Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'd6b78b4f95fb5150e39a2c32454fd795e27004156af388f2c142705d5a33ce95' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'd6b78b4f95fb5150e39a2c32454fd795e27004156af388f2c142705d5a33ce95' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Service Bulletin No: 34-010 Ref No: 178 Modification No: EC-21-0263, EC-22-0449 ATA Chapter: 34
SERVICE BULLETIN
PILATUS AIRCRAFT LTD, STANS, SWITZERLAND Service Bulletin No: 34-010 Date: Sep 22/22 Rev. No.1 Date: Nov 29/22 Page 1 of 28
NAVIGATION - WEATHER RADAR SYSTEM
REDUNDANT WEATHER RADAR WIRING MODIFICATION
1. Planning information A. Effectivity PC-24 aircraft MSN 231 thru MSN 252, MSN 254 and MSN 255.
This modification was incorporated on MSN 253, and MSN 256 thru MSN 260 during production.
This modification will be incorporated on MSN 261 and subsequent during production.
B. Concurrent requirements None.
C. Reason
(1) Problem The nose wiring harness includes electrical provisions for two weather radar options (RDR-2100 and RDR-7000). All of the wires in this nose wiring harness should be installed together in a braided shielding sleeve.
On some aircraft, it has been identified that certain wires (principally those not used in the weather radar option selected) were not installed in the braided shielding sleeve, they were instead installed outside of the braided shielding sleeve. The missing shielding extends over a length of approximately 0.5 meters. At the unshielded end the wires are capped and stowed and the other ends are connected to the modules that follow:
•A G M 1
•A G M 2
• DGI01
•A H R S 2 .
A Lightning Strike event could therefore affect the functionalities related to the above modules.
(2) Solution Disconnect and cap and stow the redundant wires that are installed outside of the braided shielding sleeve.
Service Bulletin No: 34-010 Date: Sep 22/22 Rev. No.1 Date: Nov 29/22 Page 2 of 28
SERVICE BULLETIN D. Description This Service Bulletin gives the data and instructions necessary to:
(1) Part 1 - Do the modification to disconnect and cap and stow the redundant wires of the RDR-2100 wiring harness.
NOTE: Part 1 of this Service Bulletin is only applicable to aircraft that have the RDR-7000 weather radar installed.
OR
(2) Part 2 - Do the modification to disconnect and cap and stow the redundant wires of the RDR-7000 wiring harness.
NOTE: Part 2 of this Service Bulletin is only applicable to aircraft that have the RDR-2100 weather radar installed.
Revision No.1 of this Service Bulletin is issued to include:
• Additional items in the modification kit
• Additional modification instructions to include the two additional items:
• Dummy ferrules (P/N 971.19.26.111)
• Shrink hose (P/N 917.99.88.607).
For Operators that have accomplished this Service Bulletin at the initial issue, make sure that the dummy ferrules (P/N 971.19.26.111) and the shrink hose (P/N 917.99.88.607) are installed.
Refer to the applicable Part of this Service Bulletin:
E. Compliance Mandatory, no later than the next 12 month inspection.
F. Approval The technical content of this document is approved under the authority of the DOA ref.
EASA.21J.357.
Pilatus advises Operators/Owners to check with their designated Airworthiness Authority for any changes, local regulations or sanctions that may affect the embodiment of this Service Bulletin.
• Part 1 - Para. 3.B.(4) OR -
• Part 2 - Para. 4.B.(6)
SERVICE BULLETIN Service Bulletin No: 34-010 Date: Sep 22/22 Rev. No.1 Date: Nov 29/22 Page 3 of 28 G. Copyright and legal statement © Pilatus Aircraft Ltd. This document contains proprietary information that is protected by copyright. All rights are reserved. No part of this document may be copied, reproduced or translated to other languages without the prior written consent of Pilatus Aircraft Ltd.
In connection with the use of this document, Pilatus does not provide any express or implied warranties and expressly disclaims any warranty of merchantability or fitness for a particular purpose. This document contains trade secrets, confidential and/or proprietary information of Pilatus and technical data subject to export control laws and regulations, including the U.S.
Export Administration Regulations (EAR). Disclosure or distribution of this document contrary to the EAR, and other laws and regulations, is strictly forbidden. The above restrictions may apply to data on all pages of this document.
H. Manpower Accomplishment instructions - Part 1 Accomplishment instructions - Part 2 I. Weight and balance
(1) Weight Change:
+0.267 lb (+0,121 kg).
(2) Moment Change:
+11.572 lb*in (+0,133 kg*m).
