Page G - 45
(iii) Conditions for use of rotor brake.
(iv) Prohibitions against prolonged hover in cross or tail winds to prevent accumulation of noxious fumes in cockpit or cabin.
(v) Prohibitions against acrobatic maneuvers.
(vi) Required placards including text and location.
(vii) Special airworthiness equipment installations such as engine out or low rotor RPM warning systems.
AC 29.1583A. § 29.1583 (Amendment 29- 24) OPERATING LIMITATIONS.
a. Explanation . Amendment 29-24 to the regulation establishes additional operating limitations for maximum allowable wind for operation near the ground and ambient temperature limits.
b. Procedures . All of the previous advisory material remains applicable except that the minimum and maximum ambient temperature limitations are required in the limitations section. (These limitations were optional before Amendment 29-24.)
Additionally, the wind envelope for safe operation near the ground, which is established under § 29.143(c), must be included in the Limitations section. Such operations may include: IGE hover, takeoff, landing, rolling takeoff, rolling landing, and taxi. Advisory material for § 29.143(c) is given in paragraph AC 29.143(a)(2)(ii).
AC 29.1585. § 29.1585 (Amendment 29- 24) OPERATING PROCEDURES.
a. Explanation . The procedures sections of the manual should contain essential information peculiar to the particular type or model, the knowledge of which may be expected to enhance safety in the kinds of operations for which the type or model is approved. Information or procedures not directly related to airworthiness, or not under control of the crew, should not be included, nor should any procedure which is accepted as basic airmanship.
(1) Procedures information should be presented with respect to normal and emergency procedures. Alternatively, information outside the category of normal procedures may be subdivided into categories described as “abnormal” procedures and “emergency” procedures, as described herein.
(2) Notes, cautions, and warnings may be used to emphasize specific instructions or information in general accord with the following.
AC 29-2C, Chg 2 4/25/06 Page G - 46
(i) “Note” should be used with respect to matters not directly related to safety but which are particularly important (e.g., Note: For normal twin-engine operation, maximum permissible torque needle split is 4 percent total).
(ii) “Caution” should be used with respect to safety matters of a secondary order not immediately imminent (e.g., Caution: On engine restart reduce inter-turbine temperature (ITT) to 750° C on the operating engine).
(iii) “Warning” should be used with respect to safety matters of a primary order or imminent (e.g., Warning: Do not allow rotor RPM to drop below minimum limits).
(3) The operating procedures of this section have been developed with specific regard for the design features and operating characteristics of the rotorcraft and have been approved by FAA/AUTHORITY for guidance in identifying acceptable procedures for safe operation. Observance of these procedures is not mandatory, and FAA/AUTHORITY approval of such procedures is not intended to prohibit or discourage development and use of improved or equivalent alternate procedures based on operational experience with the rotorcraft. When alternate procedures are used, full responsibility for compliance with applicable airworthiness safety standards rests with the operator.
b. Procedures . Procedural information should be presented in substantial accord with the categories described below:
(1) Normal Procedures . Normal procedures are concerned with peculiarities of the rotorcraft design and operating features encountered in connection with routine operations, including malfunction cases not considered in the other procedures section
(i.e., not considered to degrade safety). Material conforming to the above should be presented for each phase of flight, following in sequence from preflight through engine shutdown, and should include, but not be limited to, systems operation (including fuel system information prescribed in § 29.1585(b)), missed approaches, etc.
(2) Malfunction or Abnormal Procedures (Optional). Malfunction or abnormal procedures are included in many flight manuals to provide corrective crew actions that are not as urgent as those in the Emergency Procedures sections. These procedures are concerned with foreseeable situations, usually entailing a failure condition, in which the use of special systems, or the alternate use of regular systems, may be expected to maintain an acceptable level of safety. Typical examples of events considered to entail abnormal procedures are engine failure and or conditions that require an engine shutdown (under flight conditions where the failure is not critical), stopping and restarting engines in flight, extending landing gear or flaps by alternate means, approach in multiengine aircraft with inoperative engine(s), etc.
