JASC 5315
Service difficulty reports · 44,218
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR SWIA2021090360679Floorbeam · corrodedAVIONICS FLOORBOARD SUPPORT AT FS 280 IS CORRODED (C-CHECK RO 8/31/21) AVIONICS FLOORBOARD SUPPORT AT FS 280 WAS REMOVED AND REPLACED IAW CRJ 700 SRM 51-42-06-001-001-A01 & 51-42-21-001-001-A01. SEE ATTACHED CONTINUATION CARD FOR DETAILS OF WORK PERFORMEDSDR SWIA202160651Floorbeam · corrodedCROSSBEAM AT FS1051.20 HAS MULTIPLE SPOTS OF CORROSION BETWEEN LBL27 AND LBL36 (C-CHECK RO 8/31/21) REPAIRED CROSSBEAM AT FS1051.20 BETWEEN LBL27 AND LBL36 IAW REO 670-53-61-1879 REV -- DATED 2021-04-30 FPRM 337 AND MAJOR REAPIR TASK CARD 51-900-1003-SKY CSDR REXA2021042700273Floorbeam · corrodedFS 280 CROSSBEAM J ANGLE HAS AREAS OF CORROSION AROUND NUTPLATES.
REMOVED CORRODED J ANGLE AT FS 280 CROSSBEAM AND INSTALLED NEW SERVICEABLE ANGLE PN CC670-34095-3S IAW CRJ 900 SRM 51-42-21-00-001-
A01 AND 51-42-06-001-001-A01 RECOMPED SEVERAL AVI BAY LIGHTSDR FDEA202104130901Floorbeam · crackedLOWER FORWARD CARGO COMPARTMENT BILGE STATION 939 , X = -5 , FLOOR BEAM FOUND CRACK . LOWER FORWARD CARGO COMPARTMENT BILGE STATION 939, X = -5 CRACKED FLOOR BEAM CARRIED OUT REPAIR AS PER SRM 53-00-00-2R REPAIR GENERAL FIGURE 210 . REPAIR CLASSIFIED AS SDR AALA202105139010Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FLOOR BEAM AT STA 987 RBL 42. REPAIRED PER SRM 53-70-51-2R-6 AND EA 327053.SDR SWAA2021050563763Floorbeam · corrodedFWD CABIN WET AREA FLOOR STRUCTURE; STA344; LBL0; WL208; FLOORBEAM T-CAP FASTENER HOLE UPPER & LWR SURFACE; CORROSION; MRK'D. / REMOVED CORROSION FROM FWD CABIN WET AREA STA 344 LBL 0 WL 208 FLOOR BEAM T CAP IAW SRM 53-10-51-1A-1 AND INSPECTED W/ 10X MAG GLASSSDR AALA202105049022Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FLOOR BEAM LOCATED AT STA 987 LBL 42. REPAIRED PER SRM 53-00-51 AND EA 327025.SDR YENA2021041600237Floorbeam · corrodedDURING HMV, CORROSION FLOOR BEAM + Y765 LOCATED BTW FR18 & FR19 AT FORWRD GALLEY AREA; REF AEROMAN NR 2021-113244 -REMOVED & REPLACED FLOOR BEAM +Y765 LOCATED BTW FR12-FR24 IAW A320 SRM 51-72-11-911-001 AND DRAWING D53111225 (THIS IS CONSIDERED A MAJOR REPAISDR SWIA202158845Floorbeam · corrodedSUPPORT BEAM @ STA. 559.00 BTW LBL 27.0 AND L/H FLOOR SILL HAS EVIDENCE OF CORRISION. MARKED WITH TAPE (C-CHECK - RO 6/19/21) / REMOVED CORROSION FROM LBL27 TO FLOOR SILL AT FS 559 REF CRJ200 SRWM 51-21-06. FOUND THE STRAP ON THE FLOOR BEAM AT FS 559 LBL SDR SWIA2021062859132Floorbeam · corrodedA-BAY FLOOR SUPPORT ANGLE @ FS.280 HAS CORROSION (C-CHECK RO 6/22/2021) REMOVED