Copy · A382-57-99 R1 · 21 pages

© LOCKHEED MARTIN CORPORATION. Filed by the FAA in regulations.gov docket FAA-2021-0341; AD 2021-09-15 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'c4688ca4a3284a2e415e6ac6abc3394aef2724cd06999455a4c153276a587dc5'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

HERCULES Lockheed Martin Aeronautics CompanyMarietta, Georgia 30063

ALERT SERVICE BULLETIN Revision 1, February 17, 2021 A382-57-99 THIS DOCUMENT CONTAINS COMMERCIAL PROPRIETARY TECHNICAL DATA OF LOCKHEED MARTIN CORPORATION AND OTHERS. USE, COPYING AND/OR DISCLOSURE OF THE TECHNICAL DATA CONTAINED HEREIN IS GOVERNED BY THE TERMS OF LOCKHEED MARTIN CORPORATION'S L-100 SALES CONTRACT WITH THE CUSTOMER.

© 2021 LOCKHEED MARTIN CORPORATION.

EXPORT CONTROLLED INFORMATION WARNING - This document contains data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) as amended, or the Export Administration Act (Title 50, U.S.C., App 2401 et seq.) as amended. Violations of these export laws are subject to severe criminal and civil penalties.

*REVISION NOTICE*

WING - INSPECTION OF CENTER WING FORWARD CORNER FITTINGS, CENTER/OUTER WING CORNER

FITTING FASTENERS, AND RETORQUE OF WING JOINT FRONT BEAM WEB SPLICE BOLTS Attached is Revision 1, dated February 17, 2021, to Service Bulletin A382-57-99. Information added or changed in this issue is indicated by a vertical revision bar in the margin of affected pages, or pointing hand for illustrations.

This revision updates Section 1, Paragraph G: Section 2, Accomplishment Instructions, and replaces the artwork for Figure 1, Sheet 2.

This revision is a complete reissue and replaces the basic issue of this Service Bulletin dated February 12, 2021.

Retain this notice with your copy of this Service Bulletin.

Aircraft modified by the basic issue of this Service Bulletin will require rework.

List of Previous Revisions and/or Reissues __________#__________ File: I-5137R1 Basic February 12, 2021

No text on this page: it may be a figure. Open the PDF to see it.

HERCULES Lockheed Martin Aeronautics CompanyMarietta, Georgia 30063

ALERT SERVICE BULLETIN Page 1 of 19 A382-57-99 THIS DOCUMENT CONTAINS COMMERCIAL PROPRIETARY TECHNICAL DATA OF LOCKHEED MARTIN CORPORATION AND OTHERS. USE, COPYING AND/OR DISCLOSURE OF THE TECHNICAL DATA CONTAINED HEREIN IS GOVERNED BY THE TERMS OF LOCKHEED MARTIN CORPORATION'S L-100 SALES CONTRACT WITH THE CUSTOMER.

© 2021 LOCKHEED MARTIN CORPORATION.

EXPORT CONTROLLED INFORMATION WARNING - This document contains data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) as amended, or the Export Administration Act (Title 50, U.S.C., App 2401 et seq.) as amended. Violations of these export laws are subject to severe criminal and civil penalties.

February 12, 2021 Revision 1, February 17, 2021

WING - INSPECTION OF CENTER WING FORWARD CORNER FITTINGS, CENTER/OUTER WING CORNER

FITTING FASTENERS, AND RETORQUE OF WING JOINT FRONT BEAM WEB SPLICE BOLTS

1. PLANNING INFORMATION A. EFFECTIVITY

(1) This Service Bulletin is app licable to all model 382, 382B, 382E, 382F, and 382G FAA Certificated Hercules aircraft (excluding 382J series aircraft).

(2) Spares - This Service Bulle tin is not applicable to spares.

B. REASON

(1) The purpose of this Alert Ser vice Bulletin is to inspect the left and right center wing upper and lower forward corner fittings for cracking, to check for sheared fasteners in the center and outer wing upper and lower forward corner fitting attachments, and to retorque the fasteners in the outer wing to center wing beam web splice angles. This inspection is being accomplished because a crack was found in-service on the web attachment flange of the center wing upper forward corner fitting. Loose fasteners in the WS 220 wing joint at the front beam web can cause internal load redistribution resulting in cracked center wing upper and lower corner fittings and failed fasteners in the center and outer wing upper and lower corner fittings.

(2) Lockheed Martin Aeronautics Company recommends that the wing joint front beam web fastener retorque specified herein be accomplished on all aircraft with less than 2,500 Flight Hours. The fastener retorque should be performed at the next scheduled maintenance after receipt of this Alert Service Bulletin but not to exceed 270 days.

