Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '175389df77320a8dae16f67c0c5234565f3fe9b7b20c18d85991514290699a05' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '175389df77320a8dae16f67c0c5234565f3fe9b7b20c18d85991514290699a05' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
PIAGGIO AERO INDUSTRIES S.p.A.
Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy Product Support Department Original Issue: January 13th, 2017
Service Bulletin: 80-0455 Rev. N. 0 Date: Page: 1 of 12 Mod. D007_ed_1 The EASA states mandatory compliance with inspections, modifications or technical directives and related time compliance by means of relevant Airworthiness Directives.
SERVICE BULLETIN (MANDATORY) N.: 80-0455 REV. 0 ATA CHAPTER: 27; 55 MODIFICATION N.: N/A TITLE: P180 AVANTI/AVANTI II – FORWARD WING FLAP, AILERON, MAIN WING INBOARD FLAP AND ELEVATOR ASSEMBLIES: INSPECTION OF
REVISION STATUS OF THE BULLETIN This Service Bulletin (SB) is at the original issue and consists of 12 pages.
1. PLANNING INFORMATION A. EFFECTIVITY Piaggio Aero Industries (PAI) P180 Avanti, Manufacturer’s Serial Number (MSN): 1004 thru 1104 .
Piaggio Aero Industries (PAI) P180 Avanti II Manufacturer’s Serial Number (MSN): 1002 , 1105 thru 1220 .
According to PAI manufacturing do cumentation, flight control surfaces serial numbers not affected by this Service Bullet in are listed in the following T able 1 and may be installed on aircraft above indicated (since delivery or after, as replacement parts).
NOTE 1: operators replacing any flight control surface(s) shall verify that the replacing unit is compliant with the requirement of this Service Bulletin.
PIAGGIO AERO INDUSTRIES S.p.A.
Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy Product Support Department Original Issue: January 13th, 2017
Service Bulletin: 80-0455 Rev. N. 0 Date: Page: 2 of 12 Mod. D007_ed_1
Table 1 – Flight control surfaces: not affected serial numbers.
P/N S/N LH FWD FLAP 80-131001-403 1212 thru 1216 1218 1221 thru 1227 1229 RH FWD FLAP 80-131001-404 1208 thru 1212 1214 thru 1223 LH INB. FLAP 80-652001-905 1087 thru 1091 1093 thru 1097 1099 1101 thru 1102 1105 1107 thru 1108 RH INB. FLAP 80-652001-907 1089 thru 1103 LH AILERON 80-302009-903 1212 thru 1220 1222 thru 1226 1228 RH AILERON 80-302010-903 1206 thru 1223 LH ELEVATOR 80-403001-905 1116 thru 1129 1131 thru 1132 RH ELEVATOR 80-403001-906 1114 1116 thru 1125 1127 thru 1128 1130
B. CONCURRENT REQUIREMENTS N/A
PIAGGIO AERO INDUSTRIES S.p.A.
Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy Product Support Department Original Issue: January 13th, 2017
Service Bulletin: 80-0455 Rev. N. 0 Date: Page: 3 of 12 Mod. D007_ed_1
C. REASON PAI performed a deep analysis of a substantial disbonding found between the RH elevator assembly upper/lower metal skin and the honeycomb core during a post -flight inspection.
Investigation identified that a nonconformity in the manufacturing process could be the root cause of the disbonding and that other flight control surfaces could be potentially involved.
This condition, if not detected and corrected, could affect the structural stiffness of the part, and downgrade the surface aerodynamic performance.
This MANDATORY SB provides instruc tions for repetitive inspections to verify the structural integrity of the affected assemblies and depending on findings outcome require the repair of the part(s) or the replacement of the affected flight control surface(s).
Aviation Authority action is also expected.
D. DESCRIPTION General This MANDATORY SB consists of the following:
Part A: identification of flight control surfaces serial numbers, according to aircraft’s logbook and check if the identified parts are included in the not-affected units list as per §1.A. Table 1 of this Service Bulletin.
