JASC 5310
Service difficulty reports · 38,528
Reports filed under 5310 · Fuselage Main, Structure, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5310' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5310' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR R61A202204190077Seat Track · corrodedCORROSION FOUND AT UPPER FLANGE BTW FR 13 AND FR 14 RH I/B SEAT TRACK. R&R IAW EMB 170/175 SRM 53-10-10.SDR SWAA2022050290217Web · corrodedCORROSION ON AFT CARGO BAY THRESHOLD AT RBL 25 BS 787+11; BS 787+13; BS 807+2; BS 827+2; BS 827+8. / [01] ENTERED MEASUREMENTS;[02] SRM 53-60-15-1A-1 ALLOWABLE DAMAGE 1 IS APPLICABLE FOR THIS AIRCRAFT.<BR><BR>REMOVED CORROSION DAMAGE IAW SRM 51-10-02-0G-0.;[03SDR SWAA2022050290344Web · corrodedCORROSION ON WEB AT AFT WET AREA BS986+8 RBL39 WL208. / [01] REMOVED CORROSION ON WEB AT BS986+8 RBL39 WL 208 IN A 1.5'X1.5'X.005 ORIGINAL THICKNESS .020 OUT OF LIMITS PER SRM 53-70-51-1A-1STEP 4-C 2 FIG 103;[02] REMOVED WEB AT BS 986 TO 1016; RBL 37 TO RBL 47SDR SWAA2022042790196Intercostal · crackedCRACKED INTERCOSTAL AT BS 294.5-312; RBL 15; WL 208.1. INSTALLED FOD PROTECTION FROM BS277 - BS328, BL 0 - RBL 30, WL 198 IAW AMM 20-60-07-913-801. REMOVED ALL FASTENERS FROM INTERCOSTAL IAW SRM 51-40-02-0G-0. REMOVED STIFFENER AT BS 312 RBL 24 AND INTERCOSSDR FDEA202203310795Door Frame · corrodedFUSELAGE CUT-OUT FOR ACCESS DOOR 313AL AFT FRAME CORRODED. EVALUATED CORROSION AT FUSELAGE CUT-OUT FOR ACCESS DOOR 313AL AFT FRAME AND FOUND TO BE CORRODED 100% OUT OF LIMITS IAW SRM 53-00-02-1A FIG. 101 DET.II, REMOVED AND REPLACED OUTER CHORD FX148N1601-SDR SWAA2022050489881Stringer · crackedCRACK STRINGER 15L LOCATED BETWEEN BS294.5 TO BS303.9 AT PASSENGER CABIN 2022-165275 / [01] TOOL USED: ULTRASONIC EQUIPMENT P/N: 45MG; S/N: 130060401; DUE DATE: 22-APR-22.;[02] TOOL USED: EDDY CURRENT EQUIPMENT; P/N: NORTEC500D; S/N: N500X12101V022240; CAL DUESDR AALA202204129245None · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT LEFT PASSENGER / CREW DOOR CUT OUT LOWER SILL AT FR 68 AND S23L. REPAIRED LOWER SILL PER SRM 53-41-14-300-001 PRINCIPLE #7.SDR CALA2022033100848None · none(A3NB-53-3-6299) FRAME 68 INBD FLANGE HAS CORROSION JUST ABOVE F LOOR LEVEL. (DOT 74-26 MARKED) () OF THE LATEST REV OF ECRA 5341-01305 ON OR BEFORE ACFT REACHES THERAFTER 47291TFC. PERFORM