JASC 5310
Service difficulty reports · 38,573
Reports filed under 5310 · Fuselage Main, Structure, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5310' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5310' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR IPXA10558158Beam · damagedINSPECTION TYPE:2C, FOUND MECHANICAL DAMAGE ON TOP OF LONGITUDINAL BEAM AT STA 900 TO STA 905 ALONG LBL 46. REPAIRED IAW ER NR 10-1058 DATED 14-JAN-10. (B757-5310-36289-A)SDR HALA201001040001AStructure · crackedOPEN - FUSELAGE CRACKED AT STA 1022, 3 1/2" ABOVE LT PYLON. CRACK LENGTH 3/4". REPAIR IN WORK.SDR HALA2010010400009Structure · crackedFUSELAGE CRACKED AT STA 1022, 3 1/2" ABOVE LT PYLON. CRACK LENGTH 3/4". REPAIR IN WORK. OPENSDR SWAA100045Crease Beam · corrodedDURING SCHEDULED 22Y CHECK, FOUND RT CREASE BEAM CHORD CORRODED BETWEEN BS 259.5 TO BS 360. REMOVED AND REPLACED CHORD PER SRM.SDR QXEA2010010500004Door Frame · chafedC5 CHECK -THE FWD AND AFT UPPER CORNERS OF THE AFT BAGGAGE DOOR CUT OUT SHOW EVIDENCE OF CHAFING. CLEANED UP EDGES OF LIGHT CHAFE MARKS. MAX MATERIAL REMOVED .001" REF RD 8/4-53-505 STEPS 1-2. HFEC INSPECTED BLEND AREA FOR CRACKS IAW NDTM PART 6, 51-00-01-2SDR SWIA201023462Vertical Beam · crackedC-CHECK, AFT TOP RIGHT VERTICAL BEAM CRACKED AT FASTENER. REPAIRED PER REO.SDR C2XA10SH004Beam · corrodedSHV - DURING C-CHECK CARGO DOOR CUTOUT LOWER BEAM BETWEEN FRAMES 65-68 IS CORRODED (LEVEL 2 LOCAL). MAINTENANCE REMOVED AND REPLACED CARGO DOOR LOWER BEAM BETWEEN FRAMES 65-68 IAW EMB-145 SRM 51-40-02 AND EC5320-01456 ORIG. THE AIRCRAFT WAS APPROVED FOR RETUSDR ASAA1077174Frame · crackedFRAME AT BS 440 RT STR 8 CRACKED OUT OF LIMITS. CUT OUT DAMAGE AND REPAIRED.SDR UALA2010010400027Door Frame · crackedDOOR 4L UPPER FRAME CRACKED AT 3 EACH GATE ATTACH FASTE NER HOLES, 7TH, 8TH, & 9TH HOLES FROM FWD END. MAJOR REPAIR ACCOMPLISHED: INSTALLED REPAIR ANGLE.SDR UALA2010010400026Door Frame · crackedDOOR 2L UPPER FRAME CRACKED AT GATE ATTACH HOLE, 9TH HOLE FROM FWD END. MAJOR REPAIR ACCOMPLISHED: INSTALLED REPAIR ANGLE.SDR UALA2010010400025Door Frame · crackedDOOR 5R UPPER FRAME CRACKED AT 2 EACH GATE ATTACH FASTENER HOLES, 9TH AND 11TH HOLES FROM FWD END. MAJOR REPAIR ACCOMPLISHED: INSTALLED REPAIR ANGLE.SDR UALA2010010400022Structure · crackedFOUND FWD FASTENER HOLE CRACKED AT STR 10L BS 460. MAJOR REPAIR ACCOMPLISHED: INSTALLED REPAIR ANGLE.SDR UALA2010010400021Structure · crackedFOUND FWD FASTENER HOLE CRACKED AT STR 8L BS 480. MAJOR REPAIR ACCOMPLISHED: INSTALLED REPAIR ANGLE.SDR UALA2010010400020Structure · crackedFOUND FWD FASTENER HOLE CRACKED AT STR 8R BS 480. MAJOR REPAIR ACCOMPLISHED: INSTALLED REPAIR ANGLE.SDR UALA2010010400018Structure · crackedFOUND FWD FASTENER HOLE CRACKED AT STR 10R BS 450. MAJOR REPAIR ACCOMPLISHED: INSTALLED REPAIR ANGLE.SDR UALA2010010400017Structure · crackedFOUND FWD AND AFT FASTENER HOLES CRACKED AT STR 10R BS 500. MAJOR REPAIR ACCOMPLISHED: INSTALLED REPAIR ANGLE.SDR UALA2010010400016Structure · crackedFOUND FASTENER HOLE CRACKED AT STR 10L BS500. MAJOR REPAIR ACCOMPLISHED: INSTALLED REPAIR ANGLE.SDR SIMA20100401Door Frame · crackedDURING THE MAINTENANCE BASE VISIT FOUND THAT THE BAGGAGE DOOR FRAME WAS BENT AND THE LOWER FORWARD CORNER WAS CRACKED. THE AIRCRAFT WAS REMOVED FROM SERVICE. REMOVED AND REPLACED THE FRAME (CONTINUOUS STOP) IAW EMB SRM 51-40-02. THE AIRCRAFT WAS RETURNED TOSDR IPXA10558156Door Frame · corrodedINSPECTION TYPE:C2, MAIN CARGO DOOR, DOOR FRAME BS530 HAS 3EA SCREW STARTS ON FRAME BETWEEN WL 213-218. (MARKED) REPAIRED DOOR FRAME IAW ER 10-1028 DATED 1-14-10.SDR IPXA10558127Door Frame · gougedINSPECTION TYPE: C2 MAIN CARGO DOOR FRAME IS GOUGED AT BS 487, LBL 66, WL 212 MCD FRAME DOUBLER WAS REPLACED IAW SRM 51-40-02.SDR FDEA200912304559Crease Beam · corrodedUPPER CABIN RT SIDE INBD CREASE BEAM CORRODED FS 590 TO FS 660. R & R RT INBD CREASEBEAM FROM BS 450-664, IAW SRM 51-40-02. CORROSION REMOVAL WAS FOUND TO BE OUT OF LIMITS IAW SRM 53-00-53, FIG. 101, DETAIL 4; ORIGINAL THICKNESS: .070", AFTER REWORK: .045", SDR FDEA200912304558Crease Beam · corrodedUPPER CABIN INBD LT CREASE BEAM FS 1370 TO 1640 HAS NUMEROUS AREAS OF CORROSION. BLENDED AND FOUND TO BE OUT OF LIMITS, IAW SRM 53-60-13, FIG 101, PG 105. REMOVED CREASE BEAM, IAW SRM 51-40-02. FABED NEW CREASE BEAM IAW SRM 51-10-02, 53-60-13. INSTALLED CSDR UHLA2009122900152Shroud · corrodedLAV DUMP SHROUD LEVEL 2 CORROSION AT ATTACH FLANGE. REPLACED SHROUD AND FWD AND AFT FLANGES.SDR IPXA10158133Structure · misrepairedINSPECTION TYPE:4/C REPAIR SURVEY SEQ NR 129-F1-03 REPAIR CUTOUT RADIUS NOT IAW SRM FR84 S TR 45. REPAIRED IAW SRM 53-10-12, FIG 210, SHEET 1 REF. RCD NR 383540.SDR SWAA098154Crease Beam · corrodedDURING SCHEDULED 12Y CHECK, FOUND CREASE BEAM CORRODED BETWEEN BS 974 TO BS 992, RBL 50. REPAIRED BEAM PER SRM.SDR IXXA10WSAP010SStructure · corrodedDURING ROUTINE C-CHECK INSP FOUND CORROSION ON LOWER DRAIN VALVE SURROUNDING STRUCTURE AT STATION 1542. REMOVED CORROSION. FOUND TO BE WITHIN LIMITS. CLEANED, TREATED, PRIMED AND PAINTED AREA IAW SRM 53-00-01 FIGURE 101 REV 101, AND SRM 51-20-01 REV 101.SDR FDEA200912284537Crease Beam · corrodedUPPER CABIN RT SIDE, FS 755 INBD CREASE BEAM CORRODED. REMOVED CREASE BEAM IAW SRM 51-40-02. FABRICATED NEW CREASE BEAM BAC1515-553, IAW SRM 51-40-05. INSTALLED NEW CREASE BEAM AT STA 755- 900, IAW SRM 51-40-02. CATEGORY "A", MAJOR REPAIR.SDR FDEA200912254515Longeron · corrodedUPON REMOVAL OF R3 DOOR SCUFF PLATE FOUND L-28 WITH 3 EA LOCATIONS CORROSION ON FUSELAGE FROM STA 1260-1302. CORRODED LONGERON 28 RT AT STA 1260 TO STA 1302. R & R IAW SRM 51-33-01 REVISION 42. REPAIR CLASSIFIED AS MAJOR IAW GMM 6-2-100 REVISION 109.SDR CA091230001Door Frame · cracked(CAN) CRACK WAS FOUND ON THE CARGO DOOR FWD FRAME SURROUND RADIUS AT STA FS576 AND WL 97.75. THIS CRACK IS NOT EASILY VISABLE DUE TO APPLICATION OF SEALANT UNDER THE FITTING. TASK 52-31-02-01 CALLS OUT DETAILED VISUAL INSP (DVI) OF THE AREA - BUT DOES NOT REQUSDR AALA20091223TUL04Web · crackedFORWARD ENTRY DOOR AFT DOOR JAMB AT STATION 210, LONGERON 15 LEFT, HAS A CRACKED WEB. REMOVED AND INSTALLED WEB PER AARD 53-10-00-11.SDR ASAA0957163Support Angle · crackedOUTBOARD AFT RAM AIR INLET SUPPORT ANGLE IS CRACKED. REMOVED