Copy · Leonardo Helicopters Emergency ASB No. 412-165 · 14 pages

© Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2021-0724, the docket of AD 2021-19-05. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'c7fe31e40a9e57100eb7c25384427a8d86732db02db88391a4b1eb77b58982e8'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Pa ge 1 of 13 N° 412-165 DA TE: March 12, 2021 REV. : / - M arch 15, 2017 TITLE ATA 25 – HOIST SUPPORT ASSY P/N 212-8800-02-1, INSPECTION OF

REVISION LOG First Issue Leonardo S.p.A.

Via Giovanni Agusta, 520 21017 Cascina Costa di Samarate (VA) Italy Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595 An appropriate entry should be made in the aircraft log book upon accomplishment.

If ownership of aircraft has changed, please, forward to new owner.

EMERGENCY ALERT

SERVICE BULLETIN

S.B. N°412-165 EMERGENCY ALERT DATE: March 12, 2021 Page 2 of 13 REVISION: /

1. PLANNING INFORMATION A. EFFECTIVITY All the AB412/AB412EP helicopters equipped with hoist support assy P/N 212-8800-02-1.

All the hoist support assy P/N 212-8800-02-1 kept at stock.

B. COMPLIANCE Before the next flight.

C. CONCURRENT REQUIREMENTS N.A.

D. REASON This Service Bulletin is issued in order to provide the necessary instruction on how to perform a Liquid Fluorescent Penetrant inspection of the hoist support assy P/N 212- 8800-02-1.

E. DESCRIPTION A case of crack has been found on the hoist support assembly P/N 212-8800-02-1 installed on a military helicopter. This condition, if not detected and corrected, could affect the structural integrity of the hoist support assembly. While the investigation in determining the root cause and the corrective action is ongoing, LHD decided, as a precautionary measure to issue this SB to introduce a one-off inspection with Liquid Fluorescent Penetrant inspection method on a specific area of the hoist support. The inspection does not require to remove the hoist support from the helicopter.

F. APPROVAL The technical content of this Service Bulletin is approved under the authority of DOA nr.

EASA.21.J.005. For helicopters registered under other Aviation Authorities, before applying the Service Bulletin, applicable Aviation Authority approval must be checked within Leonardo Helicopters customer portal. EASA states mandatory compliance with inspections, modifications or technical directives and related time of compliance by means of relevant Airworthiness Directives.

If an aircraft listed in the effectivity embodies a modification or repair not LHD certified and affecting the content of this Service Bulletin, it is responsibility of the Owner/Operator to obtain a formal approval by Aviation Authority having jurisdiction on

S.B. N°412-165 EMERGENCY ALERT DATE: March 12, 2021 REVISION: / Page 3 of 13 the aircraft, for any adaptation necessary before incorporation of the present Service Bulletin.

G. MANPOWER To comply with this Service Bulletin 2 (two) MMH are deemed necessary.

MMH are based on hands-on time and can change with personnel and facilities available.

H. WEIGHT AND BALANCE N.A.

I. REFERENCES

1) PUBLICATIONS AB412-MM Maintenance Manual BHT-ALL-SPM Standard Practices Manual

2) ACRONYMS & ABBREVIATIONS AR As Required DOA Design Organization Approval EASA European Aviation Safety Agency LHD Leonardo Helicopters MM Maintenance Manual MMH Maintenance Man Hours P/N Part Number S/N Serial Number SB Service Bulletin

3) ANNEX Annex A AB412/AB412EP hoist support localized penetrant inspection Type 1, Method C, Level 3, Form “d”.

J. PUBLICATIONS AFFECTED N.A.

K. SOFTWARE ACCOMPLISHMENT SUMMARY N.A.

S.B. N°412-165 EMERGENCY ALERT DATE: March 12, 2021 Page 4 of 13 REVISION: /

2. MATERIAL INFORMATION A. REQUIRED MATERIALS

1) PARTS N.A.

2) CONSUMABLES The following consumable materials, or equivalent, are necessary to accomplish this Service Bulletin:

# SPEC./LHD CODE NUMBER DESCRIPTION Q.TY NOTE PART 1 SAE-AMS-2644, Type I, Method C, Level 3 Dye Penetrant AR (1)(2) - 2 SAE-AMS-2644, Type I, Form “d” Developer AR (1)(2) - 3 SAE-AMS-2644 Cl II Solvent AR (1)(2) - 4 Commercial Small soft clean brush AR (1) - 5 Commercial Clean, dry, lint-free cloth or absorbent toweling AR (1) - 6 Commercial Chemical paint remover AR (1) - 7 Commercial Surface finishing paint AR (1) -

3) LOGISTIC MATRIX N.A.

NOTE

(1) Local supply.

(2) This material shall be certified in accordance with AMS2644, obtained from a supplier listed in QPL-AMS2644, supplied from the same manufacturer and in aerosol cans packaging.

