JASC 5315
Service difficulty reports · 44,218
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR CALA2021082301404Floorbeam · corrodedA3NB-53-3-6185 MAIN CABIN FLOOR SUPPORT -Y1292 FR68 CORRODED. (D OT 38-33)() REPLACED FLOOR SUPPORT P/N:D5347218920400 BETWEEN FR68-69 AND -Y 1292 IAW SRM 51-72-11. ATTACHED FORM 44-008. EMP#V934611 WORK AC COMPLISHED AT ST ENGINEERING MOBILE AT BFM ON NR#0013SDR CALA2021082301399Floorbeam · corroded(A3NB-53-3-6040) CORROSION AT MAIN CABIN FLOOR SUPPORT FR 16 BET WEEN Y254 & Y765. NO REWORK ALLOWED IAW SRM 53-11-14-283-007 FIG 005 NOTE 3 REMOVE D DAMAGE AREA IAW SRM 51-42-11 RECEIVED NEW PART P/N 53112826002 00 BIN0002961235 INSALLED NEW PART IAW SRM 51-4SDR SWIA2021110262015Floorbeam · corroded*FLOOR SUPPORT BRKT COMMON TO FS280 CROSSBEAM CORRODED. REMOVED AND REPLACED FLOOR SUPPORT BRKT COMMON TO FS280 CROSSBEAM REF DWG NO. CC670-33052 REV -G, CRJ700 SRM 51-42-06-001-001-A01 AND SRM 51-42-21-001-001-A01. SEE CONTINUE CARD FOR DETAILS. COMPLIEDSDR MASA20210915437Floorbeam · crackedCRACK ON FLOOR BEAM RBL 12.00, FS280.00, WL73.5 AT FWD AVIONICS/FLIGHT CONTROLS COMPARTMENT. FLOOR BEAM RBL 12.00, FS280.00, WL73.5 WAS REPAIRED PER EA 72-2021-146 REV. IRSDR MASA20210915436Floorbeam · crackedCRACK ON FLOOR BEAM LBL 12.00, FS280.00, WL73.5 AT FWD AVIONICS/FLIGHT CONTROLS COMPARTMENT. FLOOR BEAM LBL 12.00, FS280.00, WL73.5 WAS REPAIRED PER EA 72-2021-145 REV. IRSDR FDEA202108212053Floorbeam · crackedMAIN CARGO COMPT. FLOOR BOARD SUPPORT AT STA. 1199 AT APPROX. X=98 TO X=104 CRACKED REMOVED AND REPLACED FLOOR BOARD SUPPORT P/N ACA3763-1 ON MAIN CARGO COMPT. AT NOTED LOCATION REF SRM 51-33-01 VOL 2SDR FDEA202108192052Floorbeam · corrodedMAIN CARGO COMPT. FLOOR BOARD SUPPORT AT STA. 1219 AT APPROX. X=89 TO X=105 HAS CORROSION REMOVED CORRODED FLOOR BOARD SUPPORT AND FABRICATED NEW FLOOR BOARD SUPPORT P/N AEA0394-501 IAW DOUGLAS DRAWING AEA0394 USING S2929169 EXTRUSION MP5630208 AND INSTASDR IPXA2021090373517Floorbeam · buckledINSPECTION TYPE:A300MAIN CARGO DECK CARGO FLOORBEAM RH SIDE AT FRAME 49 IS BUCKLED.COMPLIED WITH EO A300-5310-75878-B.SDR IPXA2021090373515Floorbeam · buckledINSPECTION TYPE:A300MAIN CARGO DECK CARGO FLOORBEAM RH SIDE AT FRAME 50 IS BUCKLED.COMPLIED WITH EO A300-5310-75878-B.SDR IPXA2021090373514Floorbeam · buckledINSPECTION TYPE:A300MAIN CARGO DECK CARGO FLOORBEAM