Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'de86ffd0839872557d85d0ee9e3f5de8b2d0c240e7238b739fbfde4c0249976c' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'de86ffd0839872557d85d0ee9e3f5de8b2d0c240e7238b739fbfde4c0249976c' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Service Bulletin 11 August 2020
2000ï32ï081 Page 1 of 20 ATA CHAPTER: 32 LANDING GEAR ï EMERGENCY EXTENSION ï ENERGIZE LANDING GEAR
TRANSFER VALVE AT LANDING GEAR EMERGENCY RELEASE Mod No. 6585, 6599
1. PLANNING INFORMATION A. EFFECTIVITY
(1) Aircraft:
Aircraft Mfg. Serial No’s SAAB 2000 ï 004ï063.
(2) Spares: Not affected.
NOTE: This Service Bulletin supersedes and cancels Service Bulletin No. SAAB 2000ï32ï080.
B. REASON Due to an event where it was not possible to fully retract or extend/locked down Main Landing Gears, using normal or emergency procedures, causing left Main Landing Gear collapsed after touchdown, the landing gear system is modified so that the transfer valve is energized to its down position when emergency handle is used.
C. DESCRIPTION This Service Bulletin gives instructions for:
ï installation of new relay ï relocation of wires ï installation of new wires.
ï functional test.
D. COMPLIANCE Mandatory.
Saab recommends this Service Bulletin to be performed within 24 months or 3000 flight hours, whichever comes first, from release of this Service Bulletin.
This Service Bulletin is under EASA consideration for an Airworthiness Directive.
The final compliance terms will be set by the EASA Airworthiness Directive (AD) when issued.
E. APPROVAL The technical content of this Service Bulletin is approved under the authority of DOA nr.
EASA.21J.066.
F. MANPOWER Estimated time to complete this Service Bulletin is:
1 person required.
Total manhours: 20 Elapsed time (hours): 20
Service Bulletin 11 August 2020
2000ï32ï081 Page 2 of 20 G. MATERIAL ï COST AND AVAILABILITY Price and availability for Mod Kit. No. SAAB 2000ï32ï081ï01 will be furnished on request.
H. TOOLING Heat gun.
Crimp tool Positioner Insert tool Removal tool Used for GMT232 ï ï ï S2016, S2420 M22520/1ï01 TH343 M81969/14ï02 M81969/14ï02 RSD20 M22520/2ï01 K818ï2 CTA 1160 CTA 1160 MS20S M22520/1ï01 TH441ï1 BL J1276ï1 J1276ï1 TJB16 47386 ï ï ï T1831
(1) Faraday cage (For separation bolts).
(2) Multimeter, FLUKE 177, or equivalent.
I. WEIGHT AND BALANCE Weight change + 0.19 kg / 0.41 lb Center of gravity STA 186.9 Change moment 0.35 kgin / 0.76 lbin 100 J. ELECTRICAL LOAD DATA RH BAT BUS + 0.8A (only when landing gear emergency release is used).
K. REFERENCES Aircraft Maintenance Manual (AMM) TASK 07 ï10ï00ï582ï807 TASK 07ï10ï00ï582ï808 TASK 24ï00ï00ï860ï801 TASK 24ï00ï00ï860ï802 TASK 24ï00ï00ï860ï805 TASK 24ï00ï00ï860ï806 TASK 24ï31ï10ï710ï801 TASK 29ï10ï00ï860ï801 TASK 29ï10ï00ï860ï803 TASK 29ï20ï29ï200ï801 TASK 31ï15ï10ï400ï801 TASK 32ï00ï00ï000ï801 TASK 32ï00ï00ï400ï801 TASK 32ï30ï00ï720ï801 TASK 32ï32ï20ï760ï801 Wiring Manual 20 ï20ï00 20ï30ï15 20ï20ï30 L. OTHER PUBLICATIONS AFFECTED Aircraft Maintenance Manual (AMM) Illustrated Parts Catalog (IPC)
Service Bulletin 11 August 2020
2000ï32ï081 Page 3 of 20 Wiring Diagram Manual (WDM) Aircraft Operations Manual (AOM) Maintenance Review Board Report (MRB)
2. ACCOMPLISHMENT INSTRUCTIONS CAUTION: BE CAREFUL WHEN YOU DO THE MODIFICATION OF THE HARNESS.
MAKE SURE THAT YOU DO NOT DAMAGE THE EXISTING WIRES WHEN NEW WIRES ARE INSTALLED. CLEAN AND INSPECT THE AFFECTED HARNESS WHEN THE MODIFICATION IS COMPLETED. DAMAGES TO THE WIRES CAN CAUSE SYSTEM MALFUNCTION.