B. SPECIAL TOOLS The following special tools, or equivalent, are necessary to accomplish this Service Bulletin:

# P/N DESCRIPTION Q.TY NOTE PART 8 Commercial Dark curtain 1 (B1) - 9 Commercial Magnifying lens 5x 1 (B1) - 10 Commercial UV-A inspection lamp 1 (B1)(B2) - 11 Commercial UV-A/White light meters 1 (B1) - 12 Commercial Environmental thermometer 1 (B1) - Refer also to Annex A for the equipment/tools required for the liquid penetrant inspection.

S.B. N°412-165 EMERGENCY ALERT DATE: March 12, 2021 REVISION: / Page 5 of 13

SPECIAL TOOLS NOTE Item to be procured as local supply.

This lamp should emit at least 1200 µW/cm² and no more than 20lux at 38cm from the front of the filter to the face of the sensor.

C. INDUSTRY SUPPORT INFORMATION Owners/Operators who comply with the instructions of this Service Bulletin no later than the applicable date in the “Compliance” section will be eligible to receive REQUIRED MATERIALS on free of charge basis, except for Consumable Materials and Special Tools.

NOTE 1: Customers who fail to comply with the instructions in this Service Bulletin before the compliance date are not eligible for the aforementioned special policy.

Please Issue relevant MMIR form to your Warranty Administration Dpt accompanied by INSPECTION REPORT and PICTURE of the affected area.

NOTE 2: The INSPECTION REPORT and PICTURE are mandatory; in case the MMIR is not accompanied by these documents, it will be rejected.

S.B. N°412-165 EMERGENCY ALERT DATE: March 12, 2021 Page 6 of 13 REVISION: /

3. ACCOMPLISHMENT INSTRUCTIONS

GENERAL NOTE Place an identification tag on all components that are reusable, including the attaching hardware that has been removed to gain access to the modification area and adequately protect them until their later re-use.

NOTE Hoist support assy P/N 212-8800-02-1 kept at stock must be inspected in accordance with step 2 before their installation on the helicopter.

1. In accordance with AB412-MM, prepare the helicopt er on ground for a safe maintenance.

Disconnect the battery, all electrical power sources and/or the external power supply.

NOTE This inspection does not require removal of the hoist support from the helicopter.

2. With reference to Figure 1 and 2, in accordance w ith Annex A, perform surface Fluorescent Penetrant Inspection of the hoist support assy P/N 212-8800-02-1 on the indicated area:

2.1 if no evidence of or crack is found, proceed to step 3.

2.2 if evidence of crack is found, inform Leonardo Helicopters at absereng.aw@leonardocompany.com providing detailed pictures of the crack. In accordance with AB412-MM, remove from service the damaged hoist support and replace it with a serviceable one.

3. Return the helicopter to a ready to flight condition and record for compliance with this Service Bulletin on the helicopter logbook.

4. Send the attached compliance form to the following mail box:

absereng.aw@leonardocompany.com As an alternative, gain access to My Communications section on Leonardo WebPortal and compile the “Service Bulletin Application Communication”.

 Non cancellare mai questo segnalibro Non cancellare mai interruzione sezione 

Figure 1 S.B. N°412-165 EMERGENCY ALERT DATE: March 12, 2021 REVISION: / Page 7 of 13

Figure 2 S.B. N°412-165 EMERGENCY ALERT DATE: March 12, 2021 Page 8 of 13 REVISION: /

ANNEX A S.B. N°412-165 EMERGENCY ALERT DATE: March 12, 2021 REVISION: / Page 9 of 13

ANNEX A AB412/AB412EP HOIST SUPPORT LOCALIZED PENETRANT INSPECTION TYPE 1, METHOD C, LEVEL 3, FORM “d”

ANNEX A S.B. N°412-165 EMERGENCY ALERT DATE: March 12, 2021 Page 10 of 13 REVISION: / 1 PURPOSE AND APPLICABILITY This procedure details the requirements for the Liquid Penetrant Inspection (PT) on the hoist support assy P/N 212-8800-02-1. The specific Penetrant system to be used is Type I, Method C, Sensitivity Level 3, form “d”. Purpose of this inspection is the detection of any possible crack located on a specific surface of hoist support.

2 REFERENCES The following documents in their last revision are considered part of this procedure:

ASTM E1417 Standard Practice for Liquid Penetrant Testing;

ASTM E3022 Standard Practice for Measurement of Emission Characteristics and Requirements for LED UV-A Lamps Used in Fluorescent Penetrant and Magnetic Particle Testing;

EN4179/NAS410 Qualification and approval of personnel for non-destructive testing;

QPL AMS2644 Qualified Product List of Inspection Materials, Penetrant;

SAE AMS2644 Inspection Materials, Penetrant.