RH SIDE AT FRAME 48 IS BUCKLED.COMPLIED WITH EO A300-5310-75878-B.SDR FDEA202108192051Floorbeam · crackedMAIN CARGO COMPT. FLOOR BOARD SUPPORT AT STA. 1481 AT APPROX. X=-10 TO X=-16 CRACKED REMOVED AND REPLACED FLOOR BOARD SUPPORT P/N ACA3763-1 ON MAIN CARGO COMPT. AT NOTED LOCATION REF SRM 51-33-01 VOL 2SDR FDEA202108192050Floorbeam · crackedMAIN CARGO COMPT. FLOOR BOARD SUPPORT AT STA. 1461 AT APPROX. X=29 TO X=35 CRACKED REMOVED AND REPLACED FLOOR BOARD SUPPORT P/N ACA3763-1 ON MAIN CARGO COMPT. AT NOTED LOCATION REF SRM 51-33-01 VOL 2SDR FDEA202108192049Floorbeam · crackedMAIN CARGO COMPT. FLOOR BOARD SUPPORT AT STA. 1441 AT APPROX. X=10 TO X=16 CRACKED REMOVED AND REPLACED FLOOR BOARD SUPPORT P/N ACA3763-1 ON MAIN CARGO COMPT. AT NOTED LOCATION REF SRM 51-33-01 VOL 2SDR 2021FA0000236Floorbeam · corrodedMOISTURE/CORROSION ON FLOOR STRUCTURE. PERFORMED NITTO 11611MB TAPE INSTALLATION (MAJOR ALTERATION)I/A/W PSA T.O 53-079-001-17 AND FFA FORM 8110-3 TP U9-0229 REV A DATED 5/23/2018. FOR DETAILS SEE AAR W/O 1019553 1000-0076.SDR FDEA202108182059Floorbeam · crackedFUSELAGE MAINFRAME OVERWING FLOOR BEAM L/H SIDE AT STA 1256 LBL 112 IS CRACKED APPROX. ONE INCH IN LENGHT. (MKD) REPAIRED FUSELAGE MAINFRAME OVERWING FLOOR BEAM AT STA 1256 LBL112 REF BOEING SERVICE BULLETIN DC10-53-172 FIG 5, DWG SR10530081, EA 8-5310-T03SDR AALA202109014277Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION MEASURING L=0.09 IN, W=0.075 IN, D=0.029 IN, ON FLOOR BEAM LOCATED AT STA 986.5 AND RBL 29 TO 34. REPAIRED PER EA 330093.SDR DALA2021082004877Floorbeam · crackedSHIP 6801 CRACK ON BEAM UPPER CHORD AT STA 377 AND LBL 51 IN REF NRC 0205. CORRECTIVE ACTION: SUMMARY ON NRC 00276:CRACK ON BEAM UPPER CHORD AT STA 377 AND LBL 51 WAS REPAIRED PER.ETI-57-21-410 REV 1, B757-200 S.R.M. AND ER/A 593450-14 REV ORIG. (1916237)SDR DALA2021081904815Floor Support · corrodedSHIP 3264 CORROSION FLOOR BEAM -Y1162.5 AND -Y1292 BTW FR 66/68 AFT GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM PER A320 SRM 51-72-11. (1916346)SDR COEA2021091003816Floorbeam · crackedWO 229094 NR 100009 HEAVY CHECK COE/MAJOR REPAIR: INTERNAL FUSELAGE, L/H M7 LONGITUDINAL FLOORBEAM IS CRACKED AT FRAME 40. CORRECTIVE ACTION: REPAIRED PER EMPIRE AIRLINES E.O. 5315-02.0SDR FDEA202108172029Floorbeam · crackedMAIN CABIN OVERWING FLOOR BEAM, R/H SIDE, AT STA 