DAMAGED A-BAY FLOOR SUPPORT ANGLE AND INSTALLED NEW A-BAY FLOOR SUPPORT ANGLE AT FS280.00 REF: CRJ900 SRM 51-42-06-001-001-A01, CRJ900 SRM 51-42-21-001-001-A01, CRJ900 SRM SDR SWAA2021042363569Floorbeam · crackedCRACKED FLOOR SUPPORT AT B.S. 540; B.L. 0 - L.B.L. 24.5; W.L. 208.1. / REMOVED & REPLACED FLOOR SUPPORT AT B.S. 540; B.L 0 - L.B.L 24.5; W.L. 208.1. PER SRM 51-40-02 AND DWG # 143A5240 57600U 14APR21SDR SWAA2021042363570Floorbeam · crackedCRACKED FLOOR SUPPORT AT B.S. 540; B.L. 0 - R.B.L. 24.5; W.L. 208.1. / REMOVED & REPLACED FLOOR SUPPORT AT B.S. 540; B.L. 0 - R.B.L. 24.5; W.L. 208.1; PER SRM 51-40-02 AND DWG # 143A5240 57600U 14APR21SDR DALA2021040902090Floorbeam · corrodedSHIP 3254 CORROSION FLOOR BEAM -Y765 AT LEVEL FR 20 FWD GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM PER SRM A320 51-72-11. (1776785)SDR SWIA202158328Floorbeam · dentedRBL 27.00 PRESSURE FLOOR-SUPPORT BEAM CHANNEL HAS DENT LOCATED AT APPROX. FS 461.00 (MARKED). (C-CHECK RO 5/20/2021) REPAIRED THE RBL 27.00 PRESSURE FLOOR-SUPPORT BEAM CHANNEL AT APPROX. FS 461.00 WITH REO 601R-53-41-2921 REV -- DATED 2021-05-17. COMPLISDR SWIA202158325Floorbeam · crackedSUSPECTED CRACK ON RBL27.00 PRESSURE FLOOR-SUPPORT BEAM CLIP ATTACHED TO ROLLER FAIRLEAD BRACKET ASSY AT FS 484.00 (MARKED) (C-CHECK RO 5/20/2021) REMOVED CRACKED CLIP AND INSTALLED NEW CLIP REF PREVIOUSLY INCORPERATED REO 601R-53-41-059 REV-B DATED 200SDR SWIA202158324Floorbeam · crackedSUSPECTED CRACK ON LBL36.00 FLOOR BEAM TO FLIGHT CONTROL CABLE ROLLER FAIRLEAD BRACKET ASSY CLIP AT FS484.00 (MARKED) (C-CHECK RO 5/20/2021) REMOVED CRACKED ANGLE AND INSTALLED NEW ANGLE AT LBL36.00 FS484.00 REF CRJ200 SRM 51-42-21 AND REO 601R-53-41-0SDR SWIA202158323Floorbeam · crackedSUSPECTED CRACK ON LBL9.00 PRESSURE FLOOR-SUPPORT BEAM TIE-CLIP TO CROSS-MEMBER AT FS484.00 (MARKED) (C-CHECK RO 5/20/2021) REMOVED AND INSTALLED NEW CLIP AT FS484 ON LBL9 REF DWG 601R31171 REV-B AND REO 601R-53-41-2908 REV--, DATED 2021-04-23. COMPLIEDSDR MASA20210430182Floorbeam · corrodedCORROSION ON FITTING IN RH INTERCOSTAL OF FLOOR STRUCTURE TO FS 280 FLOOR SUPPORT CROSSBEAM. FITTINGS OF INTERCOSTALS 20 RBL AND 36 RBL OF FLOOR STRUCTURE BETWEEN FS: 280-295, WERE REPLACED PER CRJ/900 SRM 51-42-21-001-001-A01SDR DALA2021040802069Floorbeam · corrodedSHIP 658 DURING FLOOR PANELS REMOVAL ON W4 WAS FOUND CORROSION ON FLOOR BEAM UPPER CHORD STA 1640 BTW RBL 0 AND RBL 10 AT PASSENGER COMPARTMENT FLOOR STRUCTURE (IN REFERENCE NRC 00380). CORRECTIVE ACTION: SUMMARY OF NRC 00389: FLOOR BEAM UPPER CHORD STA 1640 BSDR