Other document · Schempp-Hirth

No revision namedSchempp-Hirth Technical Note 868-4_890-5 with Appendix · 9 pages · 2.0 MB

© Schempp-Hirth. Filed by the FAA in regulations.gov docket FAA-2024-2135; AD 2025-04-14 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2024-2135 (document 0007) · AD 2025-04-14

Manufacturer
Schempp-Hirth
Type
Technical Note
Number
868-4/890-5

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 1 proposed AD.

Text · 9OCR

This text is OCR from a scan. OCR can misread letters and numbers. © Schempp-Hirth. Filed by the FAA in regulations.gov docket FAA-2024-2135; AD 2025-04-14 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '41264b677326abb008080a8949b5e15bf18a57a81b95ca7489616b67010e6e56'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

SCHEMPP-HIRTH Technical Note Page No. 01 Flugzeugbau GmbH. No. 868 - 4 Kirchheim/Teck No. 890 - 5 No. of pages 02 SUBJECT: Canopy locking mechanism AFFECTED: Powered Sailplane Nimbus-4DT (TC-No. 868) S/N 1 through 12 Powered Sailplane Nimbus-4DM (TC-No. 868) S/N 1 through 58 Powered Sailplane Duo Discus T (TC-No. 890) S/N 1 through 96 URGENCY Recommended before/at next annual inspection REASON: - A sailplane type has experienced fuselage deformation resulting from acceleration which perhaps lowered the friction in the canopy locking mechanism. It may then be possible for the canopy locking mechanism to move into the open position.

In an other case the canopy opened shortly after take-off on aerotow. But it cannot ruled out that the canopy with locked mechanism was placed on the fuselage pins instead being connected with the pins and fuselage.

For this case a red mark on the canopy frame should placed which is not visible when the canopy is correct closed on the fuselage frame.

ACTIONS: 1. Nimbus-4DT, Nimbus-4DM A compression spring will installed in the canopy locking mechanism will ensure that the locking mechanism is always moved in the closed position.

The retrofit of the spring is done in accordance with the working instruction in the appendix (if not yet done).

2. Nimbus-4DT, Nimbus-4DM To increase the friction in the canopy locking mechanism spring washers are fitted to both levers, see working instruction in the appendix (if not yet done).

Page 2OCROpen in PDF

SCHEMPP-HIRTH Technical Note Page No. 02 Flugzeugbau GmbH. No. 868 - 4 Kirchheim/Teck No. 890 - 5 No. of pages 02 ACTIONS (ctd.): 3. Nimbus-4DT, Nimbus-4DM, Duo Discus T A magnet is mounted on the front lever. In the locked position the magnet is flush on the operating rod and produce an additional retention The installation of the modified front lever and the adjustment of the magnet is done in accordance with the working instruction in the appendix.

4. Nimbus-4DT, Nimbus-4DM, Duo Discus T The canopy frame will painted on two areas on the inner side, see drawing in the appendix.

This marks are masked by the fuselage frame when the canopy is correct closed.

MATERIAL: Item 1: 1 Compression spring 1,25 × 10 x 64 × 12,5 mm 1 Bushing Drawing No. S14 RB 800 1 Hose clamp S9/9ZY VPE 100 (Norma) 1 guide (if required) Part 13 in Drawing No. S14RB805 1 screw (if required) M4x30 DIN 84 1 locking nut (if required) M4 Item 2: 2 Spring washers (waved) DIN 137-B8-Fst 2 Lock nuts (flat) M6 2 Lock nuts (flat) M5 2 washers DIN 988, 6 × 12 × 0,5 mm Item 3: 1 Magnet 37513 Magma-C or 1 front lever with magnet (Drawing No. S14 RB 802) Item 4: 2-component coating RAL 2004 (orange) WEIGHT: No change C/G POSITION: No change Note: 1. This issue supersedes the Technical Note No. 868-4, dated July 4", 2001.

2. Actions may be accomplished by an experienced person and entered in the log book at the occasion of the next annual inspection.

Kirchheim/Teck, 15.02.2005 LBA-approved: EASA approved on:

The German original has been 23.02. 2005 and is signed of by Mr. date of..... under Approval No.: 2005 - 1925 Issued: vul done by best knowledge and The translation into English has been ( Treiber) judgement.

Page 3OCROpen in PDF

SCHEMPP-HIRTH Appendix to Blatt: 01 Flugzeugbau GmbH. Technical Note Kirchheim/Teck No. 868 - 4 / 890 - 5 Blattz.: 07 Mounting of a compression spring in the canopy locking mechanism Remark:

At earlier S/Nos the guide for the locking mechanism is perhaps missing.

a) Mount the guide.

b) Drill a 4mm hole from underneath 15mm from the inner end of the guide.

c) Mount a 4 mm screw with a locking nut.

