Service difficulty reports · 66
Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model.
SDR RYNA2013012200002Pump · failedLEFT AFT BOOST PUMP FAILED INFLIGHT. PLACED ON MEL 28-22-1 CAT C DDD 1 FEB 2013. ISSUED DMI 3025. SUPPLEMENTAL REPORT TO FOLLOW.SDR RYNA2013012100001Scavenge Pump · leakingNR 1 ENGINE OIL SCAVENGE PUMP LEAKING. REPLACED OIL SCAVENGE PUMP IAW AMM 79-21-00 P 401. OPERATIONAL AND LEAK CHECK NORMAL. INSPECTED MASTER CHIP DETECTOR PER AMM 79-21-10.SDR RYNA201211260040Door · bentON POSTFLIGHT NOTICED RIGHT MAIN GEAR TRUNNION PANEL (DOOR) BENT. ACCOMPLISHED TEMP (INTERIM) REPAIR IAW DER ENGINEERING DRAWING 52-12548-1, 8110-3 APPROVAL DATED 22 NOV 2012. REPETITIVE INSPECTIONS AT A CHECK INTERVALS AND PERMANENT REPAIR AT C CHECK.
See all 66 reports