Description Man-Hours Preparation 0.25 Modification 2.00 Test 4.00 Requirements after job completion 0.50 TOTAL MAN-HOURS 6.75 Description Man-Hours Preparation 0.25 Modification 2.50 Test 6.00 Requirements after job completion 0.50 TOTAL MAN-HOURS 9.25
Service Bulletin No: 34-010 Date: Sep 22/22 Rev. No.1 Date: Nov 29/22 Page 4 of 28
SERVICE BULLETIN J. Electrical load change data Not changed.
K. Software Not changed.
L. References Aircraft Maintenance Manual (AMM):
M. Publications affected Wiring Diagram Manual (WDM).
N. Interchangeability of parts Not applicable.
PC24-A-A00-50-0000-00A-070A-A PC24-A-A06-40-0000-00A-040A-A PC24-A-E20-10-0003-00A-913A-A PC24-A-E20-10-0004-00A-913A-A PC24-A-E20-20-0001-00A-040A-A PC24-A-E24-00-0000-00A-913A-A PC24-A-E24-97-0002-00A-320A-A PC24-A-E24-97-0007-00A-320A-A PC24-A-E42-10-0001-02A-520A-A PC24-A-E42-10-0001-02A-720A-A.
SERVICE BULLETIN Service Bulletin No: 34-010 Date: Sep 22/22 Rev. No.1 Date: Nov 29/22 Page 5 of 28
2. Material information Operators that require additional information and/or Service Bulletin material can contact their authorized Pilatus Service Center, or Pilatus Customer Support on www.pilatus-aircraft.com contact us.
NOTE: Part numbers given in this Service Bulletin are correct at the time of approval. Pilatus Aircraft Ltd reserves the right to change the part numbers as necessary. Part numbers of items delivered with a kit are correct when the kit is dispatched. This could lead to differences between those part numbers quoted in a Service Bulletin and a kit if parts are superseded.
Operators are requested to check the Illustrated Parts Data (IPD) for delivered parts that differ from those listed in the Service Bulletin materials kit list.
Operators are requested to advise Pilatus Aircraft Ltd of the Manufacturers Serial Number (MSN), the flying hours and landings of aircraft that are allocated for this Service Bulletin.
A. Material - Price and availability B. Warranty Credit will be issued for parts and labour for all affected aircraft on approval of a warranty claim, provided the work is accomplished by an authorized Service Center within the compliance time given in Section 1.E on Page 2 of this Service Bulletin.
C. Material necessary for each aircraft
(1) Material to order from Pilatus Modification kit number 500.50.24.042 Modification kit number Price Availability
500.50.24.042 Contact as abo ve Approximately 2 weeks New part No. Description Old part No. Qty Disp.
code Fig Item
917.99.88.601 Shrink Hose, Black 3/64 - 0,50 M N- -
917.99.88.604 Shrink Hose, Black 1/8 - 0,16 M N- -
917.99.88.605 Shrink Hose, Black 3/16 0,04 M N- -
971.19.38.605 Heat-shrinkable, ES Cap No. 1 -1 0 N - -
917.99.88.607 Shrink Ho se, Black, 3/8 - 0,02 M N- - Disposition Codes: D - Discard / N - New / R - Return to Pilatus / E - Exchange part
Service Bulletin No: 34-010 Date: Sep 22/22 Rev. No.1 Date: Nov 29/22 Page 6 of 28
SERVICE BULLETIN NOTE: The quantity of some items in this modification kit will include spares depending on the accomplishment of Part 1 or Part 2 of this Service Bulletin.
D. Operator supplied materials NOTE: To identify the materials used in this procedure, look in the Consumable materials list.
Refer to AMM PC24-A-A00-50-0000-00A-070A-A.
E. Material necessary for each spare Not applicable.
F. Re-identified parts Not applicable.
971.19.26.111 Ferrule, Blank, Dummy - 1 N - -
971.32.51.210 Band, clamp, ST, 6 mm (PB1021) -3 N - -
971.75.16.829 Contact, Socket, Crimp, AWG22-26 (A096-1P3, A096-2P2, A096-6P2, A096-7P3, A096-7P4) -1 3 N - -
971.75.17.911 Contact, Pin, #22 (PB1012, PB1021) -1 3 N - -
971.75.18.921 Plug, Seal, Size 22 (Filler Pin) (PB1012, PB1021) -1 3 N - - Material No. Description Qty Remarks P09-005 Cable tie (MS3367-5-9, PA66) AR P/N 971.32.51.105 P09-008 Cable tie (MS3367-4-9, PA66) AR P/N 971.32.51.104 P09-014 Cable tie (MS3397-1-9, PA66) AR P/N 971.32.51.101 P09-064 Tape (Silic one, Red) AR P/N 917.40.60.311 New part No. Description Old part No. Qty Disp.
code Fig Item Disposition Codes: D - Discard / N - New / R - Return to Pilatus / E - Exchange part
SERVICE BULLETIN Service Bulletin No: 34-010 Date: Sep 22/22 Rev. No.1 Date: Nov 29/22 Page 7 of 28 G. Tools and equipment NOTE: Refer also to the referenced AMM procedures as applicable.
