Copy · Leonardo Helicopters ASB No. 139-450 Rev C · 58 pages

© Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2020-0283; AD 2021-23-22 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '3bf2445cb83dd4df860172b9b879194374b8edc3d8a25e5aa9e094ba0c293f15'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

N° 1 39-450 DA TE: April 20, 2016 REV. : C - April 10, 2018 Pag e 1 of 57 TITLE ATA 62 -

MAIN ROTOR DAMPER INSPECTIONS

REVISION LOG Present revision C is issued to remove from the effectivity of this Service Bulletin MR damper P/N 3G6220V01353, because it is no more subject to the inspections herein described. The maintenance program applicable to MR damper P/N 3G6220V01353 has been reported in AMPI Chapter 5 Issue 15.

Revision A introduced an Eddy current inspection as valid alternative to the ones already prescribed with the first issue and limited the checks on the body end up to 1200 FH while for body ends having logged more than 1200 FH since new a more stringent inspection program was provided in Service Bulletin 139-452.

Revision B was issued to introduce new MR damper P/N 3G6220V01353, fitting the new body end P/N M006-01H046-041.

Revision bars in the outer margin identify changes.

An appropriate entry should be made in the aircraft log book upon accomplishment.

If ownership of aircraft has changed, please, forward to new owner.

Leonardo S.p.A.

Via Giovanni Agusta, 520 21017 Cascina Costa di Samarate (VA) Italy Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595 ALERT

SERVICE BULLETIN

S .B. N°139-450 ALERT DATE: April 20, 2016 Page 2 of 57 REVISION: C - April 10, 2018

1. PLANNING INFORMATION A. EFFECTIVITY NOTE This Service Bulletin cancels and supersedes BT 139- 41 0 Rev. A and BT 139-446.

Part I: all MR dampers P/N 3G6220V01351 and P/N 3G6220V01352 installed on A B139 / AW139 helicopters (except S/N 31004, S/N 31007 and S/N 41237).

all MR dampers P/N 3G6220V01351, P/N 3G6220V01352 kept in stock that have logged three hundred (300) FH or more since new.

Part II: all MR dampers that have been already inspected according to Part I and that have replaced the rod end assy with a component P/N M006-01H004-041 or P/N M006-01H004-045 or P/N M006-01H004-053 not marked as per Service Bulletin 139-450 figure 7.

Part III: all body ends P/N M006-01H002-041 or P/N M006-01H002-047 and rod ends P/N M006-01H004-041 or P/N M006-01H004-045 or P/N M006-01H004-053, part of MR dampers P/N 3G6220V01351 and P/N 3G6220V01352 installed on AB139 / AW139 helicopters (except S/N 31004, S/N 31007 and S/N 41237).

Part IV: all body ends P/N M006-01H002-041 or P/N M006-01H002-047 and rod ends P/N M006-01H004-041 or P/N M006-01H004-045 or P/N M006-01H004-053, part of MR dampers P/N 3G6220V01351 and P/N 3G6220V01352 installed on AB139 / AW139 helicopters (except S/N 31004, S/N 31007 and S/N 41237).

Part V: all MR dampers P/N 3G6220V01351 and P/N 3G6220V01352 up to S/N MCR8086 included, that are installed on AB139 / AW139 helicopters (except S/N 31004, S/N 31007 and S/N 41237) and have accumulated less than 600 FH since new.

Part VI: all AB139 / AW139 helicopters (except S/N 31004, S/N 31007 and S/N 41237) equipped with MR dampers P/N 3G6220V01351 and P/N 3G6220V01352.

Part VII: all MR dampers P/N 3G6220V01351 and all MR dampers P/N 3G6220V01352 up to S/N MCR8764 (included) having rod end P/N M006-01H004-041 or -045 or -053, except MR dampers listed in table 1 of Annex A and MR dampers marked with “BT 139 -446 Part II” or “BT 139 -446 Part III” on the logcard, installed on AB139 / AW139 helicopters (except S/N 31004, S/N 31007 and S/N 41237).

all MR dampers P/N 3G6220V01351 and P/N 3G6220V01352 that have removed the damper rod end assy in accordance with AMP procedure before

S.B. N°139-450 ALERT DATE: April 20, 2016 REVISION: C - April 10, 2018 Page 3 of 57 the issuance of BT 139-446, even if they have S/N higher than MCR8764 or they are listed in table 1 of Annex A.