(3) Lockheed Martin Aeronautics Company recommends that the corn er fitting inspection and wing joint front beam web fastener retorque specified herein be accomplished on all aircraft that have accumulated more than 2,500 Flight Hours. The inspection and fastener retorque should be performed within 90 days after receipt of this Alert Service Bulletin.

C. DESCRIPTION An eddy current surface scan inspection will be performed on the center wing upper and lower forward corner fittings. An inspection and check torque will be performed on the left and right center and outer wing upper and lower forward corner fitting fasteners. The outer wing to center wing joint front beam web splice angle NAS6205 bolts will be retorqued to a higher torque value to prevent loosening of fasteners in service.

D. APPROVAL

(1) The aircraft owner /operator will make an appropriate entry in the aircraft log records upon compliance with this Service Bulletin.

USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE STATEMENT ON THE TITLE PAGE OF THIS DOCUMENT. February 12, 2021 Revision 1, February 17, 2021 HERCULES Lockheed Martin Aeronautics CompanyMarietta, Georgia 30063

ALERT SERVICE BULLETIN A382-57-99

(2) After the work has been completed on each affected aircraft, please complete and e-mail a Notice of Service Bulletin Compliance to hercules.support@lmco.com; or notify Lockheed Martin Aeronautics Company of compliance with this Service Bulletin at website address:

http://www.lockheedmartin.com/csc and log into Data Library.

E. MANPOWER The manpower estimates provided have not been validated and are estimates only. These estimates are provided only as a convenience for aircraft owner/operator planning purposes. It is estimated that approximately 40 man-hours (a crew of two qualified technicians) will be required to accomplish the work described herein on each affected aircraft. This will take approximately 20 hours elapsed time while the aircraft is out of service.

NOTE: This Service Bulletin is based upon the configuration of the aircraft as it was delivered from Lockheed Martin Aeronautics Company. Previous service bulletins issued by Lockheed Martin Aeronautics Company have been considered in the preparation of this Service Bulletin, but no consideration has been given to peculiar changes made to the aircraft by the owner/operator since its delivery.

F. MATERIAL - COST AND AVAILABILITY None.

G. TOOLING - PRIC E AND AVAILABILITY

(1) Eddy Current Unit, Nortec, 16- pin LEMO cable connector, Models 2000D/2000D+, or equivalent.

(2) Straight probe, shielded, 1/8 inch diameter, 1/2-inch drop, frequency to include 200kHz, VM Products P/N VM202RAF-6, or equivalent.

(3) Probe, straight, shielded, 1/ 16 inch diameter, frequency to include 200kHz, VM Products P/N VM200-.063 X 4, or equivalent.

(4) Probe, straight, shielded, 1/8 inch diameter, frequency to include 200 kHz, VM Products P/N VM200F-4, or equivalent.

(5) Cable, 6 foot, VM Products, P/N VM99L16/M-NR, or equivalent.

(6) Standard, aluminum, VM Products, P/N VM30889-C1A, or equival ent.

H. WEIGHT AND BALANCE None.

I. REFERENCES Hercules Maintenance Manual Hercules Structural Repair Manual SMP 515-C SP-163 TO 1C-130A-36

USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE STATEMENT ON THE TITLE PAGE OF THIS DOCUMENT.

HERCULES Lockheed Martin Aeronautics CompanyMarietta, Georgia 30063

ALERT SERVICE BULLETIN A382-57-99February 12, 2021 Revision 1, February 17, 2021 J. OTHER PUBLICATIONS AFFECTED Aircraft Scheduled Inspection and Maintenance Requirements

USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE STATEMENT ON THE TITLE PAGE OF THIS DOCUMENT. February 12, 2021 Revision 1, February 17, 2021 HERCULES Lockheed Martin Aeronautics CompanyMarietta, Georgia 30063

ALERT SERVICE BULLETIN A382-57-99 THIS PAGE INTENTIONALLY LEFT BLANK.

USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE STATEMENT ON THE TITLE PAGE OF THIS DOCUMENT.

HERCULES Lockheed Martin Aeronautics CompanyMarietta, Georgia 30063

ALERT SERVICE BULLETIN A382-57-99February 12, 2021 Revision 1, February 17, 2021

2. ACCOMPLISHMENT INSTRUCTIONS WARNING: OBSERVE ALL APPLICABLE SAFETY PRECAUTIONS WHILE ACCOMPLISHING THIS INSPECTION. ENSURE THAT ALL ELECTRICAL AND HYDRAULIC POWER SOURCES ARE

OFF, THE BATTERY AND EXTERNAL ELECTRICAL POWER DISCONNECTED, AND HYDRAULIC SYSTEMS DEPRESSURIZED BEFORE STARTING THE WORK. FAILURE TO COMPLY MAY RESULT IN SERIOUS INJURY OR DEATH.

