Service bulletin · Pratt & Whitney

Revision 1U.S. DOT/FAA - Service Bulletin - PW4G-112-72-309 R1 · 38 pages · 547 KB

© Pratt & Whitney. Filed by the FAA in regulations.gov docket FAA-2010-1095; AD 2011-14-07, 2012-13-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2010-1095 (document 0004) · AD 2011-14-07, AD 2012-13-02

Manufacturer
Pratt & Whitney
Type
Service Bulletin
Number
PW4G-112-72-309
Latest revision known
PW4G-112-72-309, Revision 1, dated July 1, 2010

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 2

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 1 proposed AD.

Text · 38Partly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers. © Pratt & Whitney. Filed by the FAA in regulations.gov docket FAA-2010-1095; AD 2011-14-07, 2012-13-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '7b65c2101f67689ac147444475c078570c5f182617a74334853ecb4cd236987d'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SER VICE

BULLETIN

REVISION NOTICE ENGINE — DISK, 15TH ST AGE HIGH

PRESSURE

COMPRESSOR (HPC) —

REPETITIVE

BORESCOPE

INSPECTION OR EDDY

CURRENT

INSPECTION (ECI) FOR CRACKS IN THE FRONT RAIL OF THE OUTER RIM T urbojet Engine Service Bulletin No.

PW4G-1 12-72-309 Revision No.

1 dated July 1, 2010.

R e v i s i o n H i s t o r y Original Issue November 10, 2009 Revision 1 dated July 1, 2010 R e a s o n f o r t h e R e v i s i o n T o update the number of cracks found in service engines to date from 41 to

53.

T o revise the compliance to include a drawdown plan and limit disk life to 12,000 cycles.

T o attach NDIP-1014, Revision B.

T o remove “There is no terminating action for this repetitive inspection at this time.”.

T o remove “NOTE:

Engine Serial No.

P777032 and P777038 were inspected and meet the initial inspection requirement of this Service Bulletin” from the Ef fectivity section.

E f f e c t o f R e v i s i o n o n P r i o r C o m p l i a n c e None.

T h i s i s a C o m p l e t e R e v i s i o n ( N o t A p p l i c a b l e t o t h e S G M L v e r s i o n ) The contents are in accordance with the list of ef fective pages.

All pages have the current revision number .

T echnical changes are marked with black bars.

N o n - D e s t r u c t i v e I n s p e c t i o n P r o c e d u r e s NDIP-1014, Revision B dated June 7, 2010 is attached.

Please discard the previously issued copy .

M O D E L A P P L I C A T I O N PW4074, PW4077 B U L L E T I N I S S U E S E Q U E N C E PW4G-1 12 Series 72-309 P a g e R e v i s i o n N o .

D a t e 1 thru 18 1 July 1/10 A copy of this Revision Notice and any future revision notices must be filed as a permanent record with your copy of the subject bulletin.

P & W D i s t r i b u t i o n C o d e 2641, 2648 PW4G-1 12-72-309 Page 1 of 1 Printed in United States of America

SER VICE

BULLETIN ENGINE — DISK, 15TH ST AGE HIGH

PRESSURE

COMPRESSOR (HPC) —

REPETITIVE

BORESCOPE

INSPECTION OR EDDY

CURRENT

INSPECTION (ECI) FOR CRACKS IN THE FRONT RAIL OF THE OUTER RIM M O D E L A P P L I C A T I O N PW4074, PW4077 B U L L E T I N I S S U E S E Q U E N C E PW4G-1 12 Series 72-309 A T A N U M B E R 72-35-00 U T C / P & W P R O P R I E T A R Y I N F O R M A T I O N This document is the property of United T echnologies Corporation — Pratt & Whitney (UTC/P&W).

Y ou may not possess, use, copy or disclose this document or any information in it, for any purpose, including without limitation to design, manufacture, or repair parts, or obtain F AA or other government approval to do so, without UTC/P&W’ s express written permission.

Neither receipt nor possession of this document alone, from any source, constitutes such permission.

Possession, use, copying or disclosure by anyone without UTC/P&W’ s express written permission is not authorized and may result in criminal and/or civil liability .

C o m p l i a n c e C a t e g o r y 3 P & W D i s t r i b u t i o n C o d e 2641, 2648 l November 10/09 PW4G-1 12-72-309

REVISION NO.

1 - July 1/10 Page 1 of 18 Printed in United States of America

S u m m a r y The purpose of this Service Bulletin is to provide instructions to do a repetitive borescope inspection or Eddy Current Inspection (ECI) of the 15th stage High Pressure Compressor (HPC) disk for cracks.