REPEAT INSP AT INTERVALS NOT TO EXCEED 16400FC ACCOMPLISHED INTERIM RESDR DALA2022033002132Window Frame · crackedSHIP 3269 CRACK INDICATION ON FRAME 2 WINDSHIELD CENTER POST LOWER ATTACHMENT AREA CONTINUITY FITTING LH SIDE. CORRECTIVE ACTION: COMPLIED WITH ER/A 597259-14AD REV. ORIGINAL. (2176481)SDR FDEA202203290979Seat Track · corrodedMAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE - SEAT TRACK CORRODED, BETWEEN STA1600 AND STA1620, LBL60 REPAIRED MAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE - SEAT TRACK, BETWEEN STA1600 AND STA1620, LBL60 PER B757 SRM53-00-52-2R REPAIR 1. THIS IS CATEGORY ASDR SIMA20220329008Floorbeam · corrodedSSI 53-10-027 FWD GALLEY L/H FLOOR DOUBLER CORRODED AT NUT PLATE HOLE ON FR 19.(LEVEL 2 CORROSION)-C/A-REMOVED AND REPLACED FWD GALLEY LH FLOOR DOUBLER AT FR 19 IAW EMB 175 SRM 51-40-08, 51-41-02, 51-43-04, AND 51-45-00.SDR SIMA20220329006None · corrodedSSI 53-23-005 AFT LAV FLOOR STRUCTURE CENTER SHEAR PANEL IS CORRODED.(LEVEL 2 CORROSION)-C/A-REMOVED AND REPLACED AFT LAV FLOOR STRUCTURE CENTER SHEAR PANEL IAW EMB 175 SRM 51-40-08.SDR SIMA20220329007None · corrodedSSI 53-23-005 AFT LAV FLOOR STRUCTURE RIGHT SPLICE AT FR 90 IS CORRODED (MARKED) (LEVEL 2 CORROSION) -C/A-REMOVED AND REPLACED AFT LAV FLOOR STRUCTURE RIGHT SPLICE AT FR 90 IAW EMB 175 SRM 51-40-08.SDR SIMA20220329005None · corrodedSSI 53-10-027 FWD GALLEY R/H FLOOR SILL CORRODED.(LEVEL 2 CORROSION) -C/A-REMOVED AND REPLACED FWD GALLEY R/H FLOOR SILL IAW EMB 175 SRM 51-40-08.SDR SIMA20220329004Floor Splice · corrodedSSI 53-10-027 FWD GALLEY L/H SHEER PLATE CORRODED AT NUT PLATE HOLE AT FRAME 16.(LEVEL 2 CORROSION) -C/A-REMOVED AND REPLACED FWD GALLEY L/H SHEER PLATE IAW EMB 175 SRM 51-40-08.SDR SIMA20220329003None · noneSSI 53-23-005 AFT GALLEY FLOOR STRUCTURE RIGHT SHEAR PANEL IS CORRODED.(LEVEL 2 CORROSION)-C/A-REMOVED AND REPLACED AFT GALLEY RIGHT SHEAR PANEL IAW EMB 175 SRM 51-40-08.SDR SIMA20220329002None · noneAFT LAV FLOOR STRUCTURE RIGHT PANEL SUPPORT IS CORRODED AT FR 89 AND 90.