NOTE: All wiring changes are to be performed in accordance with the procedures in the WM 20ï00ï00.
NOTE: The color of the lacing cord on the A and the B wire bundles gives the harness class and identification. The A harness is identified with white lacing cord and the B harness is identified with red/black lacing cord.
A. JOB SET ïUP
(1) Before you start the SB, make sure:
ï The modification kit contains the parts listed in the Service Bulletin ï The local supply items listed in the Service Bulletin are available ï The documentation is available ï The special tools are available.
(2) Remove the external AC power (Ref. AMM TASK 24 ï00ï00ï860ï802).
(3) Disconnect the LH, RH and CTR Battery (Ref. AMM TASK 24 ï00ï00ï860ï805).
(4) Remove the access panels.
ï 114AZ ï 118AR ï 466AZ B. INSTALLATION
(1) in the RH electrical center 306VU.
REF. FIG. 5 view CïC, DïD and E.
(a) Install the relay socket (602).
(b) Install the marker decal 11GB ïJ1 adjacent to the relay socket (602).
C. MODIFICATION
(1) Loosen and disconnect the connector 94VP ïP4.
(2) Disassemble the connector 94VP ïP4 (Ref. WDM 20ï30ï15).
(3) Relocate the following wires in the RH electrical center 306VU.
REF. FIG. 1, 2, 3, 4 and 5 Wire No Class From Contact To Contact Remarks GA247ï24 A 94VPïP4:B19 ï 2VSïBY S2420 Connect together with GB3007ï20 and GA3001ï24 GA260ï24 A 94VPïP4:B20 ï 2VSïBX S2420 Connect together with GB3005ï20 and GA3000ï24
Service Bulletin 11 August 2020
2000ï32ï081 Page 4 of 20 Wire No RemarksContactToContactFromClass GB14ï20BK A 94VPïP4:B16 ï 306VSïRG S2016 If necessary, replace the wire GB70ï20 GB62ï20 A 10GBïJ1:B3 ï 306VSïRF S2016
(4) Install the following new wires in the RH electrical center 306VU. Route along the existing class A harness routing.
REF. FIG. 1, 2, 3, 4 and 5 Wire No Class From Contact To Contact Remarks GA3000ï24 A 94VPïP4:B20 MS20S 2VSïBX S2420 Connect together with GA260ï24 and GB3005ï20 GA3001ï24 A 94VPïP4:B19 MS20S 2VSïBY S2420 Connect together with GA247ï24 and GB3007ï20 GB3000ï20 A 11GBïJ1:X1 RSD20 306VSïRJ S2016 Connect together with GB3016ï20 GB3005ï20 A 11GBïJ1:B2 RSD20 2VSïBX S2420 Connect together with GA260ï24 and GA3000ï24 GB3006ï20 A 11GBïJ1:C1 RSD20 306VNPïB:3 TJB16 GB3007ï20 A 11GB−J1:C2 RSD20 2VSïBY S2420 Connect together with GA247ï24 and GA3001ï24 GB3009ï20 A 11GBïJ1:X2 RSD20 306VSïRF S2016 Connect together with GB3012ï20 GB3012ï20 A 10GBïJ1:B3 RSD20 306VSïRF S2016 Connect together with GB3009ï20 GB3016ï20 A 11GBïJ1:B1 RSD20 306VSïRJ S2016 Connect together with GB3000ï20 GB3017ï20 306VSïRG S2016 94VPïP4:B16 MS20S Connect together with GB3018ï20 GB3018ï20 306VSïRG S2016 306VSïRJ S2016 Connect together with GB3017ï20
Service Bulletin 11 August 2020
2000ï32ï081 Page 5 of 20 NOTE: Make a new screen connection 94VP ïP4:803 to make space for the new splice 306VSïRG.
(5) In the RH electrical center 306VU, install the relay 11GB (601). (Ref. AMM TASK 31ï15ï10ï400ï801) (Ref. Fig. 5 view CïC and E.
(6) Install the marker decal 11GB adjacent to the relay (601).
(7) Assemble the connector 94VP ïP4 (Ref. WDM 20ï30ï15).
(8) Connect and attach the connector 94VP ïP4.
D. FUNCTIONAL TEST
(1) Prepare for the functional test.