Page G - 47
(3) Emergency Procedures . Emergency procedures are concerned with foreseeable but unusual situations in which immediate and precise action by the crew, as detailed in the recommended procedures, may be expected to reduce substantially the risk of disaster. Typical examples of incidents considered to be emergencies are fire, ditching, loss of tail rotor thrust or control, etc. It is expected that, in the case of tail rotor failure, the emergency procedures will have been validated by analysis, simulation, or any relevant service experience. The analysis or simulation of the tail rotor control failure procedures may be validated where practical by limited flight test.
(4) Ditching Procedures . Amendment 29-12 added ditching standards to Part 29. When ditching approval is requested, appropriate procedures and information will be included in the manual. Scale model tests are generally used to prove autorotation “ditching” characteristics and to prove stability in the water (capsize threshold) of the rotorcraft type design. Many rotorcraft designs require emergency float bags that deploy either before water contact or shortly after water contact to provide the flotation and stability necessary to comply with the requirements.
(i) Autorotation altitudes and airs peeds and water contact information, if appropriate, derived from or used during the ditching model tests, should be confirmed during FAA/AUTHORITY flight tests and should be included in the manual. Information concerning sea states or wave heights to length ratios, investigated and found satisfactory, may be included in the manual if nonsevere sea states are likely to be exceeded.
(ii) Instructions for deploying life rafts may be needed for certain designs.
For example, if life rafts are stowed outside the cabin, special instructions may be necessary.
(5) Evacuation Procedures for Rotorcraft Litter Configurations. Appropriate procedures and minimum crew requirements should be considered and included in the manual or manual supplement, if necessary, to assure timely evacuation.
(6) The use of illustrations to show c ontrols, instruments, explain systems, etc., is encouraged.
AC 29.1587. § 29.1587 (Amendment 29- 24) PERFORMANCE INFORMATION.
a. Explanation .
(1) This section should contain t he performance information necessary for operation in compliance with applicable performance requirements of Part 29 and applicable special conditions, together with additional information and data essential for implementing pertinent operational requirements.
Page G - 48
(2) Performance information and dat a may be presented for the range of weight, altitude, temperature, and other operational variables stated as operational performance limitations. Performance information which exceeds any operating limitation should be shown only as required for clarity of presentation. If data beyond operating limits are shown, the limits should be clearly marked and the data outside of the limits clearly distinguishable from the data within the limits.
(3) Performance information present ed in the unapproved or “manufacturers’ data” section of the RFM should not include performance data that are beyond operating limitations unless the particular operating limit that may be exceeded is clearly distinguishable from similar performance data that are within limits. For example, if the weight-altitude-temperature (WAT) limits for takeoff and landing are based on inground-effect (IGE) hover performance capability at a 5-foot skid height, 3-foot skid height hover performance data allowing increased hovering weights should not be presented in the manufacturers’ data unless clearly identified as being beyond operating limitations for normal operations. It is recommended that performance information and data be presented substantially in accordance with the following paragraphs. Where applicable, reference to the appropriate requirement of the certification or operating regulation should be included.
(i) General . Include all descriptive information necessary to identify the configuration and conditions for which the performance data are applicable. Such information may include the complete model designations of rotorcraft and engines, definition of installed rotorcraft features, and equipment that affects performance together with the operative status thereof. This section should also include definitions or terms used in the performance section (i.e., IAS, CAS, ISA, configuration, CDP, VTOSS, Category A, Category B, LDP, etc.) plus calibration data for airspeed, altimeter, ambient air temperature, and other information of a general nature.
(ii) Performance Procedures . The procedures, techniques, and other conditions associated with obtainment of the flight manual performance should be included. The procedures may be presented as a performance subsection or in connection with a particular performance graph. In the latter case, a comprehensive listing of the conditions associated with the particular performance may serve the objective of “procedures” if sufficiently complete. Performance figures are based on the installed minimum specification engine, unless normally depreciated engine performance is approved.
(iii) Wind Accountability . Wind accountability may be utilized for determining takeoff and landing field lengths. This accountability may be up to 100 percent of the minimum wind component along the takeoff or landing path opposite to the direction of takeoff. Wind accountability data presented in the RFM should be labeled “UNFACTORED” (if 100 percent accountability is taken) and should be accompanied by the following note: “Unless otherwise authorized by operating regulations, the pilot is not authorized to credit more than 50 percent of the
Page G - 49 performance increase resulting from the actual headwind component and must reduce performance by 150 percent of the performance decrement resulting from the actual tail wind component.” In some rotorcraft, it may be necessary to discount the beneficial aid to takeoff performance for winds from zero to 10 knots. This should be done if it is evident that the winds from zero to 10 knots have resulted in a significant degradation to the takeoff performance due to flight through the main rotor vortex. Degradation may be determined by determining the power required to fly, by reference to a pace vehicle, at speeds of 10 knots or less.