Inspection of 15th stage disks of in service engines found 53 cracks in the front rail of the blade loading and/or locking slots on the outer rim.

Metallurgical examination of the 15th stage HPC disk cracks revealed that the initiation was the result of Thermal Mechanical Fatigue (TMF).

Remove from service any disk that has a crack.

The ECI is in NDIP-1014 Revision B and is provided in the Appendix section of this Service Bulletin.

P l a n n i n g I n f o r m a t i o n E f f e c t i v i t y D a t a E n g i n e M o d e l s A p p l i c a b l e PW4074, PW4077 Engine Serial No.

— All engines that have 15th Stage HPC Disk, PN 55H615 installed.

C o n c u r r e n t R e q u i r e m e n t s There are no concurrent requirements.

R e a s o n

1.

Problem:

Inspection of 15th stage disks of in service engines found 53 cracks in the front rail of the blade loading and/or locking slots on the outer rim.

2.

Cause:

Metallurgical examination of the cracks revealed that the initiation was the result of TMF .

3.

Solution:

Do a repetitive borescope inspection or ECI of the 15th stage HPC disk.

D e s c r i p t i o n Do a borescope inspection or ECI of the 15th stage HPC disk.

C o m p l i a n c e Category 3 15th stage HPC Disks, PN 55H615 with 12,000 part cycles since new must be removed from service.

For engines with disks that have accumulated less than or equal to 9,865 cycles when this Service Bulletin is released, the engine must be removed when the 15th disk accumulates 12,000 cycles since new .

For engines with disks that have accumulated more than 9,865 cycles when this Service Bulletin is released, the engine must be removed by 2,135 cycles after Service Bulletin release.

If a disk exceeds 12,000 cycles since new before the engine is removed, perform an inspection of the disk before 12,000 cycles, and repeat the inspection before 1,200 additional cycles until the disk is removed within 2,135 cycles, or a crack is found.

The repeat inspection is waived if the previous inspection was accomplished with ECI.

N O T E :

FPI can be done as specified in Reference 4, CIR Manual, Chapter/Section 72-35-92, Inspection/Check-02 or Reference 6, Service Bulletin No.

PW4G-1 12-72-243.

ECI can be done as specified in Reference 7, NDIP-1014 Revision B .

NDIP-1014 Revision B is provided in the Appendix section of this Service Bulletin.

l November 10/09 PW4G-1 12-72-309

REVISION NO.

1 - July 1/10 Page 2

UTC/P&W

PROPRIET AR Y

INFORMA TION Subject to the restrictions on the cover or first page.

If a crack is suspected by borescope inspection, but cannot be visually confirmed, do an ECI within 5 cycles.

A p p r o v a l D a t a The times between inspections specified in Compliance and the inspection procedures specified in the Accomplishment Instructions agree with the applicable Federal A viation Regulations and are F AA-Approved for the engine model(s) given.

M a n p o w e r The estimate of man-hours of labor directly necessary to do the intent of this Service Bulletin are as follows:

F o r E n g i n e s I n s t a l l e d O n T h e A i r c r a f t

1.

Open and Close Cowl Doors .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

0.5

2.

Necessary to do the Inspection .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

2.5

3.

T otal Necessary Man-hours .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

3.0 F o r E n g i n e s R e m o v e d F r o m T h e A i r c r a f t

1.

Necessary to do the Inspection .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

2.5

2.

T otal Necessary Man-hours .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

2.5 W e i g h t D a t a No Change.

E l e c t r i c a l L o a d D a t a Not Applicable.

S o f t w a r e A c c o m p l i s h m e n t S u m m a r y Not Applicable.

R e f e r e n c e s

1.

T urbojet Engine Standard Practices Manual, Part No.

585005.

2.

PW4074, PW4077 T urbofan Engines, Illustrated Parts Catalog, Part No.

51A346.

3.

PW4074, PW4077 T urbofan Engines, Engine Manual, Part No.

51A345.

4.

PW4000 Series 1 12 Inch PW4074, PW4077, PW4077D, PW4084D, PW4090, PW4098 T urbofan Engines, Engine Cleaning, Inspection And Repair (CIR) Manual, Part No.

51A750.

5.

Boeing 777 Aircraft Maintenance Manual.

6.

Service Bulletin No.

PW4G-1 12-72-243;

Engine — Disk, 15Th Stage High Pressure Compressor (HPC) — Inspection For Cracks In The Blade Slot Loading And Locking Locations And Knife Edge Seal Location.

Issue Sequence 72-243, PW4G-1 12 Series.

7.

