Service difficulty reports · 3
Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model.
SDR 96ZZZX3016Transducer · failedTRANSDUCER WAS INSTALLED IN THE AIRCRAFT, TESTED, AND REMOVED WITH ZERO HOURS SINCE OVERHAUL. UNIT WAS REMOVED DUE TO EPR INDICATION WOULD STICK AT 2.0 AND WOULD NOT CHANGE WITH CHANGES IN ENGINE POWER SETTING. UNIT WAS OVERHAULED 3-29-96. SUBMITTER STATED SDR 96ZZZX750Vane · debondingUNDER NORMAL OPERATING CONDITIONS, THE PROTECTIVE COATING IS DEBONDING FROM THE SURFACE (LEADING EDGE) OF NEW VANES. DEFECT WAS FOUND BY BORESCOPING THE ENGINE.SDR 95ZZZX4609Valve · defectiveVALVE WAS REMOVED FROM AIRCRAFT DUE TO INTERNAL BYPASSING CAUSING HYDRAULIC PUMP TO CYCLE CONTINUOUSLY. UNIT TIME IN SERVICE SINCE REPAIR: 37.3 HRS. SUBMITTER STATED LOW-TIME FAILURES OF THESE UNITS HAS BEEN COMMON IN FLEET OF 17 AIRCRAFT. INTERNAL BYPASSI