If one or more surface(s) is (are) not listed in §1.A. Table 1, proceed with Part B or C of this Service Bulletin for this(these) surface(s), otherwise no other actions are required.
Part B: coin tapping test o n the affected assemblies (not replaced as per Part C of this Service Bulletin): LH and RH forward wing flap, LH and RH aileron , LH and RH main wing inboard flap and/or LH and RH elevator.
Findings review and report to PAI Product Support Dept. Depending on findings and actions taken, repetitive inspections are required. Repair instructions may be also applicable.
Part C: depending on actions taken in Part A or B, replacement instructions of the affected assembly.
E. COMPLIANCE This MANDATORY Service Bulletin shall be accomplished as follows:
Part A: within 50 flight hours (FH) from the issue date of this Service Bulletin.
Part A may be postponed to the next 200 FH inspection if the following condition is met: last coin tapping inspection (refer to NDTM Chap. 51-00-01) or
PIAGGIO AERO INDUSTRIES S.p.A.
Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy Product Support Department Original Issue: January 13th, 2017
Service Bulletin: 80-0455 Rev. N. 0 Date: Page: 4 of 12 Mod. D007_ed_1 last ultrasonic inspection (refer to. NDTM Chap. 51 -00-03) was performed , without any defect found, on the LH and RH forward wing flap, LH and RH aileron , LH and RH main wing inboard flap and LH and RH elevator during the previous 200 FH from the issue date of this Service Bulletin.
NOTE: it is not necessary to perform the following Part B for the flight contro ls surfaces replaced according to Part C of this Service Bulletin.
Part B: following aircraft logbook check result as per Part A , perform initial inspection within 50 flight hours (FH) from the issue date of this Service Bulletin or at the next 200 FH inspection since the last coin tapping inspection (ref er to NDTM Chap. 51-00-01) executed on the LH and RH forward wing flap, LH and RH aileron , LH and RH main wing inboard flap, LH and RH elevator, whichever occurs later.
[a] After initial inspection, in case of no damage found (local delamination), repeat the check after 200 FH.
[b] After 200 FH (as per [a]), in case of no damage found, repeat t he check after 200 FH.
[c] After 400 FH (since initial inspection), in case of no damage found, proceed with coin tapping test every 600 FH in accordance with AMM.
In case of damage found (local delamination) during inspection as per [a] or [b], proceed as follows:
in case of damage within the acceptable limits, repair must be performed in accordance with the Structural Repair Manual (SRM) report no. 180 - MAN-0250-01106;
in case of damage exceeding the acceptable limits , contact PAI for technical evaluation and further actions.
A repaired surface shall be inspected again after 50 FH since repair and proceed as follows:
[d] in case of no damage found, repeat the check after 200 FH;
[e] in case of no damage found during inspection [d], proceed with coin tapping test every 600 FH in accordance with AMM.
In case of damage found during inspection [d], contact immediately P AI for further actions.
In case of damage found during inspection scheduled every 600 FH (as per [e]), proceed as follows :
PIAGGIO AERO INDUSTRIES S.p.A.
Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy Product Support Department Original Issue: January 13th, 2017
Service Bulletin: 80-0455 Rev. N. 0 Date: Page: 5 of 12 Mod. D007_ed_1 in case of damage within the acceptable limits, repair must be performed in accordance with the Structural Repair Manual (SRM ) report no. 180 - MAN-0250-01106: for repetitive inspection refer to [e];
in case of damage exceeding the acceptable limits, contact immediately PAI.
Part C: following inspection findings and actions taken in accordance with Part B of this Service Bulletin and after contacting PAI P180 Customer Support to arrange the repair or replacement according to PAI Prod. Support Engineering evaluation.
NOTE 2: the adoption of the 600 FH coin tapping interval on all the flight control surfaces, in consequence of a “no damage found” condition as per Part B of this Service Bulletin, is considered a terminating action of this SB.
NOTE 3: should a new defect be found during a coin tapping test carried out at 50 FH or 200 FH after a repair, the replacement of the affected part combined with a “no damage found” condition on the other surfaces, and verified during all the previous coin tapping tests up to the 200 FH test, is considered a terminating action of this Service Bulletin.