(a) Connect the LH, RH and CTR Battery (Ref. AMM TASK 24 ï00ï00ï860ï806).
(b) Supply the external AC power (Ref. AMM TASK 24 ï00ï00ï860ï801).
(c) Inspect and Correct if necessary the Oil Level in System 2b and 2a Hydraulic Reservoir (Ref. AMM TASK 12ï20ï29ï200ï801).
(d) Lift the Aircraft on the Three Main Jacks (Ref. AMM TASK 07 ï10ï00ï582ï807).
WARNING: YOU MUST INSTALL THE FARADAY CAGE TO THE SEPARATION BOLT.
INJURY TO PERSONS CAN OCCUR IF THE SEPARATION BOLT ACCIDENTALLY DETONATES.
WARNING: YOU MUST WEAR SAFETY GLASSES AND EAR PROTECTORS WHEN YOU REMOVE THE CONNECTOR ON THE SEPARATION BOLT. INJURY TO
PERSONS CAN OCCUR IF THE SEPARATION BOLT ACCIDENTALLY DETONATES.
(e) On the LH circuit breaker panel 9VU, open the circuit breaker L LDG EMER RELEASE (E12).
(f) On the RH circuit breaker panel 10VU, open the circuit breaker R LDG EMER RELEASE (L11).
(g) In the LH Main Landing Gear bay, disconnect the connector 3GB ïP1 from the separation bolt.
(h) Install blanking caps on the connector 3GB ïP1.
(i) Install a Faraday cage on the connector on the separation bolt.
(j) In the RH Main Landing Gear bay, disconnect the connector 4GB ïP1 from the separation bolt.
(k) Install blanking caps on the connector 4GB ïP1.
(l) Install a Faraday cage on the connector on the separation bolt.
(m) On the LH circuit breaker panel 9VU, close the circuit breaker L LDG EMER RELEASE (E12).
(n) On the RH circuit breaker panel 10VU, close the circuit breaker R LDG EMER RELEASE (L11).
(o) Put a warning sign ” KEEP CLEAR OF THE LANDING GEAR ” adjacent to the aircraft.
(2) Do the functional test.
WARNING: BE CAREFUL WHEN YOU OPERATE THE LANDING GEAR. MAKE SURE PERSONS ARE NOT NEAR THE LANDING GEAR. WHEN THE LANDING GEAR MOVE IT CAN CAUSE INJURY TO PERSONS.
NOTE: During the test in step (2) (a) thru (2) (n) the position of the landing gear handle and the landing gear position arrows may be out of sync and the caution GEAR CONFIG and GEAR FAULT may occur. This can be ignored.
Service Bulletin 11 August 2020
2000ï32ï081 Page 6 of 20
ACTION RESULT
(a) On the overhead panel HYDRAULIC (27VU), set the pushbutton L DC PUMP to OFF.
(b) Release pressure in hydraulic accumulators for system 1 (Ref.
AMM TASK 29ï10ï00ï860ï803)
(c) Remove landing gear safety pins (Ref. AMM TASK 32ï00ï00ï000ï801)
(d) Pressurize the hydraulic system 2 (Ref. AMM TASK 29ï10ï00ï860ï801).
(e) Move the landing gear handle to the UP position.
The landing gears retract.
(f) On the LH circuit breaker panel 9VU, open the circuit breaker L LDG CTL (F11).
(g) In front of the co ïpilots control column, pull the emergency release handle.
The main landing gear extend.
The nose landing gear stays in retracted position.
On the EICAS display, the two green main landing gear DN symbols are shown.
(h) Move the landing gear handle to the down position.
(i) On the LH circuit breaker panel 9VU, close the circuit breaker L LDG CTL (F11).
The nose landing gear extends.
(j) On the overhead panel HYDRAULIC PANEL 27VU, set the switch HYDRAULIC PUMP C/R AC to the OFF position.
(k) Install the landing gear safety pin on the nose landing gear (Ref.
AMM TASK 32ï00ï00ï400ï801).
(l) In the nose wheel well, manually turn the crank on the emergencyïuplock release valve to the usual position (make sure the emergency release switch is not activated).
(m) In the flight compartment, make sure the emergency release handle is in the usual position.
Service Bulletin 11 August 2020
2000ï32ï081 Page 7 of 20
ACTION RESULT
(n) Do step (c) thru (m) again four times.
(o) Install snap wire on the emergency release handle.
(3) Check voltage in separation bolts 3GB ïP1 and 4GBïP1
(a) Install the landing gear safety pin on the main landing gear (Ref. AMM TASK 32ï00ï00ï400ï801).