Tools and equipment Recommended Pilatus part Tool kit, electrician Local supply Insert and extract tool (as applicable) Local supply Heat gun Local supply Hand banding tool (Tie-dex A40199) OR Banding tool DBS-2100 (M81306/1A) P/N 990.00.02.031 Local supply
Service Bulletin No: 34-010 Date: Sep 22/22 Rev. No.1 Date: Nov 29/22 Page 8 of 28
SERVICE BULLETIN
3. Accomplishment instructions - Part 1 Only for Aircraft with the RDR-7000 Weather Radar system installed.
WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ELECTRICAL SYSTEM OR A SYSTEM THAT USES THE ELECTRICAL POWER. MAKE SURE THAT IT IS SAFE BEFORE YOU
APPLY ELECTRICAL POWER TO THE AIRCRAFT OR ENERGIZE THE AIRCRAFT ELECTRICAL SYSTEMS. THE ELECTRICAL POWER CAN CAUSE INJURY TO OR KILL PERSONNEL AND CAUSE DAMAGE TO EQUIPMENT.
A. Preparation
(1) Obey the safe maintenance practices as necessary. Refer to AMM PC24-A-E20-10-0003- 00A-913A-A.
(2) De-energize the aircraft electrical system. Refer to AMM PC24-A-E24-00-0000-00A-913A- A.
(3) Put a ‘ DO NOT CONNECT ELECTRICAL POWER’ sign on the:
• Overhead control panel
• External power connection.
(4) Open/Remove the access panels/fairings in Table 1. Refer to AMM PC24-A-A06-40-0000- 00A-040A-A.
Table 1: Access panels/fairings
(5) Remove the Modular Avionics Unit (MAU) 1 cover. Refer to AMM PC24-A-E42-10-0001- 02A-520A-A.
Panel number Panel name 212AL Nose door, LH 212AR Nose door, RH
SERVICE BULLETIN Service Bulletin No: 34-010 Date: Sep 22/22 Rev. No.1 Date: Nov 29/22 Page 9 of 28 B. Modification NOTE: When you cap and stow wires/shields, unless otherwise stated, use shrink hose P/N
917.99.88.601 to isolate the wires, shrink Hose P/N 917.99.88.604 to isolate the shields, heat shrinkable caps (P/N 971.19.38.605) to cap all of the wires/shields together.
NOTE: When you attach cables/wires in the aircraft, use tape (Silicone red, fiberglass) (Material No. P09-064) and the applicable cable ties (Material No. P09-005/P09-008/ P09-014), as necessary.
(1) Disconnect the electrical connectors listed below:
• Electrical connector PB1021 from the electrical receptacle JB1021
• Electrical connector A096-2P2 from AGM 1 on the MAU 1
• Electrical connector A096-6P2 from DGIO 1 on the MAU 1
• Electrical connector A096-7P4 from DGIO 1 on the MAU 1.
(2) Disconnect/Open the backshell on each of the electrical connectors listed above.
(3) Use the applicable insert/extract tool and disconnect the wires from the electrical connector PB1021. Refer to Figure 1, and Figure 2 - Hook-Up Chart 1 (Line 1 thru 4):
(a) Disconnect the blue wire of cable SM 4B22 from terminal 17 of the electrical connector PB1021.
(b) Disconnect the trace wire of cable SM4B22 from terminal 18 of the electrical connector PB1021.
(c) Disconnect the shield wire of cable SM4B22 from terminal 19 of the electrical connector PB1021.
(d) Install a new contact (P/N 971.75.17.9 11) and a seal plug (filler pin) (P/N
971.75.18.921) in each of the terminals where you disconnected the wires.
(e) Remove (and discard) the band clamp and disconnect the cable shield of cable SM4B22 from the backshell of the electrical connector PB1021.
(f) Use a new band clamp (P/N 971.32.51.210) and connect all of the remaining cable shield(s)/shield wire(s)) to the backshell of the electrical connector PB1021.
(g) Connect the backshell to the electrical connector PB1021.
(h) Cap the wires that you disconnected and stow them on the wiring harness near the electrical connector PB1021.
(4) Use the applicable insert/extract tool and disconnect the wires from the electrical connector A096-2P2. Refer to Figure 1, and Figure 2 - Hook-Up Chart 1 (Line 5 thru 8):
(a) Disconnect the blue wire of cable SM4C 22 from terminal 19 of the electrical connector A096-2P2.
(b) Disconnect the wire SM4G22 from terminal 20 of the electrical connector A096-2P2.