In compliance with this Service Bulletin, please complete the attached Confirmation Slip and sent it back to Piaggio Aero Industries S.p.A. – Product Support Department.
F. APPROVAL The technical content o f this Service Bulletin has been approved under the Authority of DOA No EASA.21J.220.
G. MANPOWER This MANDATORY Service Bulletin may be accomplished in approximately:
Part A: 0.5 man-hour (MH).
Part B: 0.5 man-hour (MH) (each surface).
Part C: 4 man-hours (MH) for FWD wing flap replacement (single unit);
7 man-hours (MH) aileron replacement (single unit);
4 man-hours (MH) MW inboard flap replacement (single unit);
8 man-hours (MH) for elevator replacement (single unit).
Additional 10 MH (maximum) ma y be required for post -installation flight control surface adjustment/test.
NOTE: estimated man-hours provided above are not considering the drying/curing time required when a flight control surface repair is necessary and they do not include preparation a nd the time required to return the aircraft to a flyable status.
PIAGGIO AERO INDUSTRIES S.p.A.
Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy Product Support Department Original Issue: January 13th, 2017
Service Bulletin: 80-0455 Rev. N. 0 Date: Page: 6 of 12 Mod. D007_ed_1 H. TECHNICAL INFORMATION For questions concerning the technical content of this Service Bulletin, please contact:
Piaggio Aero Industries – P180 Customer Support Via Pionieri e Aviatori d’Italia, snc - 16154 Genoa, Italy Fax No. : (+ 39) 010 099 8400 E-mail: technicalsupport@piaggioaerospace.it I. MATERIAL – COST AND AVAILABILITY For pricing, availability and scheduling, please contact:
- for customers and operators in Europe, Asia and RoW e-mail: spareparts@piaggioaerospace.it telephone: (+39) 335 810 59 20
- for customers and operators in the Americas e-mail: spares@piaggioamerica.com telephone : (+1) 561 253 0104 fax: (+1) 561 683 5513 J. TOOLING – COST AND AVAILABILITY N/A K. WEIGHT AND BALANCE N/A L. ELECTRICAL LOAD DATA N/A M. REFERENCES
Document Title Document Number Chapter/Section Airplane Maintenance Manual (AMM) 9066 (Avanti) 180-MAN-0200-01105 (Avanti II) 12-00-00 20-00-00 27-10-00 27-30-00 27-50-00
PIAGGIO AERO INDUSTRIES S.p.A.
Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy Product Support Department Original Issue: January 13th, 2017
Service Bulletin: 80-0455 Rev. N. 0 Date: Page: 7 of 12 Mod. D007_ed_1 Illustrated Parts Catalog (IPC) 9065 (Avanti) 180-MAN-0100-01103 (Avanti II) 55-20-00 57-51-00 57-52-00 57-61-00 57-62-00 Structural Repair Manual (SRM) 180-MAN-0250-01106 51-70-90 Non-Destructive Test Manual (NDTM) 180-MAN-0300-01107 51-00-01 51-00-03 PAI Service Letter (SL) “Warranty Claim & Failure Report procedure” 80-0097 latest revision -
N. PUBLICATIONS AFFECTED Document Title Document Number Chapter/Section Chapter 05 - Time Limits and Scheduled Maintenance (Avanti) 180-MAN-0200-03832 Rev. C2 TR-213 to 05-20-00 Chapter 05 - Time Limits and Scheduled Maintenance (Avanti II) 180-MAN-0200-01491 Rev. D2 TR-240 to 05-20-00 Structural Repair Manual (SRM) 180-MAN-0250-01106 Rev. B0 TR-013 to 51-70-90
PIAGGIO AERO INDUSTRIES S.p.A.
Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy Product Support Department Original Issue: January 13th, 2017
Service Bulletin: 80-0455 Rev. N. 0 Date: Page: 8 of 12 Mod. D007_ed_1
2. ACCOMPLISHMENT INSTRUCTIONS NOTE 4: prepare the aircraft for maintenance in accordance with AMM Chap. 12-00-00.
NOTE 5: refer to AMM Chap. 20 -00-00 for airframe standard practices airframe, taking care to the health and safety precautions.
