K;

c) N° 2 spacers P/N NAS43DD3-36N, and n°1 spacer P/N NAS43DD3-35N;

d) Nut P/N MS21042L3.

CAUTION Verify hydraulic lines P/N 109-0763-96-101 and P/N 109-0763-97-101 do not interfere between themselves. It is allowed to use clamps P/N AS21919WDG04, AS21919WDG05 and relevant hardware to space lines adequately.

12. Gain access inside box beam through lighteing hole, using a mirror and a suitable light source, verify that there is no interference between the hydraulic lines P/N 109-0763-97-101, 109-0761-96-101 and the tail rotor control rod assy.

CAUTION During visual inspection move pedals several times completely back and forth in order to be sure that there is no interference between hydraulic lines and tail rotor control rod.

13. Reinstall droop compensator control system linear actuator in accordance with A119 Maintenance Manual (ref. figure 2).

14. Bleed the n° 1 hydraulic system in accordance with A119 Maintenance Manual.

15. Perform functional check of the n° 1 hydraulic system flight controls in accordance with A119 Maintenance Manual, verify that there is no leakage from the installed fittings Page 9 of 17

Page 10OCROpen in PDF

B.T. 119-22

16. If removed, perform linear actuator of the droop compensator control system adjustment in accordance with A119 Maintenance Manual and moreover verify its stroke.

17. Reinstall inspection panel in its position on box beam, reusing previously removed hardware.

18. Restore sealant seep deck protections that may have been removed at step 4.2.

19. Install fairing and the doors previously removed. (ref. step 2)

20. Perform operational check of heating system in accordance with A119 Maintenance Manual

21. Return the helicopter to a ready to flight condition.

22. Record compliance with this PART of the Bollettino in the helicopter log book.

Page 10 of 17

Page 11OCROpen in PDF

B.T. 119-22 FWD Pipe assy 109-0761-64-103 Pipe assy 109-0761-65-103

TAIL ROTOR CONTROL ROD

AREA TO BE INSPECTED

TOP VIEW

REFERENCE ILLUSTRATION FIGURE 1 Page 11 of 17

Page 12OCROpen in PDF

B.T. 119-22

• LINEAR ACTUATOR REF.

REFERENCE ILLUSTRATION FIGURE 2 Page 12 of 17

Pages 13–20 of 20