NOTE: Center wing corner fitting inspections are based on the existing procedures described in the SMP 515-C, SP-163 or TO 1C-130A-36.

A. Prepare aircraft for inspection and/or modification as follow s:

(1) RC - Remove electrical powe r from aircraft. Refer to applicable Hercules Maintenance Manual .

(2) RC - Remove the hydraulic and fuel equipment dry bay and tan k access doors number (133/134) from the upper surface of the center wing behind engines No. 2 and 3. Refer to applicable Hercules Maintenance Manual.

WARNING: DO NOT ENTER FUEL AREAS UNLESS FUEL VAPOR CONTENT IS 0.0 PERCENT LOWER

EXPLOSIVE LIMIT (LEL) (NO RESPIRATOR PROTECTION REQUIRED) WITH AN OXYGEN CONCENTRATION NOT LESS THAN 19.5 PERCENT. PROVIDE CONTINUOUS VENTILATION IN THE FUEL AREA THROUGHOUT THIS PROCEDURE.

(3) RC - Depuddle, as required, a nd purge the dry bay areas. Refer to applicable Hercules Maintenance Manual to the 0.0 percent LEL and 19.5 percent oxygen content.

(4) Open and lock the nacelle acc ess panels (299/300) behind Engines No. 2 and 3 to gain access to the inspection areas on the forward side of the upper forward corner fitting. Refer to applicable Hercules Maintenance Manual.

(5) Remove the leading edges immediately outboard of the No. 2 a nd No. 3 engine nacelles for access to the front beam at the OWS 0 to 20 location. Refer to applicable Hercules Maintenance Manual.

(6) Remove Nacelle access panel number 36 on the outboard sides of Engines No. 2 and 3 to gain access to retorque the wing joint front beam web splice bolts at WS 220. Refer to applicable Hercules Maintenance Manual.

(7) Brush or wipe all loose dirt and debris from the inspection areas.

CAUTION: DO NOT USE METALLIC TOOLS TO REMOVE SEALANT. EQUIPMENT DAMAGE COULD OCCUR.

(8) Remove sealant from the ins pection area using a non-metallic scraper. Metallic tools shall not be used to remove sealant.

WARNING: ISOPROPYL ALCOHOL AND CLEANING COMPOUND ARE FLAMMABLE AND TOXIC TO EYES, SKIN AND RESPIRATORY TRACT. SKIN AND EYE PROTECTION IS REQUIRED. GOOD GENERAL VENTILATION IS NORMALLY ADEQUATE. AVOID ALL SOURCES OF IGNITION.

(9) Remove oil, grease and resid ual sealant by wiping area with clean rags wet with ASTM D 770 Isopropyl Alcohol or MIL-PRF-87937 Cleaning Compound. Residual thin films of sealant may take several applications of solvent, scraping and wiping to be completely removed.

(10) Remove any flaking and/or loose paint from the inspection areas.

USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE STATEMENT ON THE TITLE PAGE OF THIS DOCUMENT. February 12, 2021 Revision 1, February 17, 2021 HERCULES Lockheed Martin Aeronautics CompanyMarietta, Georgia 30063

ALERT SERVICE BULLETIN A382-57-99 B. Inspection Procedures:

(1) Calibration

(a) Use the following NDI Equipment:

1 Eddy Current Unit, Nortec, 16-pin LEMO cable connector, Models 2000D/2000D+, or equivalent.

2 Probe, right angle, shielded, 1/8 inch diameter, 1/4-inch drop, frequency to include 200kHz, VM Products P/N VM202RAF-6, or equivalent.

3 Probe, straight, shielded, 1/16 inch diameter, frequency to include 200kHz, VM Products P/N VM200-.063 X 4, or equivalent.

4 Probe, straight, shielded, 1/8 inch diameter, frequency to include 200 kHz, VM Products P/N VM200F-4, or equivalent.

5 Cable, 6 foot, VM Products, P/N VM99L16/M-NR, or equivalent.

6 Standard, aluminum, VM Products, P/N VM30889-C1A, or equivalent.

(b) Nortec 2000D or 2000S Equipment Preparation:

1 Connect probe and cable to the instrument. Probe and cable shall connect directly to the 16-pin LEMO connector on the Nortec 2000D or 2000S. Use of any adapters to mate with other types of probes is prohibited without authorization.