Part A
(1) In the aircraft’s logbook, verify if the serial numbers of the LH and RH forward wing flap, LH and RH aileron , LH and RH main wing inboard flap and LH and RH elevator are included in Table 1 (refer to Planning Information, §1.A of this Service Bulletin).
(2) If any of the serial number installed is not listed in Table 1, proceed with Part B or C of this Service Bulletin for this(these) surface(s) , otherwise proceed with the next step as no other actions are required.
(3) Complete the Part “A” of the attached Confirmation Slip and send it back to Piaggio Aero Industries S.p.A. – Product Support Department.
(4) Make an opportune entry in the airplane logbook to show compliance with P art “A” of this Service Bulletin.
Part B
(5) Ascertain that the following Temporary Revisions are included in the manuals as follows:
Temporary Revision no.213 to the Avanti Airplane Maintenance Manual Chapter 05 (Report no. 180-MAN-0200-03832, Rev. C2), Chapter 05-20-00.
Temporary Revision no.240 to the Avanti II Airplane Maintenance Manual Chapter 05 (Report no. 180-MAN-0200-01491, Rev. D2), Chapter 05-20-00.
Temporary Revisions no.013 to the Structural Repair Manual (Report no. 180 - MAN-0250-01106, Rev. B0), Chapter 51-70-90.
NOTE 6: Temporary Revisions will be incorporated into the related manual s at the next regular revision.
(6) Put a warning not e in the flight compartment to tell people not to move primary and secondary flight controls.
(7) In accordance with ND TM Chap. 51 -00-01, perform a n accurate coin tapping test on the following assemblies (FIGURE 1), making sure to carefully inspect both upper and lower skin of the flight control surface and check the entire bonding area:
PIAGGIO AERO INDUSTRIES S.p.A.
Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy Product Support Department Original Issue: January 13th, 2017
Service Bulletin: 80-0455 Rev. N. 0 Date: Page: 9 of 12 Mod. D007_ed_1 LH and RH forward wing flap ;
LH and RH aileron;
LH and RH main wing inboard flap;
LH and RH elevator.
(8) In case of no damage/defect found, proceed with repetitive inspections in accordance with §1.E. COMPLIANCE of this Service Bulletin.
(9) If a defect is found and is not within the acceptable l imits in accordance with NTDM Chap.
51-00-01 Table 3 Class A, contact PAI Product Support Department (refer to §1.H. ) for additional/following actions.
Fill out a Failure Report (refer to PAI SL no. 80 -0097 latest revision) with all the relevant information about the damage such as but not limited to location, dimension, width and report to PAI Product Support Department prior to proceed (refer to §1.H.).
(10) If a defect is found and is within the acceptable limits in accordance with NTDM Chap. 51 - 00-01 Table 3 ClassA, the affected control surface may be temporary repaired in accordance with SRM Chap. 51-70-90.
Fill out a Failure Report (refer to PAI SL no. 80 -0097 latest revision) with all the relevant information about the damage such as but not limited to loc ation, dimension, width and report to PAI Product Support Department (refer to §1.H.).
A repaired surface shall be inspected in accordance with §1.E. COMPLIANCE of this Service Bulletin.
Note that the repair is not a terminating action for repetitive inspe ction in accordance with the compliance (refer to §1.E.) of this Service Bulletin.
(11) Complete the Part “B” of the attached Confirmation Slip and send it back to Piaggio Aero Industries S.p.A. – Product Support Department.
(12) Make an opportune entry in the airp lane logbook to show compliance with Part “ B” of this Service Bulletin.
PIAGGIO AERO INDUSTRIES S.p.A.
Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy Product Support Department Original Issue: January 13th, 2017
Service Bulletin: 80-0455 Rev. N. 0 Date: Page: 10 of 12 Mod. D007_ed_1
FIGURE 1 - FLIGHT CONTROL SURFACES TO BE TESTED.