Part VIII: all MR dampers P/N 3G6220V01351 and all MR dampers P/N 3G6220V01352 up to S/N MCR8764 (included) having rod end assy P/N M006-01H004-041 or -045 or -053, except MR dampers listed in table 1 of Annex A and MR dampers marked with “BT 139 -446 Part II” or “BT 139- 446 Part III” on the logcard, kept in stock.

NOTE MR damper ends marked as per figure 7 are not a ffected by part I and part II of this Service Bulletin.

NOTE The MR damper exact S/N may be composed of either f our or five digits, possibly preceded by letters MCR and/or followed by letters A and/or B. For the purpose of the present instructions, only valid numerical characters are considered, neglecting “MCR”, “A”, “B” and initial zeros.

Possible examples follow:

 S/N 0272 will be referred to as S/N 272;

 S/N 00344AB will be referred to as S/N 344;

 S/N MCR1848A will be referred to as S/N 1848;

 S/N MCR07568 will be referred to as S/N 7568;

 S/N MCR10755 will be referred to as S/N 10755;

MAG confirms that no duplicates exist in the valid numerical digits of item serialization (that means that only one among S/N 715, S/N MCR0715, S/N MCR00715 or S/N MCR0715AB exists).

S .B. N°139-450 ALERT DATE: April 20, 2016 Page 4 of 57 REVISION: C - April 10, 2018 B. COMPLIANCE NOTE Rod end and body end time since new or since ov erhaul can be computed based on removal/installation data recorded on MR damper logcard Section 2.

Part I:

 within thirty (30) FH since receipt of this Service Bulletin or at first MR damper removal, whichever comes first, on MR dampers that have logged three hundred (300) FH or more since new.

 within thirty (30) FH since receipt of this Service Bulletin or when they reach three hundred (300) FH since new, whichever occurs later, on MR dampers that have not already logged three hundred (300) FH.

 before next installation on the helicopter for MR dampers kept in stock that have logged three hundred (300) FH or more since new.

Part II: three hundred (300) FH after the replacement of the rod end assy.

Part III:

 for rod end, after the last flight of each day or before the first flight of each day since the rod end has logged three hundred (300) FH or more since new or since overhaul.

 for body end, after the last flight of each day or before the first flight of each day since the body end has logged three hundred (300 ) FH or more since new and until it has logged twelve hundred (1200) FH since new.

Part IV:

 for rod end  within thirthy (30) FH since receipt of this Service Bulletin and then every ten

(10) FH for rod ends that have logged less than three hundred (300) FH since new or since overhaul.

 after the last flight of each day or before the first flight of each day since the rod end has logged three hundred (300) FH or more since new or since overhaul.

 for body end  within thirthy (30) FH since receipt of this Service Bulletin and then every ten

(10) FH for body ends that have logged less than three hundred (300) FH since new.

S.B. N°139-450 ALERT DATE: April 20, 2016 REVISION: C - April 10, 2018 Page 5 of 57  after the last flight of each day or before the first flight of each day since the body end has logged three hundred (300) FH or more since new and until it has logged twelve hundred (1200) FH since new.

Part V: within thirthy (30) FH since receipt of this Service Bulletin and then every twenty (20) FH until the affected damper reaches six hundred (600) FH Time Since New.

Part VI: within fifty (50) FH since receipt of this Service Bulletin and then every one hundred (100) FH.

Part VII: within fifty (50) FH since receipt of this Service Bulletin.

Part VIII: within three (3) months since receipt of this Service Bulletin or before the first installation on the helicopter, whichever is first.

NOTE For part IV and part V the compliance time must be sche duled starting from the date of the last inspection performed according to BT 139-410, if this has been already accomplished at least one time.

For part VI the compliance time must be scheduled starting from the date of the last inspection performed according to BT 139-446 part I, if this has been already accomplished at least one time.

Compliance with part VII and VIII is not required for helicopters / parts that have already accomplished BT 139-446 part II or part III respectively.

