20000713035089I

Incident

FAA incident report · EMB EMB-145 · Pittsburgh, PA · July 13, 2000

Date
July 13, 2000 · 10:35 local
Place
Pittsburgh, PA
Airport
Greater Pittsburgh International
Phase of flight
Normal Cruise
Operating rules
Air carrier (Part 121)
Operator
CHQA
Aircraft
N265SK
Reported as
EMB EMB145
Reported engine
Allison AE3007A
People aboard
22
Fatal injuries
0
Pilot’s flight hours
5,800 total90 in this make and model90 in the last 90 days

From the FAA’s Accident/Incident Data System (AIDS), through its Aviation Safety Information Portal, as reported. The NTSB investigates accidents separately, and its record of an accident is the fuller one. The aircraft is matched to the registry by N-number and event date, checked against the reported make and model; the registry’s history has gaps, so older matches can be wrong. Compare the reported make and model.

What happened

The FAA’s narrative, in sentence case. The FAA writes it in capitals and removes private details.

(-23)On July 13, 2000, at 1035E, chqa flight 4870, an Emb-145, registered as N265SK, S/N145-226, diverted to "pit" after the "in flight" shutdown of the #1 engine. In cruise flight, they received a low oil pressure light. The crew followed the checklist, landed at "pit", and taxied to the gate without incident. The aircraft showed two quarts of oil when checked at the gate. The engine was serviced and test run by maintenance. They lost approximately four quarts in 15 mintues. The engine was removed and shipped to "ida". The pmi will follow the repairs. A replacement was installed, and the aircraft was returned to service. Investigation by desk audit/field inspections and closed.

As the FAA filed it

(-23)ON JULY 13, 2000, AT 1035E, CHQA FLIGHT 4870, AN EMB-145, REGISTERED AS N265SK, S/N145-226, DIVERTED TO "PIT" AFTER THE "IN FLIGHT" SHUTDOWN OF THE #1 ENGINE. IN CRUISE FLIGHT, THEY RECEIVED A LOW OIL PRESSURE LIGHT. THE CREW FOLLOWED THE CHECKLIST, LANDED AT "PIT", AND TAXIED TO THE GATE WITHOUT INCIDENT. THE AIRCRAFT SHOWED TWO QUARTS OF OIL WHEN CHECKED AT THE GATE. THE ENGINE WAS SERVICED AND TEST RUN BY MAINTENANCE. THEY LOST APPROXIMATELY FOUR QUARTS IN 15 MINTUES. THE ENGINE WAS REMOVED AND SHIPPED TO "IDA". THE PMI WILL FOLLOW THE REPAIRS. A REPLACEMENT WAS INSTALLED, AND THE AIRCRAFT WAS RETURNED TO SERVICE. INVESTIGATION BY DESK AUDIT/FIELD INSPECTIONS AND CLOSED.

Other reports on N265SK · 1

Matched to the same aircraft by N-number and date.