(iv) The following list is illustrative of the information that should be provided for a transport Category ”A” and “B” rotorcraft.
(A) Density altitude chart for conv erting from pressure to density altitude.
(B) Temperature conversion chart (°C to °F to °C).
(C) Airspeed calibration (calibrated vs. indicated airspeed) for both pilot and copilot systems for level flight, climb, autorotation, and recommended approach rate of descent.
(D) Altimeter correction for p ilot and copilot instruments showing the correction factor vs. indicated airspeed at sea level and altitude.
(E) Hover performance charts both in and out-of-ground (OGE) effect with instructions for their use. The OGE hover performance chart is not required but may be useful.
(F) A series of climb performance charts for various weights showing rate of climb vs. pressure altitude for a range of temperatures and showing the variation of best rate of climb speed with pressure altitude. The conditions should appear on each chart (i.e., power, weight, single, or multiengine, etc.). The OEI climb performance charts at 30-minute power and maximum continuous power or at continuous OEI power should provide rate of climb performance down to a minimum of -500 feet/min. The effect of engine air bleed, particle separators or other devices, on the rate of climb/descent performance must be provided.
(G) A chart showing the takeoff flight path for Category A presented in height vs. distance from the hover wheel height to the point at which VTOSS and not less than 35 feet is reached, and the rejected takeoff distance. The chart should identify the critical decision point and VTOSS.
(H) Charts to allow calculation of distance to climb at V TOSS from the point at which VTOSS and not less than 35 feet is reached (or from the lowest point of the takeoff profile for elevated heliport) to 200 feet with one engine inoperative and other engines within approved operating limitations. If conservative, providing charts to allow calculation of the total distance from VTOSS and 35 feet to VY and 200 feet is allowed.
Page G - 50
(I) A series of charts to allow calculation of any additional distance which may be required to accelerate to best rate of climb speed from VTOSS with one engine inoperative and other engines within approved operating limitations. If conservative, providing charts to allow calculation of the total distance from VTOSS and 35 feet to VY and 200 feet is allowed.
(J) Charts to allow calculation of distance to climb at V Y from 200 feet to 1000 feet above the takeoff surface (or from the lowest point of the takeoff profile for elevated heliport) with one engine inoperative and other engines at 30-minutes OEI power or maximum continuous OEI power. If conservative, providing charts to allow calculation of the total distance from VTOSS and 35 feet to VY and 1000 feet is allowed.
(K) Landing distance chart for Category A showing the landing distance from a 50-foot height (25-foot for VTOL operations from an elevated heliport) to a stop with one engine inoperative vs. pressure altitude over the range of temperatures being certified. This chart should identify the balked landing decision point (LDP) so the pilot will know how to achieve this performance.
(L) For Category B, a series of c harts at various weights showing takeoff distance from hover to 50 feet vs. pressure altitude over the range of temperatures being certified.
(M) For Category B, a landing distance chart similar to the one for Category A from a 50-foot height to stop with one engine inoperative.
(N) For turbine-powered rotorcraft in all categories, a power assurance check chart.
(O) For Category B, a statem ent of the maximum crosswind and downwind components that have been demonstrated as safe for operation near the ground unless this information is incorporated as an operating limitation. (See paragraph AC 29.1583.)
(P) For Category B, the height-vel ocity (HV) envelope except for rotorcraft which must incorporate the HV diagram as an operating limitation.
(Q) For Category B, the autorot ative glide distance as a function of altitude if required by § 29.71. (See paragraph AC 29.71.)
(v) Miscellaneous Performance Data. Any performance information or data not covered in items (A) through (Q) above, but considered necessary to enhance safety or to enable application of the operating regulations, should be included.