SWIA2021072859756Floorbeam · corrodedFLOOR SUPPORT CROSSBEAM IS CORRODED AT LBL 36 F.S. 349.00. (C-CHECK RO 7/24/2021) REPAIRED FLOOR SUPPORT CROSSBEAM AT LBL 36 FS 349.00 IAW MHIRJ REO 601R-53-21-3442 REV -- DATED 2021-05-17 AND SKY CARD 51-900-1003-SKY NO WEIGHT CHANGE, FORM 337 IS ATTACSDR DU4R2021040600065Floorbeam · corrodedDURING SCHEDULED INSPECTION AT HAECO LAKE CITY, FLORIDA FOUND FLOOR BEAM UNDER MAIN CABIN HAS EVIDENCE OF CORROSION AT BS 907, LBL 70.53 TO RBL 70.53. S/O 660004 N/R 44835.SDR SWIA202158337Floorbeam · crackedFS280.00 FLOOR MEMBER IS CRACKED AT APPROX RBL9 (C-CHECK RO 5/20/2021) REMOVED AND REPLACED NEW FLOOR ANGLE PN 600-34017-351S REF CRJ200 SRM 51-41-02, SRM 51-42-06 AND SRM 41-42-21SDR SWIA2021070759292Floorbeam · corroded*MULTIPLE AREAS OF CORROSION ON FS 280.00 FLOOR SUPPORT BEAM BETWEEN LBL9 €“ RBL9 (C-CHECK RO 7/5/2021) REMOVED AND REPLACED COCKPIT FLOOR SUPPORT BEAM P/N CC670-34095-1 AT FS280 LBL9 - RBL9 REF DWG NO. CC670-33052 REV -G, CRJ700 SRM51-42-06-001-001-A0SDR SWAA2021042664337Floorbeam · crackedCRACK INTERCOSTAL. WEB FLOOR STRUCTURE LOCATED BS 540 AT LBL 24.5 TO RBL 24.5 AT PASSENGER CABIN (2 EA). REPLACED INTERCOSTAL WEB FLOOR STRUCTURE LOCATED BS540 AT LBL 24.5 TO RBL 24.5 PASSENGER CABIN (2EA) IAW SRM B737700 514002 AND 511002 ITEM 9SDR CALA2021040500414Floorbeam · corrodedB757-53-3-0575: MAIN CABIN FLOOR STRUCTURE DECK PLATE CORRODED A T STA 1681 BTWN LBL 24.75 AND LBL 45.50. REF HAECO GSO NR 92827 00 REMOVED CORROSION IAW B757 SRM 51-10-02. ORIG THICKNESS .071, RE MOVED .043, REMAINING .028 IS NOT WITHIN ALLOWABLE LIMITS IAW SDR JR2R202104034108Floorbeam · corrodedFLOOR BEAM FR 12-14 RBL 11 CORRODED OUT OF LIMITS. REPAIRED FLOOR BEAM IAW EMB 175 SRM 53-10-10 REPAIR 01.SDR JR2R202104034118Floorbeam · corrodedFLOOR BEAM AT FR85 RBL 11 CORRODED OUT OF LIMITS. REPAIRED FLOOR BEAM IAW EMBRAER ETD 2021-170-008756.SDR JR2R202104034117Floorbeam · corrodedFLOOR BEAM AT FR 87 LBL 11 IS CORRODED AT AND AROUND RIVET. FOUND TO BE OUT OF LIMITS. REPAIRED BEAM IAW EMB 175 SRM 53-23-10.SDR VNAA2021040299912Floorbeam · corrodedCORROSION AT AFT BAGGAGE BY STA 1031, DOT 601 BLK ABOUT 12 INCHES IN FROM DOOR FRAME. REPAIR AT AFT BAGGAGE BAY STA 1031, ABOUT 12" . LBL9 PERFORMED IAW EA 21-C7-53-194.SDR VNAA2021040299911Floorbeam · corrodedCORROSION AT STA 1031 R.B.L9 DOT 604 BLK. PERFORMED AFT FLOOR BEAM SPLICE REPAIR AT STA 1031 IAW EA 21-C7-53-194 AND SRM 53-00-41.SDR SWIA202158183Floorbeam · corroded* CORROSION ON FS280.00 BEAM BETWEEN RBL9.00 & LBL9.00 (MARKED WITH ORANGE STREAMER) (C-CHECK RO 5/16/2021) REMOVED CORROSION