(LEVEL 2 CORROSION)-C/A-REMOVED AND REPLACED AFT LAV FLOOR STRUCTURE RIGHT PANEL SUPPORT IAW EMB 175 SRM 51-40-08.SDR SWAA2022040690269Dump Valve · corrodedCORROSION ON AFT LAV DUMP VALVE PAN ASSY / [01] REMOVED & REPLACED AFT LAV DUMP VALVE PAN ASSY REF SRM 51-40-02;[02] CORRECTED POTENTIAL CORROSION LEVEL ();[03] REPAIR ACCOMPLISHED ON EA-153-00959-W1P1.;[04] COMPLIED WITH;[05] REPAIR WAS COMPLETED IAW EA 22-15SDR CALA2022033100828None · noneRH PRESSURE PANEL FR 35/36 HOLES 3,4,13,14,15,20,22,23,27,28 HAV E CRACK INDICATION. GENERATED BY V061682 ON HAECO LCQ NR 9298423 /30423 AIRS ARE CAT -B- MAJOR REPAIR. START/FINISH DIMENSIONS ARE LISTE NSPECTION PER PART 2 OF THE LATEST ECRA 5331-02868 ON OR BSDR DALA2022033002120Door Frame · crackedSHIP 3259 CRACK INTERNAL STRUCTURE AFT FRAME SEGMENT LOCATED ON EMERGENCY EXIT DOOR 843 IN PASSENGER CABIN. CORRECTIVE ACTION: REPLACED FWD FRAME SEGMENT OF EMERGENCY EXIT DOOR PER A320 SRM 51-42-11 AND 51-72-11. (2175740)SDR IXXA2022032900002Support · corrodedCORROSION ON SUPPORT STATION 1417 BL0SDR SWAA2022042088616Angle · crackedFWD SERVICE DOOR FWD LOWER STUB BEAM O/B ANGLE CRACKED BS294.5 RBL 58 WL 210 FWD SERVICE DOOR FWD LOWER STUB BEAM CRACKED BS294.5 RBL 58 WL 210 / [01] REMOVED FWD SERVICE DOOR FWD LOWER STUB BEAM O/B ANGLE FROM BS 294.5; RBL-58; WL- 210 IAW SRM 51-40-02-0G-0;[SDR SIMA20220328001Seat Track · corrodedSSI 53-22-012 - RH CENTER SEAT TRACK IS CORRODED BTW FR 83-85. (MAJOR REPAIR) (LEVEL 2 CORROSION)-C/A-REMOVED AND REPLACED RH CENTER SEAT TRACK IAW EMB-175 SRM 51-40-08, EMB-175 SRM 51-41-01 EMB-175 SRM 51-43-03, EMB-175 SRM 51-43-04 EMB-175 SRM 51-21-01, EMB-SDR CALA2022033100821None · noneAFT WET AREA AT R2 DOOR STRINGER 23RT HAS FOUR EACH HOLES OVER S IZED ON HORZ FLANGE AFT OF FR68, GENERATED AT HAECO LCQ PER NR92 98484 (30484) BY V052030. REMOVED AND REPLACED AFT CABIN STRINGER 23 RT AFT OF FRAME 68 IA W A320 SRM 51-72-11. PERFORMED BY V9252SDR FDEA202203280720None · noneMAIN CABIN SEAT TRACK SCALLOP IS GOUGED LBL0 AT APPROX STA 1013 ACCOMPLISHED FEDEX EA# F-5310-T0367542 : FUSELAGE - MAINFRAME - SEAT TRACK STA 1013, BL 0, SPLICE REPAIRSDR SIMA20220327006Seat Track · gougedL/H CENTER SEAT TRACK GOUGED BETWEEN FRAMES 78-79 (MAJOR REPIAR) -C/A-RAR LH CENTER SEAT TRACK AT FRAMES 78-79 IAW EMB 175 SRM 51-40-08, 51-41-01, 51-43-03, AND 51-43-04SDR SIMA20220327005Track · gougedLH FLOOR SEAT TRACK GOUGED AT FR 23-24 (MARKED).