C. CONCURRENT REQUIREME NTS N.A.

D. REASON This Service Bulletin is issued in order to introduce a new one off and a new periodic inspection and to collect the existing periodic inspections of MR damper.

E. DESCRIPTION Some failures of MR damper in the inboard spherical bearing area were experienced by AW139 fleet; in addition, cases of rod end loosening were reported. This Service Bulletin introduces the inspections to be performed on the MR damper, until replacement with P/N 3G6220V01353 when the body end reaches twelve hundred (1200) FH.

S .B. N°139-450 ALERT DATE: April 20, 2016 Page 6 of 57 REVISION: C - April 10, 2018 F. APPROVAL The technical content of this Service Bulletin is approved under the authority of DOA nr. EASA.21.J.005. For helicopters registered under other Aviation Authorities, before applying the Service Bulletin, applicable Aviation Authority approval must be checked within Leonardo Helicopters customer portal.

EASA states mandatory compliance with inspections, modifications or technica l directives and related time of compliance by means of relevant Airworthiness Directives.

If an aircraft listed in the effectivity embodies a modification or repair not LHD certified and affecting the content of this Service Bulletin, it is responsibility of the Owner/Operator to obtain a formal approval by Aviation Authority having jurisdiction on the aircraft, for any adaptation necessary before incorporation of the present Service Bulletin.

G. MANPOWER To comply with this Service Bulletin the following MMH are deemed necessary:

Part I: six (6) MMH;

Part II: four (4) MMH;

Part III: half (0.5) MMH Part IV: half (0.5) MMH;

Part V: half (0.5) MMH;

Part VI: two (2) MMH;

Part VII:five (5) MMH;

Part VIII:half (0.5) MMH for each MR damper.

MMH are based on hands-on time and can change with personnel and facilities available.

H. WEIGHT AND BALANCE N.A.

I. REFERENCES

1) PUBLICATIONS

DATA MODULE DESCRIPTION PART DM01 39- A-00-20-00-00A-120A-A Helicopter on ground for a safe m aintenance I thru VII DM02 39- A-GG-02-00-00A-066A-A Platform, left (GG-01-00) I thru VII

S.B. N°139-450 ALERT DATE: April 20, 2016 REVISION: C - April 10, 2018 Page 7 of 57

DATA MODULE DESCRIPTION PART DM03 39- A-62-22-02-00A-520A-A Main rotor damper – Remove procedures

I, II, IV, V I, VII DM04 39- A-62-22-02-00A-720A-A Main rotor damper – Install procedures

I, II, IV, V I, VII DM05 39- A-62-22-02-01A-921A-B Rod end (lag damper) - R eplacement (remove and install a new item)

IV, VI, VII DM06 39- A-62-22-07-00A-520A-A Anti-rotation block - Remove procedu re VI DM07 39- A-62-22-07-00A-720A-A Anti-rotation block - Install procedu re VI

2) ACRONYMS AMDI Aircraft Material Data Information AMP Aircraft Maintenance Publication AMPI Aircraft Maintenance Planning information AR As Required BT Bollettino Tecnico DM Data Module FH Flight Hours ITEP Illustrated Tools and Equipment Publication LHD Leonardo Helicopter Division LS Local Supply MMH Maintenance-Man-Hours MMIR Maintenance Malfunction Information Report MR Main Rotor

3) ANNEX Annex A MAG In Service Query Record n° ISQR- 16-002 Annex B MR damper eddy current inspection J. PUBLICATIONS AFFECTED N.A.

K. SOFTWARE ACCOMPLISHMENT SUMMARY N.A.

S .B. N°139-450 ALERT DATE: April 20, 2016 Page 8 of 57 REVISION: C - April 10, 2018

2. MATERIAL INFORMATION A. REQUIRED MATERIALS

1) PARTS A MR damper or a rod end assy, as applicable, can be ordered to LHD only in case replacement is requested by this Service Bulletin.

NOTE MR damper P/N 3G6220V01353 is fully i nterchangeable and mixable on the same MR Hub with a damper with different P/N.

If a MR damper P/N 3G6220V01353 is furnished to replace a damper with different P/N, also a new antirotation block P/N 3G6220A05353 must be supplied to replace the existing one.