1275 RBL 104, HAS A SEVERED BEAM. (MKD) INSTALLED NEW FABRICTED EXTRUSION SPLICE IAW SRM 51-38-01 PAR 4.D VOL 2 AND DWG VZZ7071(-1) SHEET 2 ZN17 VIEW G-G AND SRM 51-33-01 VOL.2SDR DATA08152021001Floorbeam · corrodedBOOM ANGLE (LATERAL FLOOR SUPPORT BEAM) AT FS 428 IS CORRODED BEYOND LIMITS. REPLACED BOOM ANGLE WITH NEW PER SHORTS SD3-60 STRUCTURAL REPAIR MANUALSDR MASA20210816373Floorbeam · crackedCOMPLY WITH SB 670BA-53-041 PART B ONLY 280 BEAM SB. THE BEAM WAS FOUND TO BE CRACKED, WHICH IS THE ORIGINAL REASON FOR THIS. DUE TO EFFECTIVITY VIA THE SERIAL NUMBER, THE SB WAS ALREADY COMPLIED WITH. HOWEVER, THE BEAM WAS REPLACED FROM THE SRM ON A SEPARATESDR SWAA2021081907653Floorbeam · crackedDURING OK TO INSTALL FOUND PANEL BREAK CRACKED AT STA 540 RBL 1 ; / [01] REMOVED FLOOR PNL 231UF I/A/W SRM 51-40-02-0G-0; [02] REMOVED FLOOR BREAK AT STA 540 RBL 1 I/A/W SRM 51-40-02-0; [03] DRILLED UP NEW FLOOR BREAK AT STA 540 RBL1 I/A/W SRM51-40-02-0G-0 ANDSDR DALA2021081604691Floorbeam · corrodedSHIP 3264 CORROSION FLOOR BEAM +Y765 AT LEVEL OF FR68 FLOOR STRUCTURE AT AFT GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM PER SRM 51-72-11 AND 51-42-11. (1913082)SDR JR2R20218224963Floorbeam · corrodedFLOOR BEAM AT FR87 RBL 10 CORRODEDSDR SWIA2021091060837Floorbeam · corrodedCORROSION ON FLOORBEAM LBL9 AT APPROXIMATELY FS1031 (MARKED) (C-CHECK RO 9/8/2021) REPAIRED FLOOR BEAM LBL9 AT APPROXIMATELY FS1031.00 REF. CRJ700 SRM 53-00-41-201-001-A01, FIGURE 53-00-41-991-803 SHEET 1 AND 4.COMPLIED WITH ST 51-900-1002-SKYSDR DALA2021081704754Floorbeam · corrodedDURING INSPECTION MAINTENANCE FOUND CORROSION LEVEL 2 CABIN COMPARTMENT FLOOR BEAM FOUND CORROSION AT BS 347, RBL54.75 TO 10 INCH. FLOOR BEAM REPAIRED PER SRM. (LP 1910098)SDR FDEA202108132010Floorbeam · crackedHIGH FREQUENCY EDDY CURRENT INSPECTION ON MAIN DECK CARGO COMPARTMENT FUSELAGE MAIN FRAME OVERWING FLOOR BEAM STATION Y=1275.250 X=-114.5 FOUND CRACK APPROXIMATELY 0.4" . CRACK AT FLOOR BEAM ON MAIN DECK CARGO COMPARTMENT FUSELAGE MAIN FRAME OVERWING STASDR IPXA2021081372711Floorbeam · crackedINSPECTION TYPE:A300FRAE 72-1459 FLOOR BEAM SUPPORT BRACKET P/N A3617032720000 IS CRACKED.REMOVED AND REPLACED BRACKET P/N A3617032720000 BATCH 0003824942 IAW A300 SRM 51-40-21.SDR AALA202108124591Floorbeam · brokenCABIN FLOOR BOARD SUPPORT BRACKET AT FR 32 UNDER FORWARD SIDE