(MAJOR REPAIR)-C/A-RAR LH FIRST CLASS SEAT TRACK BEAM BETWEEN FR 23-34 IAW EMB-175 SRM 51-40-08.SDR SIMA20220327004Track · gougedRH FLOOR SEAT TRACK GOUGED AT FR 25-26 (MARKED) (MAJOR REPAIR)-C/A-RAR RH FLOOR SEAT TRACK BEAM BETWEEN FR 23-34 IAW EMB-175 SRM 51-40-08. REFER TO NRTC E910856 FOR REINSTALLATION OF BEAM SPLICE BETWEEN FR 22-23.SDR DALA2022032802048Crossbeam · bentSHIP 3270 BENT INTERNAL STRUCTURE CROSS BEAM AT LEVEL FR30 AND BTW STRG 38RH AND STRG44 IN FWD CARGO COMPARTMENT. CORRECTIVE ACTION: REPLACED CROSS BEAM PER A320 SRM 51-42-11 AND 51-72-11. (2173015)SDR DALA2022032802047Crossbeam · bentSHIP 3270 BENT INTERNAL STRUCTURE CROSS BEAM AT LEVEL FR 26 AND BTW STRG38LH AND STGR41RH IN FWD CARGO COMPARTMENT. CORRECTIVE ACTION: REPLACED CROSS BEAM PER A320 SRM 51-42-11 AND 51-72-11. (2173010)SDR SIMA20220326010Track · corrodedSSI 53-23-005; RIGHT CENTER SEAT TRACK IS CORRODED BETWEEN FRAMES 84-85 (LEVEL 2 CORROSION) (MAJOR REPAIR)-C/A-REMOVED AND INSTALLED AFT RH CENTER SEAT TRACK BEAM IAW EMB 175 SRM 51-40-08, SRM 51-43-08, SRM 51-43-04, AND SRM 51-41-01SDR SIMA20220326007Panel Support · corrodedSSI 53-23-005; RH OTBD PANEL SUPPORT IS CORRODED BETWEEN FRAMES 89-90 (LEVEL 2 CORROSION)-C/A-RAR RH OTBD PANEL SUPPORT BETWEEN FR 89-90 IAW ERJ 175 SRM 51-40-08SDR SIMA20220326006Floorbeam · corrodedSSI 53-23-005; LH CENTER BEAM UPPER SHEET IS CORRODED BETWEEN FRAMES 85-86. (LEVEL 2 CORROSION)-C/A-REMOVED AND REPLACED LH CENTER BEAM UPPER SHEET BETWEEN FRAMES 85-86 IAW EMB-175 SRM 51-40-08SDR SIMA20220326005Floor Skin · corrodedSSI 53-23-005; RH CENTER BEAM UPPER SHEET IS CORRODED BETWEEN FRAMES 85-86 (LEVEL 2 CORROSION)-C/A-REMOVED AND REPLACED RH CENTER BEAM UPPER SHEET BETWEEN FRAMES 85 AND 86 IAW EMB-175 SRM 51-40-08SDR SIMA20220326003Splice Plate · corrodedSSI 53-23-005; CENTER SPLICE IS CORRODED AT FRAME 90 (LEVEL 2 CORROSION) -C/A-RAR CENTER SPLICE AT FRAME 90 IAW EMB 175 SRM 51-40-08SDR SIMA20220326002Intercostal · corrodedSSI 53-23-005; RH INTERCOSTAL SPLICE IS CORRODED AT FRAME 90 (LEVEL 2 CORROSION) -C/A-RAR RH INTERCOSTAL SPLICE AT FRAME 90 IAW EMB 175 SRM 51-40-08SDR SIMA20220326004Gusset · corrodedSSI 53-23-005; R/H FLOOR BEAM SPLICE IS CORRODED AT FRAME 90 MAJOR REPAIR (LEVEL 2 CORROSION) -C/A-RAR R/H FLOOR BEAM SPLICE AT FRAME 90 IAW EMB 175 SRM 51-40-08SDR ANCF20220317016None · none26.MAR.2022 WO 54394182 => BIRD STRIKE
BIRD STRIKE DURING TO AT 800 FT ALL SYS OPERATION NORMAL LDG WT 65900KG NORMAL ENG PARAMETERS.