ON FS280 BEAM BETWEEN RBL9 & LBL9, REF CRJ 200 SRM 51-21-06, FWD ANGLE IS OUT OF LIMITS PER REF CRJ 200 SRM 53-00-00, AFT ANGLESDR SWIA202158182Floorbeam · corroded* CORROSION ON FLOOR SUPPORT ANGLE AT FS621 OUTBOARD OF LBL27. (C-CHECK RO 5/16/2021) REMOVED AND REPLACED FLOOR SUPPORT ANGLE AT FS621 OUTBOARD OF LBL27 REF REO 601R-53-61-117 REV -E DATED 2018-01-15, CRJ 200 SRM 51-42-06 AND CRJ 200 SRM 51-42-21. PRESSDR SWAA2021050361302Floorbeam · crackedCRACKED BREAK PANEL STA 540; LBL 1; WL 207. / REMOVED DAMAGED BREAK PANEL BS540 LBL1 - LBL25 WL207 I.A.W SRM 51-40-02-0G-0; LOCATED AND DRILLED NEW BREAK PANEL I.A.W AIPC 53-31-00-05 AND SRM 51-40-05-0G-0 OK TO INSTALL 80512R 13APR21 INSP 18 13APR21 INSTALLED SDR REXA2021041600230Floorbeam · corrodedL/H 280 BEAM CORRODED BEYOND LIMITS. REQUIRES REPLACEMENT. REMOVED AND REPLACED CORRODED 280 BEAM WITH NEW SERVICEABLE 280 BEAM IAW CRJ 900 SRM 51-42-13-001-001-A01,51-42-21-001-001-A01,AND 51-42-06-001-001-A01.SDR UIEA2021040200801Floorbeam · corrodedFOUND MD CGO SUPPORT STRUCTURE CORROSION AT STA 540 LBL10 - RBL10(<P>REPAIR DAMAGED AREA IAW SRM 53-00-51-2R-3 REPAIR 3. REV 91 AND BOEING DWG NO 65B38027 SH6 REV A, 65B38027 SH7 REV C AND EI NO T2021A53M-957 REV 0. JOB COMPLETED AND CONDITION CHK NORMAL</P>)SDR UIEA2021040200805Floorbeam · corrodedFOUND MD FLOOR BEAM CORROSION AT STA 1580, LBL 90(<P>REPAIR DAMAGED AREA IAW SRM 53-00-51-2R-3 REPAIR 3 REV 91 AND BOEING DWG NO 65B38079 SH9. REV -. JOB COMPLETED AND CONDITION CHK NORMAL.</P>)SDR SWAA2021040760435Floorbeam · crackedPASSENGER CABIN FLOOR PANEL BREAK AT STA 537 BETWEEN BL 0 AND LBL24 IS CRACKED / REMOVED AND REPLACED CABIN FLOOR PANEL BREAK STA 537 BL 0 TO LBL 24 IAW SRM 51-4-02-0G-0 AND DWG: 143A0060 REV:- MPM: 143A5240-35 ATAG: WN9723SDR CALA2021040100407Floorbeam · corrodedB757-53-3-0553 FLOOR BEAM BS 365.25 BL 0 - RBL 60 HAS CORROSION REF HAECO GSO NR 9281269 REPAIRED FLOOR BEAM AT BS 365.25 LBL 10 - RBL 70 PR B757 SRM 53- 00-51 REPAIR 8 AND UAL EC/RA 5315-01159 REF HAECO GSO NR 9281269 HAECO GSO MECH V900579 INSP QC418 V901877SDR SWIA202158197Floorbeam · corroded* THE LBL 9.0 FLOOR BEAM ATTACHMENT TO THE FS 621 BULKHEAD'S SEAT TRACK HAS CORROSION AROUND ITS SCREW HOLES. (C-CHECK RO 5/16/2021) REMOVED AND INSTALLED NEW CARGO TIE-DOWN TRACK AT LBL9 APPROX. FS621 REF CRJ200 AMM 53-00-49-000-801 & 53-00-49-400-80SDR SWIA202158172Floorbeam · corroded* THE FLOOR BEAM AT RBL 9 HAS A SHEARED NUTPLATE ON ITS INBOARD FLANGE AT APPROX. FS 559+6 AND CORROSION AROUND THE NUTPLATE ON ITS OUTBOARD FLANGE AT APPROX. FS 559+6. (MARKED WITH RED