OF FLOOR PANEL 231VF BROKEN. REPLACED SUPPORT BRACKET PER SRM 51-42-11.SDR SWAA2021090705854Floorbeam · crackedCRACKED FLOOR SUPPORT AT B.S 540; B.L. 0 - L.B.L. 24.5; W.L. 208.1. ; / [01] REMOVED FLOOR SUPPORT AT BS540 LBL24.5 PER SRM 51-40-02-0G-0; [02] LOCATED AND DRILLED NEW FLOOR SUPPORT AT BS 540;BL0-LBL24.5 PER SRM 51-40-05-0G-0 ; OK TO INSTALL; [03] VERIFIED CORSDR SWAA2021090705855Floorbeam · crackedCRACKED FLOOR SUPPORT AT B.S 540; B.L. 0 - R.B.L. 24.5; W.L. 208.1. ; / [01] REMOVED FLOOR SUPPORT AT BS540 RBL24.5 PER SRM 51-40-02-0G-0; [02] LOCATED AND DRILLED NEW FLOOR SUPPORT AT BS540 RBL24.5 PER SRM 51-40-05-0G-0; OK TO INSTALL; [03] VERIFIED CORRECTIVSDR CALA2021081101314Floorbeam · corrodedAFT FLOOR ENTREANCE AREA CORR.FINDINGS. A3NB-53-3-6222 ORIG.18-5341-1-2710.SDR MASA20210810367Floorbeam · corrodedCRACK AT FS280 CROSS BEAM LBL 14 |R&R UH 280 CROSS BEAM AT LBL 14SDR MASA20210809364Floorbeam · corrodedMAIN FORWARD CABIN RH FLOOR SILL CORRODED AT FS280
R&R RH FLOOR SILL IAW SRM 51-42-06SDR V0XD20210808003Floorbeam · crackedTHE L/H SIDE OF THE R.S. 280.00 CROSSBEAM IS CRACKED ON THE BOTTOM SIDE AT LBL12. CORRECTIVE ACTION: REMOVED AND REPLACED TH L/H SIDE OF THE F.S 280.00 CROSSBEAM(PN:CC670-34094-1) IAW CRJ 900 SRM 51-42-21,51-42-13,51-42-21 AND 51-42-06.SDR V0XD20210808002Floorbeam · crackedAT F.S. 280.00 THE FLOORBEAM ATTACH ANGLE AT LBL12 IS CRACKED. CORRECTIVE ACTION: REMOVED AND REPLACED THEATTACH ANGLE(PN:CC670-34269-35) AT F.S. 280.00 IAW CRJ 900 SRM 51-42-21SDR V0XD20210808001Floorbeam · crackedAT F.S. 280.00 THE FLOORBEAM ATTACH ANGLE AT RBL12 IS CRACKED. CORRECTIVE ACTION: REMOVED AND REPLACED THEATTACH ANGLE(PN:CC670-34269-40) AT F.S. 280.00 IAW CRJ 900 SRM 51-42-21SDR JJBA2021081305033Floorbeam · corrodedMAIN CABIN, FWD FUSELAGE FLOORBEAM AT FR 20 HAS CORROSION. REMOVED AND REPLACED FLOORBEAM AT FR 20SDR DALA2021080604471Floorbeam · corrodedSHIP 3158 - CORROSION FLOOR BEAM -Y1292 AT LEVEL FR 20 FWD GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM LOC. Y1292 AT LEVEL FR.12 TO FR.24 FWD GALLEY AREA AS PER A319 SRM 51-42.