Non-Destructive Inspection Procedure NDIP-1014, Revision B , — PW4074 / PW4077 15th Stage HPC Disk Front Rail Blade Loading Slot and Locking Areas Eddy Current Inspections (Assembled/Aircraft Installed).

l November 10/09 PW4G-1 12-72-309

REVISION NO.

1 - July 1/10 Page 3

UTC/P&W

PROPRIET AR Y

INFORMA TION Subject to the restrictions on the cover or first page.

P u b l i c a t i o n s C h a n g e d Not Applicable.

I n t e r c h a n g e a b i l i t y Not Applicable.

I n f o r m a t i o n i n t h e A p p e n d i x Alternate Accomplishment Instructions (No) Progression Charts (No) Added Data (Y es) Revision to T able of Limits (No) Inspection Procedures (No) l November 10/09 PW4G-1 12-72-309

REVISION NO.

1 - July 1/10 Page 4

UTC/P&W

PROPRIET AR Y

INFORMA TION Subject to the restrictions on the cover or first page.

M a t e r i a l I n f o r m a t i o n M a t e r i a l — C o s t a n d A v a i l a b i l i t y

1.

The estimated price to do the Borescope Inspection procedure in this Service Bulletin is $12.90 for a new borescope plug key washer .

2.

There is no kit provided to do this Service Bulletin.

3.

Part availability information is provided in material data Instructions — Disposition.

I n d u s t r y S u p p o r t P r o g r a m Not Applicable.

T h e m a t e r i a l d a t a t h a t f o l l o w s i s f o r e a c h e n g i n e .

N O T E :

It is possible to use the Chapter/Section and Figure/Item reference number shown below the old part number to find the part in the Illustrated Parts Catalog.

C A U T I O N :

THE

FOLLOWING MA TERIAL DA T A T

ABLE(S) ARE

ORGANIZED BY

ILLUSTRA TED P AR TS CA T ALOG.

ALL P AR TS IN THE T

ABLE(S) MA Y OR MA Y NOT BE

APPLICABLE T O ALL THE ENGINE MODELS SHOWN IN THE T ABLE HEADING.

YOU MUST REFER T O THE

APPROPRIA TE

ILLUSTRA TED P AR TS CA T ALOG FOR ENGINE MODEL

APPLICABILITY USING THE OLD P AR T NUMBER (PN) AND CA T ALOG

SEQUENCE NUMBER.

F AILURE T O INST ALL THE P AR T(S) IN THE

CORRECT ENGINE MODEL MA Y RESUL T IN A

CONFIGURA TION THA T IS NOT F AA APPROVED.

T h e m a t e r i a l d a t a t h a t f o l l o w s i s f o r e a c h e n g i n e .

F o r P W 4 0 7 4 , P W 4 0 7 7 E n g i n e s :

New PN Qty Estimate of Unit Price ($) Keyword Old PN Instructions — Disposition 1 DISK — HPC, 15STG 55H615 (72-35-00-1-210)

(4)(X) 58H216 1

12.90 KEY W ASHER 58H216 (72-35-00-25-20 A) (E) M o d i fi c a t i o n a n d S p a r e s I n f o r m a t i o n Estimated part prices are provided when they are available at time of publication.

The Estimate of Unit Price is only for planning purposes and does not constitute a firm quotation.

An asterisk (*) is shown where part pricing information was unavailable.

In either case, contact Pratt & Whitney Spares Management & Logistics for firm quotations.

Parts Modification Conditions

(4) Do an inspection as specified in the Accomplishment Instructions.

Spare Parts A vailability (E) The part is an expendable item necessary to do this bulletin.

(X) See Reference 2, Illustrated Parts Catalog for applicable replacement parts.

Cleaning, Inspection and Repair Information Not Applicable.

l November 10/09 PW4G-1 12-72-309

REVISION NO.

1 - July 1/10 Page 5

UTC/P&W

PROPRIET AR Y

INFORMA TION Subject to the restrictions on the cover or first page.

V endor Services or Special Components/Materials Not Applicable.

M a t e r i a l D a t a f o r E a c h S p a r e E n g i n e The material for each spare engine is as stated in the preceding material information section.

R e i d e n t i fi e d P a r t s Not Applicable.

N e c e s s a r y T o o l s N e w S u p p o r t E q u i p m e n t t h a t i s n e c e s s a r y T ool No.

Name Standard Flexible borescope with articulating tip and 150 watt minimum light source.

(A 4mm flexible borescope is recommended;

however , other size flexible borescopes can be used if the viewing quality is the same or better than a 4mm flexible borescope.)