Part C
(13) Following accomplishment of Part A or Part B of this Service Bulletin, if any flight control surfaces replacement is required, proceed as follows:
(13a) forward wing flap(s) in accordance with AMM Chap. 27-50-00;
(13b) aileron(s) in accordance with AMM Chap. 27-10-00;
(13c) main wing inboard flap(s) in accordance with AMM Chap. 27-50-00;
(13d) elevator(s) in accordance with AMM Chap. 27-30-00.
(14) Complete the Part “C” of the attached Confirmation Slip and send it back to Piaggio Aero Industries S.p.A. – Product Support Department
(15) Make an opportune entry in the airplane logbook to show compli ance with Part “C” of this Service Bulletin.
ELEVATOR(S)
FWD WING FLAP(S)
AILERON(S)
MAIN WING INBOARD FLAP(S)
PIAGGIO AERO INDUSTRIES S.p.A.
Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy Product Support Department Original Issue: January 13th, 2017
Service Bulletin: 80-0455 Rev. N. 0 Date: Page: 11 of 12 Mod. D007_ed_1
3. MATERIAL INFORMATION A. LIST OF MODIFICATION KIT COMPONENTS Depending on findings as per Part A and/or B of this Service Bulletin, the following material may be required as spare part(s).
For additional information about surfaces spare P/N refer to the relevant IPC chapter(s).
Part/Number Specification Supplier Q.ty Type Designation SB 80-0455 Rev.0 Piaggio Aero Ind. - Kit Kit Service Bulletin 1 80-131001-403 Piaggio Aero Ind. 1 Assy LH FWD flap* 2 80-131001-404 Piaggio Aero Ind. 1 Assy RH FWD flap* 3 80-302009-803 Piaggio Aero Ind. 1 Assy LH aileron ** 4 80-302010-801 Piaggio Aero Ind. 1 Assy RH aileron ** 5 80-652001-805 Piaggio Aero Ind. 1 Assy LH MW inboard flap *** 6 80-652001-807 Piaggio Aero Ind. 1 Assy RH MW inboard flap *** 7 80-403004-801 Piaggio Aero Ind. 1 Assy LH elevator **** 8 80-403004-802 Piaggio Aero Ind. 1 Assy RH elevator ****
* IPC Chap. 57-52-00.
** IPC Chap. 57-61-00 and Chap. 57-62-00.
*** IPC Chap. 57-51-00.
**** IPC Chap. 55-20-00.
PIAGGIO AERO INDUSTRIES S.p.A.
Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy Product Support Department Original Issue: January 13th, 2017
Service Bulletin: 80-0455 Rev. N. 0 Date: Page: 12 of 12 Mod. D007_ed_1 B. LIST OF MATERIALS – OPERATOR SUPPLIED Additional material may be required depending on the task(s) accomplished: refer to AMM and/or SRM relevant procedures.
C. LIST OF TOOLS Specific too l(s) may be required depending on the task(s) accomplished: refer to AMM and/or SRM relevant procedures.
D. DISPOSAL OF REMOVED PART Return the removed part (s) to Piaggio Aero Ind. – Product Support Dept. (refer to § 1.H.), including a completed copy of the attached Confirmation Slip.
E. WARRANTY CREDIT PROGRAM N/A
4. WARNING - PROPRIETARY RIGHTS This bulletin contains proprietary information of Piaggio Aero Industries S.p.A. (PAI), which PAI provides in confidence and solely for the purposes of supporting PAI products and providing applicable information regarding the proper u se, maintenance, inspection, repair, servicing and parts application of PAI products. Neither this bulletin nor any information in it may be disclosed to others, or used for any other purpose, including, without limitation, to design, create, develop, repr oduce, manufacture or derive any design, part, product, material, process, modification, configuration change or repair, or obtain any government approval to do so. This material is the exclusive property of Piaggio Aero Industries S.p.A. and therefore shall not be reproduced, used or disclosed to others except as authorized by contract with Piaggio Aero Industries S.p.A. or without the written permission of Piaggio Aero Industries S.p.A..