Page G - 51 AC 29.1587A. § 29.1587 (Amendment 29- 40) PERFORMANCE INFORMATION.
a. Explanation . Amendment 29-40 added a requirement to provide the steady gradient of climb for each weight, altitude, and temperature for which Category A performance is presented. No minimum climb gradient has been required.
b. Procedures . No additional flight testing is required beyond that for compliance with the Category A performance requirements. Climb gradient data should be calculated and presented for all weights, altitudes, and temperatures for which takeoff data is scheduled. Gradients should be established for the first and second segment climb under the conditions specified in § 29.67(a)(1) and (a)(2).
AC 29.1589. § 29.1589 LOADING INFORMATION .
a. Explanation . Control of the rotorcraft weight and balance is an operational function, and is the responsibility of the operator. However, instructions necessary to enable loading of the rotorcraft within the established limits of weight and center of gravity, and to maintain the loading within such limits are required by the operating regulations, and inclusion of such loading instructions in the Rotorcraft Flight Manual is required by § 29.1583(c). Approved loading instructions, therefore, must be presented in the Rotorcraft Flight Manual, and at the option of the applicant, may be included in the approved portion or may be included in the unapproved portion.
b. Procedures .
(1) For the purpose of the flight m anual, distinction is made here between the loading instructions required by the certification requirements of Part 29, and the weight and balance data required by the operating requirements. The former prescribed information is applicable to the rotorcraft type, and is subject to FAA/AUTHORITY approval as flight manual material.
(2) For compliance with the noted requi rements, it is necessary for the applicant to develop weight and balance data and loading instructions as necessary to satisfy the needs of both certification and operation. In order to consolidate in one document information on rotorcraft loading, however, it is recommended that the weight and balance data be developed to include appropriate loading instructions, and that both be included in the Rotorcraft Flight Manual as an “unapproved” section entitled, “Weight and Balance.” Such a section should include the following statement as a note:
“In accordance with FAA/AUTHORITY procedures, the detail weight and balance data of this section are not subject to FAA/AUTHORITY approval. The loading instructions of this section, however, have been approved by FAA/AUTHORITY as satisfying all requirements for instructions on loading of the rotorcraft within approved limits of weight and center of gravity, and on maintaining the loading within such limits.”
Page G - 52
(3) An actual or specimen weight and balance section should be included in the initial submittal of the manual. Weight and balance data for each particular rotorcraft need not be submitted as flight manual material.
(4) The weight and balance material out lined below is believed to be adequate for rotorcraft with conventional loading and fuel-management techniques. For rotorcraft which necessitate redistribution of fuel (other than normal consumption) to maintain loading within prescribed limits, the material should be amplified as necessary.
(i) Weight Limits . Contained in limitations section of the flight manual.
(ii) Center of Gravity Limits . Contained in the limitations section of the flight manual.
(iii) Dimensions and Datum Line Locations . The dimensions and relative location of rotorcraft features associated with weighing and loading of the rotorcraft and with weight and balance computations should be described and/or illustrated.
(iv) Equipment List . The rotorcraft should be defined or described sufficiently to identify the presence or absence of optional systems, features, or installations that are not readily apparent. In addition, all other items of fixed and removable equipment included in the empty weight should be listed.
(v) Fuel and Other Liquids . Fuel and other liquids, including passengerservice liquids that are included in the empty weight, should be identified and listed together with information necessary to enable ready duplication of the particular condition.
(vi) Weight Computations . Computations of the empty weight and emptyweight CG location should be included.
(vii) Empty Weight and Empty-We ight Center of Gravity Location.
Statement of these values should be included.
(viii) Loading Schedule . Loading schedule should be included, if appropriate.
(ix) Loading Instructions . Complete instructions relative to the loading procedure, or to use the loading schedule, must be included.
(x) Special Consideration . Consideration should be given to the lateral center-of-gravity loading instructions when various kits such as a side mounted hoist are installed.
Page MG 1 - 1 CHAPTER 3
AIRWORTHINESS STANDARDS
TRANSPORT CATEGORY ROTORCRAFT
MISCELLANEOUS GUIDANCE (MG)
AC 29 MG 1. CERTIFICATION PROCEDURE FOR ROTORCRAFT AVIONICS EQUIPMENT .
a. Pre-Test Requirements .