(1900786)SDR SWAA2021090703716Floorbeam · crackedMAIN CABIN FLOOR BEAM STA 328 RBL-20' FASTENER HOLE CRACKED ; / [01] INSTALLED EWIS PROTECTION AT CABIN FROM STA 312 TO STA 344 BETWEEN RBL-60 TO LBL 20 REF B737-7 AMM 20-60-07-913-801; [02] VERIFIED WORK PERFORMED; [03] REMOVED INTERCOSTAL AT CABIN BETWEEN STSDR DALA2021080904524Floorbeam · damagedSHIP 652 IN REFERENCE NRC 00422 AND 00423 REPLACEMENT FLOOR BEAM STA 1640. CORRECTIVE ACTION: SUMMARY OF NRC 01135: FLOOR BEAM ON STA 1640 WAS REPAIRED PER ETI-57-21-355 REV. 6 AND ER/A 593189-14 REV. ORIGINAL. (1899444)SDR IPXA2021080472442Floorbeam · corrodedINSPECTION TYPE:SEG4CORROSION ON FLOOR BEAM AT STA 1200 FROM RBL60-LBL60REPAIRED IAW UPS EO B757-5310-81178-A, UPS RCD 215368 AND EA 757-5360-27-A2642 REV-SDR SWIA2021092961280Floorbeam · crackedSUSPECTED CRACK ON FWD SIDE OF FS280 BEAM AT LBL9 (C-CHECK RO 9-30-21) CRACK ON FWD SIDE OF FS 280.0 BEAM AT LBL 9.0 REPAIRED REF BOMBARDIER REO 601R-53-11-926 REV B DATED 2006/05/10 / COMPLIED WITH TASK CARD 51-900-1003-SKYSDR SWIA2021092961276Floorbeam · corroded* FLOOR BEAM AT RBL27 HAS CORROSIONON OUTBOARD FLANGE AT APPROX FS597. (C-CHECK RO 9-30-21) REPAIRED RBL27 FLOOR BEAM OTBD FLANGE AT APPROX FS597.00 REF CRJ200 SRM 53-00-43 REPAIR NO.1. COMPLIED WITH 51-900-1003-SKYSDR SWIA2021092961272Floorbeam · corroded*FS409.00+64 €“ FS409+80 FLOOR BEAM LBL9 OUTBOARD FLANGE HAS CORROSION. (MARKED) (C-CHECK RO 9-30-21) REPAIRED FS409.00+64 €“ FS409+80 LBL9 FLOOR BEAM OTBD FLANGE REF CRJ-200 SRM 53-00-43 REPAIR NO.- 1. COMPLIED WITH TASK CARD 51-900-1003SDR SWAA2021090700817Floorbeam · corrodedCORROSION ON UPPER FLANGE; FLOOR BEAM STA. 986.5; RBL 45 ; / [01] REMOVED CORROSION AT UPPER FLANGE FLOOR BEAM STA 986.5 ; RBL 45 PER REF B 737-700 SRM 51-10-02-0G-0.;[10] VERIFIED STEP 6 AND 7.; [11] (RII) VERIFIED STEP 8.; [12] VERIFIED STEP 9.; [13] CUT ANDSDR SWAA2021090700818Floorbeam · corrodedCORROSION ON UPPER FLANGE; FLOOR BEAM STA. 986.5; LBL 45 ; / [01] REMOVED CORROSION ON UPPER FLANGE AROUND FASTENER HOLE FOUND EXFOLIATION CORROSION OUT OF LIMITS PER SRM 53-70-51-1A-1; [02] VERIFIED STEP 1; [03] REPAIR ON FLOOR BEAM STA 986.5 LBL 45 IS ACCOMPSDR HNAA2021083100416Floorbeam · corrodedL/H OUTBD FLOORBEAM CORRODED FR-61. RAR LH OUTBD FLOORSBEAM AT FR 61 IAW SRM 51-40-02.SDR SWAA2021091540284Floorbeam · corrodedCORROSION ON FLOOR SUPPORT SPLICE AT AFT CARGO BAY BS887 LBL7 TO RBL17 WL168. ; / [01] EVALUATED CORROSION; FOUND TO BE OUT OF LIMITS DUE TO NO LIMITS IN THE SRM AND REQUIRES REPLACEMENT PER SRM 51-10-02-0G-0; [02] VERIFIED CORRECTIVE ACTION ENTRY 1.; [03] REM
Back to JASC 5315