FABRICATED AND INSTALLED NEW ANGLE.SDR ASOA200901455Post · crackedFOUND FS 409.0+128 VERTICAL POST BL 0.0 LT SIDE HAS INDICATION NOTED THAT NEEDS FURTHER EVALUATION AT WL 69.0 AFT FLANGE RADIUS.SDR FDEA200912234510Beam · crackedFWD CARGO COMPT, FOUND CRACK ON BEAM. PERFORMED REPAIR ON BEAM IAW SRM 53-60-01 FIG.3 VOL.1SDR A6WA201040057Door Frame · crackedPAX DOOR FRAME CRACKED BY ROLL MECHANISM AFT OF FWD DOOR EDGE. COMPLIED WITH REO 601R-52-11-1742.SDR 2010FA0000042Grommet · failedFAILURE OF A RUBBER GROMMET ON THE PRIMARY 28 VDC DC POWER CABLE PASSING THROUGH THE FIRE WALL WAS FOUND DURING AN INSPECTION. FAILURE OF THIS GROMMET AND CHAFING THROUGH THE INSULATION WOULD CAUSE SHORTING OF THE BATTERIES AND A FIRE STARTING IN THE FRONT COSDR SWAA097956Crease Beam · corrodedDURING SCHEDULED 12Y CHECK, FOUND AFT RIGHT GALLEY CREASE BEAM CORRODED. REMOVED AND REPLACED BEAM PER SRM.SDR UALA2009122103946Failsafe · crackedUPPER DECK FRAME FAIL-SAFE CHORD CRACKED AT BS 1140 RT. MAJOR REPAIR ACCOMPLISHED: SPLICED IN NEW SECTION OF FAIL-SAFE CHORD.SDR UALA2009122103945Failsafe · crackedUPPER DECK FRAME FAIL-SAFE CHORD CRACKED AT BS 1140 LT. MAJOR REPAIR ACCOMPLISHED: SPLICED IN NEW SECTION OF FAIL-SAFE CHORD.SDR SWAA097905Crease Beam · corrodedDURING SCHEDULED 12Y CHECK, FOUND L2 DOOR CREASE BEAM CORRODED. REMOVED AND REPLACED BEAM PER SRM.SDR SWAA097880Door Frame · crackedDURING SCHEDULED HC2 CHECK, FOUND FWD GALLEY SERVICE DOOR BEAM FRAME CRACKED. REMOVED AND REPLACED R1 DOOR PER MM.SDR SWAA097875Door Frame · crackedDURING SCHEDULED 10Y CHECK, FOUND L1 DOOR FRAME LOWER FRAME COVER CRACKED. REPAIRED FRAME PER SRM.SDR DLM88092011Beam · crackedDURING HMV A CRACK WAS FOUND ON NR 1 BEAM AND CLIP AT R1 DOOR. CLIP AND BEAM WAS REPAIRED IAW SRM 52-05D FIG 25.SDR DLM88092010Door Frame · corrodedDURING HMV CORROSION WAS FOUND ON REPAIR DOUBLER ON C1 FWD DOOR JAMB BTW LONGERON 28-26 RT REPAIR DOUBLER WAS REPLACED IAW SRM 53-05D FIG 804D.SDR DLM88092002Beam · corrodedDURING HMV EXFOLIATION CORROSION WAS FOUND ON AFT CARGO COMPARTMENT DOOR JAMB LOWER BEAM STA Y=1155 TO 1212. LWR DOOR BEAM WAS REPAIRED IAW SRM 53-05 FIG 123.SDR DLM88092001Door Frame · damagedDURING HMV ELONGATED HOLE WAS FOUND ON FWD DOOR JAMB STA Y=370 BTW LONGERON 27-28 RT AT FWD CARGO COMPARTMENT. HOLE WAS REPAIRED IAW ERA 478002-14 REV ORIGINAL.SDR DLM88092000Window Frame · damagedDURING HMV LIGHTNING STRIKE WAS FOUND ON WINDOW FRAME NR 31 AT AFT LOWER CORNER DAMAGE WAS REPAIRED IAW SRM 53-05 FIG 111.SDR DLM88091999Window Frame · damagedDURING HMV LIGHTNING STRIKE WAS FOUND ON WINDOW FRAME NR 41 AT AFT UPPER CORNER. DAMAGE WAS REPAIRED IAW SRM 53-05 FIG 111.SDR AALA20091218TUL19Mount Bracket · crackedAFT DOOR, LOWER STOP PAD MOUNT BRACKET IS CRACKED. INSTALLED A NEW PAD MOUNT BRACKET PER ESO 80174.SDR AALA20091218TUL17Stop Fitting · crackedAFT CABIN ENTRY DOOR JAMB LEFT CENTER STOP PAD CRACKED. REMOVED AND REPLACED STOP PAD PER SRM 51-01.SDR AALA20091218TUL08Stop Fitting · crackedCABIN AFT ENTRY DOOR JAMB, BOTTOM RIGHT STOP PAD FITTING CRACKED. REMOVED AND REPLACED STOP PAD FITTING PER SRM 51-01.
Back to JASC 5310