(b) Remove the blanking caps from the connectors 3GB ïP1 and 4GBïP1.
(c) In 3GB ïP1, use a multimeter and check the voltage on pin A, B, C and D against a suitable ground. Make sure there are no 28VDC on any of the pins.
(d) In 4GB ïP1, use a multimeter and check the voltage on pin A, B, C and D against a suitable ground. Make sure there are no 28VDC on any of the pins.
(4) Restore the separation bolts and continue the test.
(a) On the LH circuit breaker panel 9VU, open the circuit breaker L LDG EMER RELEASE (E12).
(b) On the RH circuit breaker panel 10VU, open the circuit breaker R LDG EMER RELEASE (L11).
(c) In the LH main landing gear bay, 1 Remove the Faraday cage from the connector on the separation bolt.
2 Connect the connector 3GBïP1 to the separation bolt.
(d) In the RH main landing gear bay.
1 Remove the Faraday cage from the connector on the separation bolt.
2 Connect the connector 4GBïP1 to the separation bolt.
(e) On the LH circuit breaker panel 9VU, close the circuit breaker L LDG EMER RELEASE (E12).
(f) On the RH circuit breaker panel 10VU, close the circuit breaker R LDG EMER RELEASE (L11).
(g) Do the electrical continuity test of the separation bolt (Ref. AMM TASK 32ï32ï20ï760ï801).
(h) Remove all landing gear safety pins from the nose landing gear and main landing gear.
(Ref. AMM TASK 32ï00ï00ï000ï801).
(i) Do the Functional Test of the Extension and Retraction of the Landing Gears (Ref. AMM TASK 32ï30ï00ï720ï801).
(j) Install all landing gear safety pins (Ref. AMM TASK 32 ï00ï00ï400ï801).
(5) Do the following tests to verify functionality after disconnection/connection of 94VP ïP4.
(a) Do the operational test of the TRU (Ref. AMM TASK 24 ï31ï10ï710ï801).
(b) Operational test of the STBY ROLL trim signal.
ACTION RESULT 1 In the flight compartment, on the panel 35VU:
ï Operate the STBY ROLL trim switch to the left and hold it in that position for min. 30 seconds.
On the SED, The ROLL trim indicator shows the RH trim in the fully up position.
Service Bulletin 11 August 2020
2000ï32ï081 Page 8 of 20
ACTION RESULT 2 Operate the STBY ROLL trim switch to the right and hold until the actuator stops.
On the SED, The ROLL trim indicator shows the RH trim in the fully down position.
(c) Do the continuity check of the fire handle/GCU signal.
ACTION RESULT 1 On the RH circuit breaker panel 8VU, open tag and safety the circuit breaker FUEL R FIRE VLV (R20).
2 On the RH circuit breaker panel 10VU, open tag and safety the circuit breaker
HYDRAULIC R SHUT OFF VLV (M12).
3 In the RH nacelle, disconnect the connector 4XAïP2 from the generator control unit.
4 Pull the R ENG fire handle.
5 Use the multimeter and measure between 4XAïP2:H and A/C ground.
4XAïP2:H is open to ground (100k:min).
6 Push the R ENG fire handle.
7 Use the multimeter and measure between 4XAïP2:H and A/C ground.
4XAïP2:H is connected to ground (10 :
max).
8 Make sure the safety locks engage the R ENG fire handle.
9 Connect the connector 4XAïP2 to the generator control unit.
10 On the RH circuit breaker panel 8VU, remove the tag and close the circuit breaker FUEL R FIRE VLV (R20).
11 On the RH circuit breaker panel 10VU, remove the tag and close the circuit breaker
HYDRAULIC R SHUT OFF VLV (M12).
Service Bulletin 11 August 2020
2000ï32ï081 Page 9 of 20 E. JOB CLOSE ïUP
(1) Lower the Aircraft and Remove the Three Main Jacks (Ref. AMM TASK 07 ï10ï00ï582ï808).
(2) Remove all the tools and the equipment from the work area. Make sure the work area is clean.
(3) Install the access panels.
ï 114AZ ï 118AR ï 466AZ.
(4) Remove the external AC power (Ref. AMM TASK 24 ï00ï00ï860ï802).
(5) Remove all the tools and the equipment from the work area. Make sure the work area is clean.