PW A 88247 Rotator (Or equivalent as specified in Reference 5, Aircraft Maintenance Manual) O t h e r M a t e r i a l I n f o r m a t i o n D a t a Not Applicable.

l November 10/09 PW4G-1 12-72-309

REVISION NO.

1 - July 1/10 Page 6

UTC/P&W

PROPRIET AR Y

INFORMA TION Subject to the restrictions on the cover or first page.

A c c o m p l i s h m e n t I n s t r u c t i o n s N O T E :

Service Bulletin incorporation on engines installed on aircraft may be desirable and should be individually evaluated.

F O R E N G I N E S I N S T A L L E D O N T H E A I R C R A F T

1.

Do an inspection of the 15th Stage Disk, PN 55H615 by one of the procedures that follow .

See Figure

1.

A.

Do an ECI of the disk as specified in Reference 7, NDIP-1014 Revision B .

NDIP-1014 Revision B is provided in the Appendix section of this Service Bulletin.

Or B.

Do a borescope inspection of the disk as follows:

(1) Open fan cowl doors and thrust reversers as specified in Reference 5, Aircraft Maintenance Manual, Chapter/Section 71-1 1-04 and 78-31-00.

N O T E :

The variable vanes must be fully open when the engine is shutdown.

If the vanes are not open use a large wrench or a crows foot wrench to rotate the bellcrank on the stator vane actuator to the fully open position.

(2) Access the disk through the AP-7 (borescope) port as specified in the Reference 5, Aircraft Maintenance Manual, Chapter/Section 72-00-00.

See Figure 2, Sheets 1 and

2.

(3) Insert the borescope into the AP-7 port to view the front rail of the disk.

See Figure 2, Sheets 3 and

4.

(4) Remove the gearbox crank pad cover and use a PW A 88247 Rotator or equivalent to rotate the rotor at the gearbox crank pad.

(5) Rotate the rotor until the first blade lock is seen.

Use the blade lock locations for angular reference.

See Figure

3.

(6) Rotate the rotor in the same direction past two additional blades.

If another blade lock is found just past the second blade then the current location is a lock and loading location.

The loading slot (which is not visible) is between the two blade locks.

See Figure

3.

(7) Do an inspection of the front rail in the areas adjacent to the locking slots and the area between the two locking slots for cracks.

Cracks typically run in the radially inboard direction from the outer rim of the rail.

See Figure 2, Sheet

4.

(8) If another blade lock is not found just past the second blade, then the present location is a blade lock only .

See Figure

3.

(9) Do an inspection of the front rail for cracks adjacent to the blade lock.

Cracks typically run in the radially inboard direction from the outer rim of the rail.

See Figure 2, Sheet

4.

(10) Rotate the rotor until the next blade lock is visible and do the inspection of the two blade lock and loading areas and four blade lock areas.

N O T E :

Rotating the crack pad 360 degrees represents more than 360 degrees of rotor rotation.

(1

1) The inspection criteria is as follows:

l November 10/09 PW4G-1 12-72-309

REVISION NO.

1 - July 1/10 Page 7

UTC/P&W

PROPRIET AR Y

INFORMA TION Subject to the restrictions on the cover or first page.

(a) If the disk does not have a crack, the disk is acceptable.

(b) If the disk does have a crack, replace the disk.

(c) If a crack is suspected, but cannot be visually confirmed, do an ECI within 5 cycles, as specified in Reference 7, NDIP-1014 Revision B .

NDIP-1014 Revision B is provided in the Appendix section of this Service Bulletin.

(12) Remove the borescope and install the AP-7 borescope plug and new Key W asher , PN 58H216 as specified in Reference 5, Aircraft Maintenance Manual, Chapter/Section 72-00-00.

(13) Remove the PW A 88247 Rotator or equivalent and install the gearbox crank pad cover .

(14) Close fan cowl doors and thrust reversers as specified in Reference 5, Aircraft Maintenance Manual, Chapter/Section 71-1 1-04 and 78-31-00.

(15) Record the inspection results.

For all disks that have cracks:

operators are requested to provide the results of the inspection to their local Pratt & Whitney service representative.

See Figure 4 for the data retrieval form.

F O R E N G I N E S R E M O V E D F R O M T H E A I R C R A F T ( A S S E M B L E D E N G I N E S A N D / O R H P C M O D U L E S N O T S C H E D U L E D F O R D I S A S S E M B L Y O R I N S P E C T I O N )

1.

Do an inspection of the 15th stage disk, PN 55H615 by one of the procedures that follow .

See Figure

1.

N O T E :

This inspection does not supersede or replace Reference 6, Service Bulletin No.

PW4G-1 12-72-243.