26.MAR.2022 WO 54394182 => IN ACCORDSANCE WITH AMM TASK 05-51-14-200-803 INSPECTION OF THE AIRFRAME AFTER BIRD STRIKE WASDR AALA202203285721Window Post · noneAIRCRAFT IN BASE MAINTENANCE: FLIGHT DECK FIRST OFFICERS #1 WINDOW POST REQUIRES REINFORCING MODIFICATION / REPAIR PER EO 5616J009-008. ACCOMPLISHED REINFORCING MODIFICATION / REPAIR OF THE FIRST OFFICERS #1 WINDOW POST PER EO 5616J009-008.SDR SIMA20220325009Track · gougedRH UPPER SEAT TRACK IS GOUGED AT FRAME 56 (MAJOR REPAIR)-C/A-COMPLETED SEAT TRACK SPLICE REPAIR AND INSTALLED 3 EA SPLICES ON RH UPPER SEAT TRACK AT FR 56 IAW EMB 175 SRM 53-00-10RE01SDR SWAA2022041988221Support Angle · crackedCRACKED INTERCOSTAL UPPER SUPPORT ANGLE STA 380-400; RBL 9; WL 208. / [01] REMOVED DAMAGED INTERCOSTAL UPPER SUPPORT ANGLE STA 380-400; RBL 9; WL 208 PER SRM 51-40-02-0G-0.;[02] LOCATED AND DRILLED NEW INTERCOSTAL UPPER SUPPORT ANGLE STA 380-400; RBL 9; WL 208SDR SWAA2022041988228Attach Angle · crackedCRACKED INTERCOSTAL UPPER ATTACH ANGLE STA B380-400; LBL 13; WL 208. / [01] REMOVED; LOCATED AND DRILLED NEW INTERCOSTAL UPPER ATTACH ANGLE BS380 - BS400 LBL 13 WL 208 IAW SRM 51-40-05-0G-0 AND DWG 143A5400. OK TO INSTALL;[02] VERIFIED CORRECTIVE ACTION 1.<BR>SDR SIMA20220325007Track · corrodedRH CENTER FLOOR BEAM IS CORRODED BETWEEN FRAMES 12-15 (MAJOR REPAIR) (LEVEL 2 CORROSION)-C/A-PERFORMED REPAIR DOUBLER AND FILLER ON RH CENTER FLOOR BEAM BETWEEN FRAMES 12-15 IAW EMB 175 SRM 53-10-10RE-01, FIGURE 202.SDR SIMA20220325006Doubler · corrodedSSI 53-10-027 L/H FLOOR DOUBLER IS CORRODED BETWEEN FRAMES 19 AND 20 (LEVEL 2 CORROSION)-C/A-REMOVED AND INSTALLED SERVICEABLE L/H FLOOR DOUBLER BETWEEN FRAMES 19-20 IAW EMB 175 SRM 51-40-08, 51-40-04,51-23-04,51-40-02SDR CALA2022032800796Seat Track · corrodedSUPPORT TASK, MAIN CABIN STA 730 RBL24 SEAT TRACK SUPPORT HAS CO RROSION, TRANSCRIBED FROM HAECO GSO NRC 9285765SDR CALA2022032800795Door Frame · cracked(SFR) FOUND CRACK ON RH EMERGENCY EXIT DOOR INTERIOR FRAME P/N: D5227902620200SDR KCSA202203251031Tension Tie · crackedSTA 1140 R/H HAS CRACK INDICATIONS IN UPPER AND LOWER O/B HOLES OF TENSION TIE TO FRAME CONNECTIONSDR AALA202203258112Window Frame · crackedAIRCRAFT IN BASE MAINTENANCE: FLIGHT DECK CAPTAINS #1 WINDOW FRAME CRACKED AT BS 217. REPAIRED WINDOW FRAME PER EO 5319J023-007.SDR AALA202203253551Window Frame · noneAIRCRAFT IN BASE MAINTENANCE: FLIGHT DECK FIRST OFFICERS #1 WINDOW FRAME REQUIRES REINFORCING MODIFICATION / REPAIR PER ECO 5319J023-008. ACCOMPLISHED REINFORCING MODIFICATION / REPAIR PER ECO 5319J023-008.SDR IXXA2022052406Stringer · crackedSTRINGER 24 AT STA 676 CRACKED
Back to JASC 5310