Supplemental type certificates
49,117 STCs, most recently changed first. Search by what an STC changes, its holder or a model.
Query with SQL
duckdb -csv -c "SELECT stc_number, description, holder, status, status_date FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' ORDER BY status_date DESC NULLS LAST, stc_number"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT stc_number, description, holder, status, status_date FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' ORDER BY status_date DESC NULLS LAST, stc_number
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
STC SA5621SWInstallation of electrically driven vacuum pump.STC SA5631SWInstallation of electrically driven vacuum pump as a standby auxiliary pump to the existing instrument air system.STC SA5675SWInstallation of an electrically driven vacuum pump as a standby auxiliary pump.STC SA5679SWInstallation of an electrical driven vacuum pump as a standby auxiliary pump.STC SA5681SWInstallation of electrically driven vacuum pump as a standby auxiliary pump to the existing instrument air system.STC SA5701SWInstallation of electrically driven vacuum pump as a standby auxiliary pump to the existing instrument.STC SA5717SWInstallation of electrically driven vacuum pump as a standby auxiliary pump to existing instrument air system.STC SA5827SWInstallation of electrically driven vacuum pump as an auxiliary instrument air system.STC SA5887SWInstallation of electrically driven vacuum pump as a standby auxilixary pump to the existing instrument air system.STC SA5925SWInstallation of auxiliary instrument air system.STC SA7628SWInstallation of a standby vacuum system.STC ST01468NYInstallation of NAI part number C93602 Solid State Logo lightSTC SA02387CHInstallation of Piper Part Number 12649-00 Stabilizer and Piper Part Number 12647-00 Elevators in lieu of original components.STC SH129WEInstallation of Chadwick C-20 auxiliary fuel system. (369HS (SN 0101 & subs), 369HE (SN 0101 & subs), 369HM (SN 0201 & subs), 369D (SN 033 & subs))STC SH139WEInstallation of Chadwick C-22 auxiliary fuel system and C-30 ferry kit.STC ST00287ATInstallation of a main deck cargo door.STC ST03359AT-DInstallation of a Custom Interior.STC ST00250BOInstallation of replacement fuel tank sensors and associated in-tank wiring.STC ST03352AT-DInstallation of a Custom Interior.STC SA01746SEFabrication and Installation of Electric Trim System.STC SA01747SEFabrication and Installation of Leading Edge Landing/Taxi Light.STC SA02363NYInstallation of a SkyTrac ISAT-100 Position Data Communication SystemSTC SA2635NMModify airplane by extending wings 16 inches, relocating the ailerons and flaps 16 inches outboard and installing trailing edge inserts on the wings.STC ST02349NYInstallation of Recaro SeatsSTC SA3659SWInstallation of Jetton Alert II alarm system.STC SB02398CHONE-ONLY: Replace the Cameron Balloons US Basket/Burner system and fuel tanks with the Aerostar International Basket Model CW (P/N 13860), the Aerostar International Burner Model H.P III Dual (P/N 52350), and the Aerostar International fuel tank models H-20 (P/N 07752), s/n 6374.STC ST02361NYInstallation of an Automated Flight Information Reporting System (AFIRS) 220 with optional Global Voice and Global Text Satellite CommuncationsSTC ST02362NYInstallation of a SAT-AFIS AntennaSTC SE02357NYInstallation of the Pratt & Whitney Canada, PT6A-135, dual fuel feed line configurationSTC ST02281CHInstallation of provision for CMC Electronics CMA-1100 PilotView Electronic Flight Bag system.STC SR02359NYCrosstube installationSTC ST00925ATApproval of increased operating weights as substantiated by the design data listed in Structural Integrity Engineering (SIE) Master Report List No. SIE-28-707, no revision, dated August 28, 1995, and modified.STC ST01486SEGroup aircraft approval for Reduced Vertical Separation Minimum (RVSM).STC ST02358NYInstallation of a Northern Airborne Technology STX100 SATPHONE systemSTC ST02360NYInstallation of a passenger interior arrangement using Geven passenger seatsSTC SR00696NYInstallation of external utility basket.STC ST02344NYCabin reconfiguration in bi-classesSTC SA02394CH-DInstallation of Hartzell propeller de-ice components.STC SA765CEInstallation of rear vanity compartment and storage area.STC ST00235WIModification of a single Collins AMS-850 Avionics Management SystemSTC ST02356NYInterior and Avionics installationSTC ST03416ATInstallation of the C16221LA03 Thales Integrated Standby Flight instruments Display (ISFD) on the pilot's P1-3 panel, as a replacement for the Altimeter, Horizon, and Airspeed analog Standby indicators.STC SR02287AKInstallation of Airglas, Inc., L2700-427 Ski Kit.STC ST01742SEInstallation of Innovative Solutions & Support (IS&S) Integrated Air Data Display Units (IADDU).STC ST03415ATInstallation of an Wingspeed Communication Management System utilizing IRIDIUM SATCOM.STC ST02354NYInstallation of Multi Mode Receiver (MMR) and Global Positioning System (GPS)STC ST10324SC-DInstallation of second Collins Automatic Direction Finder (ADF) System.STC SA1-436Leading edge landing lights in left-hand wing.STC SA504NEInstallation of 100W landing light in wing leading edge at each wing tip.STC SA543NEInstallation of 100W landing light in wing leading edge at each wing tip.