(1) General . This test guideline has been prepared as an aid in the evaluation of rotorcraft avionics (aviation electronics) equipment installations. The criteria presented are not to be considered exclusive, but are offered as one method of evaluating design practice and performance. The testing and qualification of an electronic installation should be considered as consisting of three phases:
preinstallation, ground, and flight. The amount of testing necessary during each phase will vary with the amount of testing performed on previous phases. For example, if a system is TSO’d, the preinstallation performance is probably substantiated and therefore the ground and flight testing can be reduced accordingly. Also, a thorough ground testing program should result in reduction in necessary flight testing. When the operating or airworthiness regulations require a system to perform its intended function, the use of TSO’d equipment or the submission of data substantiating the equipment performance is strongly recommended.
(2) Regulatory References . Sections 29.1301, 29.1309, 29.1329, 29.1331,
29.1333, 29.1355, 29.1431, 29.1457.
(3) System Design . Systems or equipment presented for installation approval, when not qualified by TSO or other approval means, should be accompanied by sufficient data to substantiate their design acceptability.
(i) Operation of Controls . The operation of controls intended for use during flight, in all possible position combinations and sequences, should not result in a condition that would be detrimental to the continued safe performance of the system.
(ii) Electrical Shock . Systems should be designed so that under all probable conditions the risk of dangerous electrical shock is minimized.
(iii) Fire Hazard . The design of the system should be such that all components meet the applicable fire and smoke protection requirements of §§ 29.853 and 29.863. Cables and equipment to be installed in designated fire zones, that are used during emergency procedures should be at least fire resistant.
(iv) Plugs and Cables . Connector pins for sensitive signal circuits should not be adjacent to pins used for AC power circuits. When redundant wiring is used to
Page MG 1 - 2 comply with the systems independence regulations such as §§ 29.1331, 29.1333, or
29.1355, the wires should be routed through separate plugs and/or cables with as much physical separation as practicable. The system should be designed so that incorrect mating of plugs is not possible. Cable grounding and shielding techniques should be used to minimize electromagnetic interference.
(4) System Performance . Where the operating or airworthiness regulations require a system to perform its intended function, and when the equipment is not qualified by TSO or other approval means, performance data furnished to the FAA/AUTHORITY can reduce the installed performance testing. The appropriate TSO minimum performance standard may be used as a guide.
(i) Environment . An appropriate means for environmental testing is set forth in Radio Technical Commission for Aeronautics (RTCA) document DO-160. The applicant should submit test reports showing that the laboratory tested categories such as temperature, vibration, altitude, etc., are compatible with the environmental demands to be placed on the rotorcraft.
(ii) Failure Analysis . Procedures are contained in paragraph AC 29.1309, section c of this advisory circular.
(5) Installation Design
(i) Mechanical Installation . Installations should be made to (1) ensure compliance with the airworthiness regulations and (2) comply with the equipment manufacturer’s recommendations. The designer should observe good engineering practices in specifying material type, thickness, fastener type, edge distance, and attachment to the equipment rack. By analysis or static tests the mounted equipment should be shown to withstand the inertia forces of §§ 29.561(b)(3) and 29.337. Refer to AC 43.13-2a for static test procedures.
(ii) Arrangement and Visibility . The mounting position of all instruments, switches, position labels, and control heads should make them plainly visible to the pilot while in his normal panel-facing position and under all cockpit lighting conditions likely to occur. TSO approval does not assure instruments will be acceptable in a particular cockpit installation or for all lighting conditions. The instruments, switches, and placarding must be free from reflections. Malfunction annunciation devices should be conspicuous and clearly visible to the pilot. (See Advisory Circular 20-69 and §§ 29.1321, 29.771, 29.1381, and 29.1555(a).)
(iii) Load Analysis .
(A) Power Sources . It should be determined whether the electrical power source capacity is adequate for the system installation under all foreseeable operating conditions including engine failure on multiengine rotorcraft. System load reductions should be applied or power source capacity increased if necessary to assure
Page MG 1 - 3 compatibility between load and source. Duplicate systems should be powered from separate buses and, in some cases, from independent sources if required by the airworthiness regulations. (Sections 29.1309, 29.1331, 29.1333, 29.1351, or 29.1355.)
(B) Navigation Cour se Deviation Circuit Loading. It should be determined that the deviation circuit source impedance is matched by its load and that the source capacity is not exceeded. When the system is capable of transfer, the transfer loads should also be considered (§ 29.1301).