3 EQUIPMENT AND MATERIALS The following materials, equipment and tools are requested.

3.1 MATERIALS

WARNING

SOLVENT CLEANERS AND DEVELOPER CARRIER FLUIDS ARE DANGEROUS. OBSERVE ALL

RELEVANT SAFETY PRECAUTIONS TO PREVENT THE RISK OF INJURY, FIRE OR EXPLOSION.

a. Dye Penetrant SAE-AMS-2644 TY I, Method C, Level 3 (*);

b. Developer SAE-AMS-2644 Form “d” (*);

c. Solvent SAE-AMS-2644 Class 2 (*).

(*) All the materials shall be certified in accordance with AMS2644, obtained from a supplier listed in QPL-AMS2644, supplied from the same manufacturer and in aerosol cans packaging.

3.2 EQUIPMENT/TOOLS

a. Dark curtain;

b. Luxmeter for checking the illuminance (20 lux maximum on the part during the inspection and the 100 lux maximum for excess penetrant removal phase);

ANNEX A S.B. N°412-165 EMERGENCY ALERT DATE: March 12, 2021 REVISION: / Page 11 of 13

c. Radiometer for checking the minimum 1,200 W/cm2 on the part during the inspection;

d. UV-A lamp suitable for achieving an irradiance of at least 1,200 W/cm2 on the area of inspection at 38 cm from the lamp; in case of use of a LED UV-A lamp, it shall be certified in accordance with ASTM E3022;

e. White light lamp suitable for achieving an illuminance of at least 1,000 lux on the inspection surface when needed for further analysis;

f. Small soft clean dry brush to apply penetrant;

g. Clean, dry, lint-free cloth or absorbent toweling;

h. A magnification lens (max 5x);

i. An environmental thermometer.

4 PERSONNEL Personnel performing the inspection of this procedure and appointed for the interpretation and evaluation of the indications shall be qualified as a minimum Level 2 in the PT Method and for the Technique “Type 1, Method C” in accordance with the requirements of EN4179/NAS410. The personnel shall also be familiar with the purpose of this procedure.

5 PART PREPARATION Due to the presence of paint on the inspection area, the paint must be removed with a suitable chemical paint remover after masking the area to be inspected. To facilitate the removal of the paint after the action of the paint remover, a soft plastic brush (toothbrush) can be used. Class 2 solvent must be used for the final cleaning of the inspection area before proceeding with the steps identified in paragraph 6. The operation shall be repeated as many times as necessary in order to remove any surface contamination. Any abrasion tool is forbidden.

The accuracy of the cleaning on the entire inspection surface shall be verified under white light at 1,000 lux minimum and with the use of the mirror and the lens as necessary.

6 ISPECTION If not otherwise specified below, the inspection process shall be in compliance with the requirements of ASTM E1417.

6.1 TEMPERATURE CONTROL The inspection can only be carried out when the temperature of the room, part, and materials is in the range of 10-45°C (50-113 °F). Make sure that the parts and materials stayed inside the environment in which the inspection is performed for a time enough to ensure thermal equilibrium.

ANNEX A S.B. N°412-165 EMERGENCY ALERT DATE: March 12, 2021 Page 12 of 13 REVISION: /

6.2 PENETRANT APPLICATION NOTE Do not spray the liquid penetrant directly on the inspection area.

The penetrant shall be applied on the inspection are a by means of the soft bristled brush and verified under UV-A light. Penetrant Dwell Time shall be a minimum of 30 minutes and no more than 60 minutes.

6.3 PENETRANT REMOVAL Solvent-removable penetrant is removed by first wiping the excess penetrant with a clean, lint-free, dry cloth or absorbent toweling. The remainder of the surface penetrant is then removed with Class 2 solvent-dampened lint-free cloth or towel;

the use of cloths or paper soaked with the solvent or the spraying of solvent directly on to the part is prohibited.

The complete removal of the excess of penetrant shall be verified under UV-A lamp at 100 W/cm2 minimum and no more than 100 lux on the area of inspection.

6.4 DEVELOPER APPLICATION

CAUTION In case of any developer dripping, the part shall be carefully cleaned and the whole process repeated from “Part Preparation”.

In case of exceeding 60 minutes, the part shall be carefully cleaned and the whole process repeated from “Part Preparation”.

The developer shall be applied to the part when the solvent is completely evaporated; the application shall be done directly from the aerosol can, which requires agitating regularly to keep the developer suspended in the carrier vehicle.

The correct application shall result in a thin and uniform film and the color of the part should be just visible through the developer.

The developer dwell time shall be 10 minutes minimum and shall not exceed 1 hour.

6.5 OBSERVATION REQUIREMENTS The part shall be covered with the darkening curtain with the UV-A lamp turned on;

the following conditions shall be verified on the inspection surface:

a) An irradiance of at least 1,200 W/cm2,

Pages 13–14 of 14