The new anti-rotation block P/N 3G6220A05353 can be used also with damper with different P/N.

2) CONSUMABLES The following consumable materials, or equivalent, are necessary to accomplish this Service Bulletin:

# Spec./LHD code number DESCRIPTION Q.TY NOTE PART 1 Commercial Masking tape, adhesive AR LS (1) I, II 2 Commercial Clean, lint-free, dry cloth (C011) or a bsorbent toweling AR LS (1) I, II 3 QPL-AMS2644 Penetrant, Type II, Method C, in aerosol c ontainer AR LS (1) I, II 4 QPL-AMS2644 Solvent remover, class 2, in aerosol c ontainer AR LS (1) I, II 5 MS20995C41 Safety wire (C241) AR LS VII, V III 6 PERMACEL P422 Cod. No.

900002514 or 900002515 or 900002516 or 900002517 Tape, antifretting AR LS VII, V III 7 MIL-PRF-85285, Ty. I C olor N° 37038 Polyurethane paint, black AR LS (1) I, II 8 TT- N- 95 Aliphatic naphtha (C059) AR LS III 9 Commercial Strap, tiedown 2 LS Refer also to AMDI for the consumable materials required to comply with the AMP DM referenced in the compliance instructions.

3) LOGISTIC MATRIX N.A.

S.B. N°139-450 ALERT DATE: April 20, 2016 REVISION: C - April 10, 2018 Page 9 of 57 NOTE

(1) Required to perform the dye penetrant inspection. Refer to Annex B for consumable materials required for the Eddy Current inspection.

B. SPECIAL TOOLS The following special tools, or equivalent, are necessary to accomplish this Service Bulletin:

# P/N DESCRIPTION Q.TY NOTE PART 10 RMGE-DS-06-2010-LH or a pproved alternative Platform left (GG-01-00) AR LS I thru VII 11 / Magnifying glass (5 power) 1 LS (B1) I, II, III 12 / Brush, fine tipped 1 LS (B1) I, II 13 Commercial Luxmeter 1 LS (B1) I, II 14 / Small, clean, dry, not contamined recipient ( beaker or equivalent) 1 LS (B1) I, II 15 Commercial Mirror 1 LS III, V 16 Commercial Torque wrench (capability up to 100 Nm - 8 85 lb in) 1 LS VI, VII, VIII 17 Commercial Spanner 1-5 /16” 1 LS VII, VIII 18 Commercial Spanner 5/8” 1 LS VI, VII, VIII 19 Commercial Digital centesimal caliper 1 LS VI Refer also to ITEP for the special tools required to comply with the AMP DM referenced in the compliance instructions.

SPECIAL TOOLS NOTE Required to perform the dye penetrant inspection. Refer to Annex B for special (B1) tools required for the Eddy Current inspection.

C. INDUSTRY SUPPORT INFORMATION WARRANTY: Owners/Operators who comply with the instructions of this Service Bulletin no later than the applicable date in the “Compliance” section will be eligible to receive Main Rotor Damper or a Rod End Assy, as applicable, on a free of charge basis, except for Consumable Materials & Special Tools.

Please Issue relevant MMIR form to your Warranty Administration Dpt.

S .B. N°139-450 ALERT DATE: April 20, 2016 Page 10 of 57 REVISION: C - April 10, 2018

3. ACCOMPLISHMENT INSTRUCTIONS PART I NOTE Skip steps 1 thru 3 when performing the inspection on t he MR dampers kept in stock.

1. In accordance with DM 39-A-00-20-00-00A-120A-A, prepare the helicopter on ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or the external power supply.

2. Put the platform (GG- 01-00), or an approved alternative, adjacent to the left side of the fuselage.

3. Remove the MR dampers. Refer to AMP, see DM n° 39-A-62-22-02-00A-520A-A.

NOTE It is suggested to start the inspection on all the MR da mpers at the same time.

NOTE As an alternative to the dye penetrant inspection de scribed at following step 4, it is allowed to perform the Eddy Current inspection, according to Annex B.