GREASE PENCIL) (C-CHECK RO 5/16/2021) REMOVED CORROSION ON FLOOR BESDR SWIA202158169Floorbeam · cracked* THE FS 484 BELOW FLOOR INTERCOSTAL BETWEEN RBL 27 AND RBL 36 HAS A SUSPECTED CRACK ON ITS INBOARD CLIP IN THE TOP RADIUS. (C-CHECK RO 5/16/2021) REMOVED AND REPLACED THE INBD CLIP AT FS 484.00 BELOW FLOOR INTERCOSTAL BETWEEN RBL 27 AND RBL 36 WITH NESDR SWIA202158168Floorbeam · cracked* THE FS 484 BELOW FLOOR INTERCOSTAL BETWEEN LBL 27 AND LBL 36 HAS A CRACKED OUTBOARD CLIP. (C-CHECK RO 5/16/2021) REMOVED THE OTBD BRACKET AT FS484 BETWEEN LBL27 & LBL36 REF. CRJ200 SRM 51-42-21. FABRICATED NEW REPLACEMENT BRACKET PN# S6144-14, PO T000SDR SWAA2021050360107Floorbeam · corrodedAFT CARGO FLOOR SUPPORT AT 727D+5 STRINGER 25L TO 25R IS CORRODED.RBL 21 TO LBL 21; WL 153.5 / REMOVED CORRODED FLOOR SUPPORT TEE STRAP AND INSTALLED NEW SUPPORT TEE AT STA 727D+5 BETWEEN STRINGER 25 L/H AND 25 R/H; PER REF 737 SRM 51-40-02-0G-0 AND DRAWING NOSDR SWAA2021050359870Floorbeam · crackedMAIN CABIN FLOOR SUPPORT BREAK CRACKED @ STA 540 LBL 2 MKD D0T / REMOVED AND REPLACED FLOOR SUPPORT AT MAIN CABIN STA 540 LBL-2 AS PER B-737-7 SRM 51-40-02-0G-0 AND DRAWING # 143A5240.SDR SWAA2021050359871Floorbeam · crackedMAIN CABIN FLOOR SUPPORT BREAK CRACKED @ RBL 2 STA 540 MKD DOT / REMOVED AND REPLACED NEW SUPPORT AT MAIN CABIN RBL 2 STA 540 IN REF B737-700 SRM 51-40-02-0G-0SDR SWAA2021042859922Floorbeam · corrodedCORROSION FLOOR BEAM ON BS 986.5 RBL 43 AND WL 208.1 AFT GALLEY AND LAV / REPAIRED PAX CABIN FLOOR STRUCTURE TRANSVERSAL BEAM AT BS 986.5 RBL 43 AND WL 208.1 AFT GALLEY AND LAV IAW EA #53-0161-21 REV 0 AND SWA EA 21-153-01047 REV IRSDR DU4R2021032900059Floorbeam · corrodedDURING SCHEDULED INSPECTION AT HAECO, LAKE CITY, FLORIDA FOUND MAIN CABIN UNDER FLOOR BEAM HAS EVIDENCE OF CORROSION AT BS 827, LBL 70.53 - RBL 70.53. S/O 660004 N/R 44833SDR SWIA202158551Floorbeam · cracked*COCKPIT FLOOR BEAM LBL9 IS CRACKED AT FS 280.00. (C-CHECK RO 5/25/2021) REPAIRED THE CENTER COCKPIT FLOOR BEAM AT LBL9 REF CRJ-900 SRM 53-11-43-201-003-A01. COMPLIED WITH TASK CARD 51-900-1002-SKYSDR AALA202103319013Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CRACK IN BRAKE ANGLE AT STA 537 BETWEEN RBL 2 AND RBL 22, MEASURING L=1.0 IN, W=0.002 IN, D=0.032 IN. REPLACED BRAKE ANGLE WITH NEW IAW AARD 51-05-05.SDR SWAA2021042760291Floorbeam · crackedPASSENGER CABIN FLOOR SUPPORT CRACKED BS540 RBL25 TO RBL45 WL208. / REMOVED AND REPLACED PASSENGER CABIN FLOOR SUPPORT AT BS 540 RBL 25 TO RBL 45 WL 208 IAW SRM 51-40-02 AND 51-40-05 AND DWG# 143A0060 88911U 03-31-21
Back to JASC 5315