Service Bulletin No: 34-010 Date: Sep 22/22 Rev. No.1 Date: Nov 29/22 Page 10 of 28
SERVICE BULLETIN
(c) Disconnect the wire SM4H22 from terminal 21 of the electrical connector A096-2P2.
(d) Disconnect the cable shield of cable SM4C 22 from the backshell of the electrical connector A096-2P2.
(e) Install a blind contact (P/N 971.75.16. 829) in each of the terminals where you disconnected the wires.
(f) Install a dummy ferrule (P/N 971.19.26.111) in the empty hole in the backshell of the electrical connector A096-2P2.
(g) Close the backshe ll of the electrical connector A096-2P2.
(h) Cap the wires that you disconnected and stow them on the wiring harness near the electrical connector A096-2P2.
1 Use shrink hose (P/N 917.99.88.607) on the ferrule and solder shield.
(5) Use the applicable insert/extract tool an d disconnect the wires from the electrical connector A096-6P2. Refer to Figure 1, and Figure 2 - Hook-Up Chart 1 (Line 9 thru 11):
(a) Disconnect the red wire of cable SM6A24 from terminal 22 of the electrical connector A096-6P2.
(b) Disconnect the blue wire of cable SM6A24 from terminal 23 of the electrical connector A096-6P2.
(c) Disconnect the cable shield of cable SM6A 24 from the backshell of the electrical connector A096-6P2.
(d) Install a blind contact (P/N 971.75.16. 829) in each of the terminals where you disconnected the wires.
(e) Close the backshe ll of the electrical connector A096-6P2.
(f) Cap the wires that you disconnected and stow them on the wiring harness near the electrical connectorA096-6P2.
(6) Use the applicable insert/extract tool an d disconnect the wires from the electrical connector A096-7P4. Refer to Figure 1, and Figure 2 - Hook-Up Chart 1 (Line 12 thru 14):
(a) Disconnect the red wire of cable SM7A24 from terminal 22 of the electrical connector A096-7P4.
(b) Disconnect the blue wire of cable SM7A24 from terminal 23 of the electrical connector A096-7P4.
(c) Disconnect the cable shield of cable SM7A 24 from the backshell of the electrical connector A096-7P4.
(d) Install a blind contact (P/N 971.75.16. 829) in each of the terminals where you disconnected the wires.
(e) Close the backshe ll of the electrical connector A096-7P4.
SERVICE BULLETIN Service Bulletin No: 34-010 Date: Sep 22/22 Rev. No.1 Date: Nov 29/22 Page 11 of 28
(f) Cap the wires that you disconnected and stow them on the wiring harness near the electrical connector A096-7P4.
(7) Connect the electrical connectors listed below:
• Electrical connector PB1021 to the electrical receptacle JB1021
• Electrical connector A096-2P2 to AGM 1 on the MAU 1
• Electrical connector A096-6P2 to DGIO 1 on the MAU 1
• Electrical connector A096-7P4 to DGIO 1 on the MAU 1.
• Torque the jack screws of the electrical connectors A096-2P2 / A096-6P2 / A096-7P4 to between 40 and 44 in-lb (4,5 and 5,0 Nm) plus the rundown torque. Refer to AMM PC24-A-E20-20-0001-00A-040A-A.
C. Test
(1) Remove the ‘ DO NOT CONNECT ELECTRICAL POWER’ sign from the:
• Overhead control panel
• External power connection.
(2) Do the Connection PB/JB1021 - Operation test. Refer to AMM PC24-A-E24-97-0007-00A- 320A-A.
Service Bulletin No: 34-010 Date: Sep 22/22 Rev. No.1 Date: Nov 29/22 Page 12 of 28
SERVICE BULLETIN D. Requirements after job completion
(1) De-energize the aircraft electrical system. Refer to AMM PC24-A-E24-00-0000-00A-913A- A.
(2) Install the MAU 1 cover. Refer to AMM PC24-A-E42-10-0001-02A-720A-A.
(3) Remove all the equipment, tools and materials from the work area. Make sure that the work area is clean.
(4) Close/Install the access panels/fairings in Table 2. Refer to AMM PC24-A-A06-40-0000- 00A-040A-A.
Table 2: Access panels/fairings
(5) Do the Closeup practices. Refer to AMM PC24-A-E20-10-0004-00A-913A-A.
E. Documentation
(1) Make an entry in the Aircraft Logbook to record the incorporation of Part 1 of this Service Bulletin.
(2) Make sure that the Aircraft Logbook shows any new Pilatus Part Number(s) and/or Serial Number(s), as applicable.
(3) Inform CAMP of the incorporation of Part 1 of this Service Bulletin and any new Pilatus Part Number(s) and/or Serial Number(s), as applicable. Send the completed feedback sheet to: fax@campsystems.com Panel number Panel name 212AL Nose door, LH 212AR Nose door, RH