4. With reference to figures 1 thru 6, perform the dye penetrant inspection of the MR damper. Operative conditions and inspection sequence shall be compliant with ASTM E1417, in particular the following steps shall be followed:

4.1 Put the MR damper on a suitable work bench, as shown in figure 2.

4.2 With reference to figure 3, on each spherical bearing, protect the liner with masking tape as follows:

NOTE The areas to be inspected are shown in figure 1 (one si de shown, the other is symmetrical), identified by the red boxes.

CAUTION Make sure that the solvent does not come in contact w ith the spherical bearing liner.

4.2.1 Clean the surface on both sides of both ends with a clean cloth (C011) soa ked with solvent. Let the solvent air dry.

S.B. N°139-450 ALERT DATE: April 20, 2016 REVISION: C - April 10, 2018 Page 11 of 57 NOTE If there are slippage marks in the areas to be i nspected, remove the paint, from the damper end surface only, using solvent.

CAUTION Make sure that the adhesive masking tape adheres compl etely to the damper ends surface, when performing following step 4.2.2.

4.2.2 Protect the surface all around the areas to be inspected according to f igures 3 thru 5, using adhesive masking tape. Make sure that the tape is tangent to the bearing seat, according to figures 4 and 5.

4.3 Inspect the damper ends as follows:

CAUTION Make sure that, during the inspection, the part is al ways under appropriate illumination. The lighting system shall provide at least 1000 lx (100 fc) at the examination surface. Use the luxmeter to confirm this condition.

4.3.1 Clean the areas to be inspected, on both sides of both ends, with a cl ean cloth (C011) soaked with solvent. Let the solvent air dry.

CAUTION Make sure that the recipient is clean, dry and free from an y contaminant.

4.3.2 Put a few drops of penetrant in a small recipient (beaker or equivalent) .

CAUTION Make sure not to apply too much penetrant, when pe rforming following step 4.3.3.

4.3.3 Apply the penetrant with a clean, dry, fine tipped brush on all the ar eas to be inspected, according to figure 6 (same application to be carried out on the other side). Let the penetrant dwell.

NOTE Dwell time must be at least one hour and no more than t wo hours.

4.3.4 Clean the penetrant in excess by first with a cl ean, dry, lint-free cloth (C011) or absorbent towelling.

S .B. N°139-450 ALERT DATE: April 20, 2016 Page 12 of 57 REVISION: C - April 10, 2018

4.3.5 If penetrant in excess remain, remove it with a solvent dampened lintfree cloth (C011) or towel, until the penetrant in excess has been completely removed. Let the solvent air dry.

4.3.6 Let the penetrant develop for at least thirty minutes without developer.

4.3.7 Inspect the areas shown in figure 1 using the magnifying glass.

4.3.7.1 If you don’t find indication of cracks, go to step 4.4.

4.3.7.2 If you find indication of cracks, confirm the crack by wipe-off.

4.3.7.3 If, at step 4.3.7.2, you have confirmed presence of cracks on the body end or on the rod end, contact Product Support Engineering ( CSE.AW139.AW@leonardocompany.com) for further instruction.

4.4 Remove the adhesive masking tape from all the serviceable damper ends.

CAUTION Make sure that the solvent does not come in contact w ith the spherical bearing liner.

4.5 Clean all the surfaces on both sides of both ends using a cloth (C011) soaked w ith solvent until all the penetrant has been removed.

4.6 Mark a black dot, using polyurethane black paint, on the rod end and on the body end, in positions shown in figure 7.

4.7 If you have removed slippage marks, cleaning the damper end surface at step

4.2.1, restore the slippage mark using the applicable paint colour: yellow, green or blue. Use commercially available varnish such as thread securing/sealing product or equivalent alternatives. Let dry for one hour at 25°C, or as otherwise specified by product specification.

5. Install the MR damper/dampers. Refer to AMP, see DM n° 39-A-62-22-02-00A-720A-A.

6. Remove the platform (GG- 01-00) from the left side of the fuselage.

7. Return the helicopter to flight configuration.

8. Record for compliance with part I of this Service Bulletin on the MR damper logcard.

9. Send the attached compliance form to the following mail box:

cse.aw139.aw@leonardocompany.com As an alternative, gain access to My Communications section on Leonardo WebPortal an d compile the “Service Bulletin Application Communication”.