2 Connect eddy current unit to power source, if necessary.

3 Refer to manufacturer's instrument manual for all operating instructions.

4 The part to be inspected, calibration standard, inspection unit and probe must be at ambient temperature to assure that valid test data is obtained.

5 Adjust initial equipment settings as follows:

NOTE: Minor adjustments to these settings are allowable to achieve optimum signal characteristics.

a On main menu, set FREQUENCY 1 to 200 KHZ, set FREQUENCY 2 to OFF (not applicable to the Nortec 2000S), set HORIZONTAL GAIN to 65.0 dB, set VERTICAL GAIN to 75.0 dB, and set ANGLE to 70 degrees.

b On filter menu, set LP FILTER to 100 Hz, set HP FILTER to OFF, and set CONT NULL to OFF.

c On display menu, set SWEEP to OFF, Set V-POS to 10%, and set H-POS to 80%.

d On screen menu, set PERSIST to OFF, set DISP ERASE to 3.0 S, set GRATICULE to ON, set DOT/BOX to ON, and set SWEEP to OFF.

e On setup menu, set FREQ to SINGLE, and PRB DRV to MID.

USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE STATEMENT ON THE TITLE PAGE OF THIS DOCUMENT.

HERCULES Lockheed Martin Aeronautics CompanyMarietta, Georgia 30063

ALERT SERVICE BULLETIN A382-57-99February 12, 2021 Revision 1, February 17, 2021 6 Equipment calibration: Place probe on the calibration standard surface so the coil is a minimum of twice the probe diameter from all notches and edges. Press the NULL key.

Hold the probe still until NULLING is complete. Press the ERASE key.

NOTE: Periodic erasing may be required.

7 While lifting the probe on and off the calibration standard, adjust ANGLE until a substantially horizontal, right to left, lift-off signal is achieved.

8 Repeatedly scan across the 0.020 inch deep notch in the calibration standard. Adjust H-GAIN and V-GAIN until a signal trace of 80% vertical deflection is obtained from the

0.020 inch notch.

9 Check lift-off and notch indication to ensure that the signals are similar to those shown in Figure 4.

10 Recalibration of the eddy current instrument and probe shall be accomplished when one of the following occurs:

a Immediately prior to a series of examinations/scans.

b After any interruption in system continuity such as power interruptions, instrument or probe change-outs, activation of new examination/scan setups, change in examination personnel, etc.

c At any instance of suspected system irregularity.

(2) RC - Inspection

(a) Left and right center wing upper forward corner fittings.

1 Scan the exterior of the vertical flange of the corner fitting common to the front beam web. Scan in the directions as shown. Pay particular attention for fatigue cracking initiating at the web attachment fasteners or from the flange inboard radius propagating spanwise above the web attachment fasteners. See Figure 1, Sheet 2, View B.

2 Torque the nine identified fasteners. Refer to applicable Hercules Structural Repair Manual. See Figure 1, Sheet 2, View B. When torquing the hi-tigue fasteners common to the corner fitting to check security/looseness do not use the allen-hex wrench to secure the pin and apply only the lower end torque value specified in the applicable Hercules Structural Repair Manual. Check for loose, pulled, or broken fasteners.

(b) Left and right center wing lower forward corner fittings.

1 Scan the interior surfaces of the corner fitting horizontal and vertical flanges common to the beam cap following the procedures listed in SMP 515-C, SP-163 or TO 1C-130A-36.

See Figure 1, Sheet 3, View C.

2 Torque the nine identified fasteners. Refer to applicable Hercules Structural Repair Manual. See Figure 1, Sheet 3, View C. When torquing the hi-tigue fasteners common to the corner fitting to check security/looseness do not use the allen-hex wrench to secure the pin and apply only the lower end torque value specified in the applicable Hercules Structural Repair Manual. Check for loose, pulled, or broken fasteners.

USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE STATEMENT ON THE TITLE PAGE OF THIS DOCUMENT. February 12, 2021 Revision 1, February 17, 2021 HERCULES Lockheed Martin Aeronautics CompanyMarietta, Georgia 30063

ALERT SERVICE BULLETIN A382-57-99

(c) Left and right outer wi ng forward corner fittings.

CAUTION: DO NOT REMOVE ANY OF THE 23 FASTENERS IDENTIFIED IN STEP 2.B.(2)(c)1 WITHOUT DEFUELING THE AFFECTED TANK. FAILURE TO DO SO COULD CAUSE AIRCRAFT DAMAGE.

NOTE: The 23 fasteners identified in Step 2.B.(2)(c)1 are common to the fuel tank.