Service Bulletin 11 August 2020
2000ï32ï081 Page 10 of 20
3. MATERIAL INFORMATION A. Modification Kit No SAAB 2000 ï32ï081ï01 contains:
Item Part Number Qty Nomenclature Designation Remarks 601 M83536/6 ï022L O/T M83536/6ï022M O/T 16303ï804ïG3Nï2 YE3 O/T 16303ï804ïG3Nï2 EE0 1 Relay ï 11GB 602 RSE120060 O/T S220ïA4A0 O/T SE405ï01.04.01 1 Relay Socket ï 11GBïJ1 603 D ï101ï00 1 Solder Sleeve 94VP ïP4:803 ï 55T8015ï24ï9 500mm Wire GA3000 ï2401 ï 55T8015ï24ï9 500mm Wire GA3001 ï2401 ï 55A0811ï20ï9 300mm Wire GB70 ï2001 If necessary ï 55A0811ï20ï9 300mm Wire GB3000 ï2001 ï 55A0811ï20ï9 2000mm Wire GB3005 ï2001 ï 55A0811ï20ï9 3000mm Wire GB3006 ï2001 ï 55A0811ï20ï9 2000mm Wire GB3007 ï2001 ï 55A0811ï20ï9 1000mm Wire GB3009 ï2001 ï 55A0811ï20ï9 500mm Wire GB3012 ï2001 ï 55A0811ï20ï9 300mm Wire GB3016 ï2001 ï 55A0811ï20ï9 300mm Wire GB3017 ï2001 ï 55A0811ï20ï9 2000mm Wire GB3018 ï2001 S2420 D ï436ï36 2 Butt splice ï 2VSïBX 2VSïBY S2016 D ï436ï37 3 Butt splice ï 306VSïRF 306VSïRG 306VSïRJ RSD20 M39029/101 ï553 7 Contact ï 10GBïJ1 11GBïJ1 MS20S CTA ï0165 3 Contact ï 94VPïP4 TJB16 YHMM16 ï5DB8 1 Terminal Junction ï 306VNP
Service Bulletin 11 August 2020
2000ï32ï081 Page 11 of 20 Item RemarksDesignationNomenclatureQtyPart Number ï 6127432−016 O/T IT18R.NN O/T IT18RNN901 O/T lT18RNN3P 1 Marker plate ï 94VPïP4 ïï 1 Marker decal 11GB ïJ1 ïï 1 Marker decal 11GB ïï 1 Marker decal 94VP ïP4 ï RNF100 3/16 1 Marker sleeve 2VS ïBX ï RNF100 3/16 1 Marker sleeve 2VS ïBY ï RNF100 3/16 1 Marker sleeve 306VS ïRF ï RNF100 3/16 1 Marker sleeve 306VS ïRG ï RNF100 3/16 1 Marker sleeve 306VS ïRJ B. Local supply Item Part Number Qty Nomenclature Designation Remarks ï NITTO 665 AR Silicone Tape ï Or equivalent ïï AR Lacing cord ïï ïï AR Cable ïtie ïï ïï AR Snap wire, Brass,
0.02 in (0.5 mm) diameter.
For emergency release handle.
Service Bulletin 11 August 2020
2000ï32ï081 Page 12 of 20 Wiring Diagram System GA ï PRE MOD FIG. 1 B23835 J G A2 R B2A2A1 B1 A5 L 1 HP 2 134 XW V U TKMS N GA264ï24 GA262ï24 GA162ï24 GA116ï24 GA104ï24 GA105ï24 GA246ï24 GA246ï24 GA249ï24 GA249ï24 GA242ï24GA242ï24 GA245ï24GA245ï24 GA248ï24 GA247ï24 GA261ï24 GA260ï24 GA109ï24GA244ï24 GA243ï24 GA108ï24 GA111ï24 GA115ï24 GA114ï24 GA113ï24 GA112ï24 SHT 2 2VS V B3A3 MH X1 X2 2VS AC 2VS AB DGLL
CB F E D 6VP P1 J1
CONTROL VALVE
LANDING GEAR 15GA J2 P2
CONTROL PANEL B 4VNP 6MH J1 1VU CENTER INSTR PANEL 1GA LANDING GEAR 95VP P1 P1 B23835 PART OF DWG REF. 7332390ï801 SHEET 1 OF 5 REV.
PART OF DWG REF. 7332390ï504 SHEET 1 OF 5 REV. E PART OF DWG REF. 7332390ï802 SHEET 1 OF 5 REV.
B19 B18 B20 B13 GA248ï24 GA247ï24 GA261ï24 GA260ï24 94VP P4 J4