(C) Malfunction Indicator Circuit Loading . It should be determined that the malfunction indicator source impedance is matched by its loads and that the source capacity is not exceeded. When the system is capable of transfer, the transfer loads should also be considered (§ 29.1301).
(D) Synchro Signal Loading . When parallel loads are added to Synchro’s, the manufacturers’ specifications should be reviewed to assure that the additional loads do not result in an overloaded synchro.
(iv) Interface . In many cases, the mating units of a system are designed by different manufacturers. For example, a brand-X gyro may be designed for operation with a brand-X flight director, but later a modifier decides to operate a brand-Y autopilot with the brand-X gyro. This applies just as well to NAV receivers, AREA NAV units, course indicators, omni bearing selectors, tachometer indicators, transmitters and many other equipment items. When this is the case, the applicant should provide data, in summarized form, describing those characteristics such as impedance, volts, etc., that are necessary to assure a compatible and reliable system. The data should also reference the source of the interface data (§ 29.1301).
(v) Flight Tests . An FAA/AUTHORITY engineering flight test is required during type certification or after modification that changes the established limitations, flight characteristics or performance of a rotorcraft or any of its required systems or operating procedures. New installations of equipment in the cockpit or modifications that affect existing equipment in the cockpit should be evaluated by appropriate flight test personnel, if it is necessary to evaluate operational aspects of the change. Where possible, cockpit arrangement, placards, markings, instrument visibility, and light reflections can be evaluated on the ground if the applicant opts to darken the windows.
Electromagnetic compatibility functional checks, windshield glare, and pilot workload evaluations may be conducted in flight at the FAA/AUTHORITY flight test pilot’s option.
(vi) Radio Master Switches . Some installations incorporate radio master switches to control special busses for the avionics systems. If this capability is provided it should be evaluated to assure failure modes are not introduced that will result in excessive or even total loss of all required avionics. One switch that controls all required avionics is not considered acceptable for IFR installations. The evaluation should include an assessment of the loss of the systems to be included on the radio master switch(es), and the subsequent effect on continued safe flight.
Page MG 1 - 4
b. Test Procedures . Where the airworthiness or operating regulations require a system to perform its intended function, and/or not create a hazard to other required systems, sufficient testing should be accomplished to assure satisfactory performance.
When ground testing is not sufficient to properly evaluate a system’s performance, flight testing should be accomplished. Acceptable flight test criteria for specific navigation and communication equipment are contained herein. If the rotorcraft is to be approved for IFR operations, the additional criteria of AC 29 Appendix B should be satisfied.
(1) VHF Systems .
(i) General . Intelligible communications should be provided between the rotorcraft and ground facilities throughout the airspace within 100 NM of an FAA/AUTHORITY ground facility from radio line of sight altitude to the maximum altitude for which the rotorcraft is certificated. Communication should be provided with the rotorcraft at or above line of sight altitude in right and left bank up to 10 degrees and on all headings.
(ii) Electromagnet ic Compatibility (EMC). With all systems operating in flight, verify by observation that no adverse effects are present in the flight systems.
(iii) Antenna Measurement . If satisfactory antenna measurement data are provided, the following flight test may be reduced to checks in right and left turns in the vicinity of the predicted bearings of worst performance. If antenna locations are symmetrical, tests may be conducted using only one direction of turn.
(A) Long Range Reception . Starting at a distance of at least 100 NM from the ground facility antenna, perform a right and/or left 360 degree turn at a bank angle of at least 10 degrees. Communicate with the ground facility every 10 degrees of turn to test the intelligibility of the signals received at the ground station and in the rotorcraft.
For 100 NM, the minimum line of sight altitude is approximately 7,000 feet.
(B) Approach Configuration . With the landing gear down and with the rotorcraft in the approach configuration (at a distance of 10 NM from the ground station and in an idle power descent toward the station), demonstrate intelligible communications between the rotorcraft and the ground facility.
(2) HF Systems .
(i) Acceptable communications shou ld be demonstrated by contacting a ground facility at a distance of at least 100 nautical miles. Single sideband equipment should also perform acceptably in the amplitude modulation mode of operation.
(ii) It should be demonstrated that pr ecipitation static is not excessive when the aircraft is flying at cruise speed (in areas of high electrical activity, including