1 Torque the 23 identified fasteners. Refer to applicable Hercules Structural Repair Manual. See Figure 2, Sheet 2, Views B and C. When torquing the hi-tigue fasteners common to the corner fitting to check security/looseness do not use the allen-hex wrench to secure the pin and apply only the lower end torque value specified in the applicable Hercules Structural Repair Manual. Check for loose, pulled, or broken fasteners.

(d) Left and right outer wing to center wing beam web joint spli ce angle fasteners 1 Record the existing torque values of the seventeen fasteners (left and right) in the provided table by noting the torque when the nuts first begin to turn. See Figure 3, Sheet 2, View B.

WARNING: TORQUE STRIPE AND SEALANT ARE FLAMMABLE AND TOXIC TO EYES, SKIN AND RESPIRATORY TRACT. SKIN AND EYE PROTECTION IS REQUIRED. GOOD GENERAL VENTILATION IS NORMALLY ADEQUATE. AVOID ALL SOURCES OF IGNITION.

2 Retorque the 17 (left and right) NAS6205/KFN542 bolts and nuts to 220 to 240 in-lbs.

The fasteners are to be torqued from the nut side holding the bolt from turning with a socket/wrench. Touch up sealant overcoat on bolts/nuts electrically bonded using MIL-PRF-81733 Class I, Grade A Sealant. Apply EC1252 Torque Stripe Paint to the bolt head and to the nut, after the sealant is tack free, in accordanceapplicable Hercules Maintenance Manual when completed. See Figure 3, Sheet 2, View B.

C. RC - Acceptance Criteria

(1) Mark and Report Damage:

(a) Report any damage detected by this inspection procedure, as well as the recorded torque values on the wing joint front beam web splice bolts to Lockheed Martin Aeronautics Company.

Provide the following information as applicable for damage detected and torque data:

1 Aircraft Serial Number 2 Aircraft Flight Hours 3 Location and description 4 Length, depth, and orientation of crack

(2) Aircraft with detected fatigue cracks in the center wing upp er or lower forward corner fittings should not be operated, contact Lockheed Martin Aeronautics for technical assistance. Sheared or missing fasteners are to be replaced before returning the aircraft to service.

USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE STATEMENT ON THE TITLE PAGE OF THIS DOCUMENT.

HERCULES Lockheed Martin Aeronautics CompanyMarietta, Georgia 30063

ALERT SERVICE BULLETIN A382-57-99February 12, 2021 Revision 1, February 17, 2021 D. RC - Restore aircraft to service:

(1) Clean inspection area and res tore any finishes removed. Reinstall any removed components and structure. Perform Ops Check following reinstallation of the wing leading edges per the Hercules Maintenance Manual. Remove maintenance and inspection equipment and supplies from the inspection area.

(2) Perform operation check of disturbed systems in accordance w ith applicable aircraft manuals.

Functional check flight is not required after inspection.

(3) The aircraft owner/operator shall make an appropriate entry in the aircraft log records upon compliance with this Service Bulletin.

(4) After the work has been completed on each affected aircraft, please complete and mail or fax (770-494-5682) a Notice of Service Bulletin Compliance; or notify Lockheed Martin Aeronautics Company of compliance with this Service Bulletin at website address: www.lockheedmartin.com/ams and log into Data Library.

(5) If all inspection results are acceptable and no further inspection is required, return aircraft to service.

For any inspection results out of limits, Lockheed Martin Aeronautics Company must review results to determine further actions. Submit all inspection results (passing and failing) to Lockheed Martin Aeronautics Company at hercules.support@lmco.com.

NOTE: If assistance is needed, contact your local Lockheed Martin Aeronautics Company representative, or the Customer Support Center in Marietta, Georgia, USA, as follows:

TELEPHONE: (770) 494-9131 FAX: (770) 494-9122 E-MAIL: hercules.support@lmco.com MAIL: Lockheed Martin Aeronautics Company 86 South Cobb Drive Dept. 3D3M00, Zone 0591 Marietta, GA 30063, USA

Page 12OCROpen in PDF

HERCULES Lockheed Martin Aeronautics Company Marietta, Georgia 30063

ALERT SERVICE BULLETIN CWS 220

UPPER FORWARD

CORNER FITTING FS 517.

VIEW A

VIEW LOOKING DOWN AND INBOARD AT THE CENTER WING, CWS 220 (LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE C

LOWER FORWARD

CORNER FITTING 1-5139-001 Inspection of Center Wing Upper and Lower Forward Corner Fittings Figure 1, Sheet 1 of 3 A382-57-99 USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE STATEMENT ON THE TITLE PAGE OF THIS DOCUMENT. February 12, 2021 Page 10 Revision 1, February 17, 2021

Pages 13–21 of 21