This procedure is intended for assembled engines and/or HPC modules not scheduled for disassembly or inspection as specified by Reference 4, CIR Manual, Chapter/Section 72-35-92, Inspection/Check-02 or Reference 6, Service Bulletin No.

PW4G-1 12-72-243.

A.

Do an ECI of the disk as specified in Reference 7, NDIP-1014, Revision B .

NDIP-1014, Revision B is provided in the Appendix section of this Service Bulletin.

or B.

Do a borescope inspection of the disk as follows:

(1) Access the disk through the AP-7 (borescope) port as specified in the Reference 3, Engine Manual, Chapter/Section 72-00-00, Inspection/Check-03.

See Figure 2, Sheets 1 and

2.

N O T E :

The variable vanes must be fully open when the engine is shutdown.

If the vanes are not open use a large wrench or a crows foot wrench to rotate the bellcrank on the stator vane actuator to the fully open position.

(2) Insert the borescope into the AP-7 port to view the front rail of the disk.

See Figure 2, Sheets 3 and

4.

(3) Remove the gearbox crank pad cover and use a PW A 88247 Rotator or equivalent to rotate the rotor at the gearbox crank pad.

(4) Rotate the rotor until the first blade lock is seen.

Use the blade lock locations for angular reference.

See Figure

3.

(5) Rotate the rotor in the same direction past two additional blades.

If another blade lock is found just past the second blade then the current location is a l November 10/09 PW4G-1 12-72-309

REVISION NO.

1 - July 1/10 Page 8

UTC/P&W

PROPRIET AR Y

INFORMA TION Subject to the restrictions on the cover or first page.

lock and loading location.

The loading slot (which is not visible) is between the two blade locks.

See Figure

3.

(6) Do an inspection of the front rail in the areas adjacent to the locking slots and the area between the two locking slots for cracks.

Cracks typically run in the radially inboard direction from the outer rim of the rail.

See Figure 2, Sheet

4.

(7) If another blade lock is not found just past the second blade, then the location is a blade lock only .

See Figure

3.

(8) Do an inspection of the front rail for cracks adjacent to the blade lock.

Cracks typically run in the radially inboard direction from the outer rim of the rail.

See Figure 2, Sheet

4.

(9) Rotate the rotor until the next blade lock is visible and do the inspection of the two blade lock and loading areas and four blade lock areas.

N O T E :

Rotating the crack pad 360 degrees represents more than 360 degrees of rotor rotation.

(10) The inspection criteria is as follows:

(a) If the disk does not have a crack, the disk is acceptable.

(b) If the disk does have a crack, replace the disk.

(c) If a crack is suspected, but cannot be visually confirmed, do an ECI within 5 cycles, as specified in Reference 7, NDIP-1014 Revision B .

NDIP-1014 Revision B is provided in the Appendix section of this Service Bulletin.

(1

1) Remove the borescope and install the AP-7 borescope plug and new Key W asher , PN 58H216 as specified in Reference 3, Engine Manual, Chapter/Section 72-00-00, Inspection/Check-03.

(12) Remove the PW A 88247 Rotator or equivalent and install the gearbox crank pad cover .

(13) Record the inspection results.

For all disks that have cracks:

operators are requested to provide the results of the inspection to their local Pratt & Whitney service representative.

See Figure 4 for the data retrieval form.

l November 10/09 PW4G-1 12-72-309

REVISION NO.

1 - July 1/10 Page 9

UTC/P&W

PROPRIET AR Y

INFORMA TION Subject to the restrictions on the cover or first page.

Page 11OCROpen in PDF

Pratt & Whitney A United Technologies Company 55H615 15TH STAGE DISK

INSPECT AS SPECIFIED IN

THE ACCOMPLISHMENT

INSTRUCTIONS B521581 LOCATION OF THE 15TH STAGE HPC DISK 72-35-00 FIGURE 1 November 10/09 PW4G-112-72-309

• REVISION NO. 1 - July 1/10 Page 10

UTC/P&W PROPRIETARY INFORMATION Subject to the restrictions on the cover or first page.

Page 12OCROpen in PDF

Pratt & Whitney A United Technologies Company

RIGHT SIDE OF ENGINE — 80° (AP-7)

REAR SCHEMATIC VIEW LOCATION OF THE AP-7 PORT B521582 INSPECTION OF THE 15TH STAGE HPC DISK FIGURE 2, SHEET 1 November 10/09 PW4G-112-72-309 REVISION NO. 1 - July 1/10 Page 11

UTC/P&W PROPRIETARY INFORMATION Subject to the restrictions on the cover or first page.