TCDS R00005SE
STCs approved under this data sheet · 24
Current certificates first, most recently changed first.
Query with SQL
duckdb -csv -c "SELECT s.stc_number, s.description, s.holder, s.status, s.status_date FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' s WHERE s.stc_number IN (SELECT stc_number FROM 'https://openairdocs.org/data/latest/faa_stc_model.parquet' WHERE tcds_number = 'R00005SE') ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_number"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT s.stc_number, s.description, s.holder, s.status, s.status_date FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' s WHERE s.stc_number IN (SELECT stc_number FROM 'https://openairdocs.org/data/latest/faa_stc_model.parquet' WHERE tcds_number = 'R00005SE') ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_number
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
STC SR12332SEInstallation of Mechanical Specialties, LLC Human External Cargo (HEC) and non-HEC Hook SystemSTC SR02796SEInstallation of Human External Cargo (HEC) systemSTC SH8609SWFabrication of Isolair Eliminator II Model 4600-205 fire fighting system.STC SR01776SEFabrication, installation, and maintenance of the Isolair Helicopters, Inc., Model 9002 High Cross tubesSTC SR00143DEInstallation of an upgraded 42 degree Tail Rotor gearbox, P/N 212-040-003STC SR00713SEInstallation of Onboard Systems International Cargo Hook KitSTC SH5707NMFabrication of Onboard Systems Model 200-088-03 or 200-088-04 (without Load Weight) or 200-089-03, -04, -05 or -06 (with Load Weight) cargo hook suspension systemsSTC SR02475SEInstallation of a Tailboom Motion Detection SystemSTC SR02492LAInstallation of a Helicopter Technology Company main rotor blade assemblySTC SR02641SEInstallation of a Service DeckSTC SR02070SEFabrication of Dart D205-770-011 Replacement Engine Mount KitSTC SR00929SEFabrication of tail boom mounted strakes.STC SR01039SEFabrication of tail boom mounted strakes in accordance with Master Drawing List Number BL-UH1H-01, Revision D, dated September 10, 2001, or later Federal Aviation Administration (FAA)-approved revision; and installation of this strake systemSTC SR01470SEFabrication and Installation of Fast Fin System.STC SR03408CHInstall Airwolf Aerospace, LLC Tension-Torsion Strap Assemblies, P/N AA-204-310-101-101 or AA-204-310-101-103STC SR02413LAInstallation of an AKV, Inc Exceedence and Trend Monitoring System kit P/N ETM1000STC ST04270ATInstall the VTOL ASSALT V3 Windscreen Laminate KitSTC SR01196LAInstallation of Honeywell (Lycoming) T53-L-703 engine to replace Honeywell (Lycoming) T53-L-13/13B/-13BA engine. Responsible ACO is Los Angeles, NM-L.STC SR02051LAInstallation of a VAn Horn Aviation Tail Rotor Blade.STC SR01946SEInstallation of the Mechanical Specialties, Model UH606STC SR09257RCFabrication, modification, and installation of a new vertical fin spar in accordance with Global Helicopter Technology, Inc., Drawing number VTF-030-800, Revision D, dated March 26, 2001, or later FAA approved revision.STC SR00103SEInstallation of Aviation Development Corporation oil filterSTC SR01298NYInstallation of replacement crosstubes P/N D212-664.STC SR00563NYInstallation of Skidtubes and associated saddles
Back to TCDS R00005SE