1. a) Shorten the spring ½ turn and file the wire end.

b) Turn spring (with the filed wire end) on the mechanism in front of the canopy cross bar.

Apply spring diagonally and turn on by hand the last winding with the aid of a needle-nose pliers.

2. Mount slotted bushing (with the flange aft) on the locking mechanism forward of the compression spring.

3. Slide the open hose clamp (fixed nut outside) on the locking mechanism and mount it on the bushing.

4. a) Open locking mechanism fully.

b) Compress the spring fully.

c) Tighten the hose clamp so that the bushing will not move, see photo 15 mm

Page 4OCROpen in PDF

SCHEMPP-HIRTH Appendix to Blatt: 02 Flugzeugbau GmbH. Technical Note Kirchheim/Teck No. 868 - 4 / 890 - 5 Blattz.: 07 Mounting of the spring washers at the canopy actuating levers Forward actuating lever:

1. Remove stop-nut at the lever.

2. Dismount connection between the actuating mechanism.

3. Dismount the actuating mechanism.

4. Remove lever from the hinge point without brass bushing.

5. Insert waved spring washer on brass bushing.

6. Install lever on brass bushing with waved spring washer below.

7. Mount washer (0,5 mm) and new stop-nut at lever hinge point.

8. Connect actuating mechanism and mount it on the lever again.

Aft actuating lever

9. Remove stop-nut at the lever.

10. Remove lever from the hinge point without brass bushing.

11. Insert waved spring washer on brass bushing.

12. Install lever on brass bushing with waved spring washer below.

13. Mount washer (0,5 mm) and new stop-nut at lever hinge point.

Page 5OCROpen in PDF

SCHEMPP-HIRTH Appendix to Blatt: 03 Flugzeugbau GmbH. Technical Note Kirchheim/Teck No. 868 - 4 / 890 - 5 Blattz.: 07 Front actuating lever with magnet

1. Remove front lever refer to item 1 through 5 on page 02.

2. a) Modified lever according drawing on page 04. Paint it and mount magnet or

b) order a modified lever with magnet from the manufacturer or the manufacturer modify the lever.

c) Mount lever with magnet.

3. Adjustment of the magnet and hints The magnet must be adjusted that no spring-back is in the actuating mechanism and the magnet is flush to the operating rod, see photo "front canopy locking mechanism 4".

To reach this adjustment it should be required:

a) to grind the corners at the lugs of the actuating rods at the front and aft levers, see photo "aft canopy locking mechanism 1".

b) if the lugs running not parallel to the rods:

The lugs should be bent parallel to the actuating direction of the levers, see photo "front canopy locking mechanism 3".

c) If the magnet with locked actuating mechanism is not flush to the rod, the rod must be bent parallel to the magnet surface, see photo ifront canopy locking mechanism 2".

4. With the magnet and the actuating mechanism correct adjusted a small retention force is noticeable.

The connection of the magnet is secured with Loctite i.e. No. 243 (blue).

Remark:

The magnet force is only effective if the gap is less than 1 mm.

Therefore the magnet must be flush with the rod for the highest retention force.

An example for insufficient adjustment of the magnet and the rod is shown on photo "front canopy locking mechanism 2".

Page 6OCROpen in PDF

SCHEMPP-HIRTH Appendix to Blatt: 04 Flugzeugbau GmbH. Technical Note Kirchheim/Teck No. 868 - 4 / 890 - 5 Blattz.: 07 magnet

4.6 mm 0.181 in.

61 mm

2.40 in.

M5 49 mm modification 1.93 in.

Page 7OCROpen in PDF

SCHEMPP-HIRTH Appendix to Blatt: 05 Flugzeugbau Gmbh. Technical Note Kirchheim/Teck No. 868 - 4 / 890 - 5 Blattz.: 07 corner jams with locked lever aft canopy locking mechanism 1 magnet not flush to the rod;

no retention force at the lever front canopy locking mechanism 2

Page 8OCROpen in PDF

SCHEMPP-HIRTH Appendix to Blatt: 06 Flugzeugbau GmbH. Technical Note Kirchheim/Teck No. 868 - 4 / 890 - 5 Blattz.: 07 lug skewed;

not parallel bent front canopy locking mechanism 3 magnet must be flush and without tension on the rod front canopy locking mechanism 4

Page 9OCROpen in PDF

SCHEMPP-HIRTH Appendix to Blatt: 07 Flugzeugbau GmbH. Technical Note Kirchheim/Teck No. 868 - 4 / 890 - 5 Blattz.: 07 front instrument panel 100 mm

3.94 in.

150 mm

5.91 in.

red mark front and aft inside left canopy frame