JASC 5315

Service difficulty reports · 44,218

Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5315'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR JR2R20210503697Floorbeam · corrodedFLOOR BEAM AT RBL9 AND FR86 CORRODEDMay 3, 2021 · N89321 · Emb ERJ170200LRSDR JR2R20210503675Floorbeam · corrodedFLOOR CROSS BEAM CORRODED AT RBL12 AND FR14May 3, 2021 · N89321 · Emb ERJ170200LRSDR SWIA2021072259702Floorbeam · corrodedREPLACE LH AND RH FS.280 FLOOR CROSSBEAM WITH SREVICEABLE DUE TO OUT OF LIMITS CORROSION. (C-CHECK RO 7/20/2021) REMOVED AND REPLACED THE LH AND RH FS.280 FLOOR CROSSBEAMS WITH NEW REF CRJ 700 SRM 51-42-06-001-001-A01, 51-42-10-001-001-A01, 51-42-22-00May 1, 2021 · N790SK · Cndair CL6002C10SDR SWIA2021080960148Floorbeam · corrodedCROSSBEAM CAP AT FS 589, LBL9 TO LBL 27 IS CORRODED BEYOND LIMITS, REQUIRES REPLACEMENT. (C-CHECK RO 8/5/2021) REMOVED AND REPLACED CROSSBEAM CAP AT FS 589 LBL 9 TO LBL 27 IAW CRJ 200 SRM 51-40-11, 51-42-06, 51-42-15, AND 51-42-21 REF ATTACHED CONTINUAApr 30, 2021 · N693BR · Cndair CL6002B19SDR CALA2021043000583Floorbeam · corrodedMAIN AFT CABIN FLOOR SUPPORT BEAM HAVE CORROSION Y254 FR68 REMOVED AND INSTALLED NEW HARDPOINT ON LONGERON Y254 BETWEEN FR6 8 AND FR69 I.A.W. A319 SRM 51-42-11/001, 57-44-11/001, 53-41-14- 19-3 FIG. 023. MAINTENANCE PERFORMED BY V934035Apr 30, 2021 · N851UA · Airbus A319131SDR SWIA2021080960158Floorbeam · corrodedCROSSBRAM CAP AT FS559.00+112 IS CORRODED IN MULTIPLE SPOTS BETWEEN RBL27 AND RBL45 (C-CHECK RO 8/5/2021) REMOVED AND REPLACED CROSSBEAM CAP AT FS559.00+ 112 BETWEEN RBL27 AND RBL45 IAW CRJ200 SRM 51-42-06 AND 51-42-15. TOPCOATED NEW CROSSBEAM CAP IAW CApr 27, 2021 · N693BR · Cndair CL6002B19SDR JJBA2021080647020Floorbeam · corrodedAFT WET AREA, RH SIDE FLOOR BEAM IS CORRODED AT F59+19" AND Y+3.5". INSTALLED NEW UPPER BEAM CAP IN AFT WET AREA, RH SIDE FLOOR AT FR 59+19" AND Y+3.5".Apr 27, 2021 · N12136 · Emb EMB145XRSDR JJBA2021080527014Floorbeam · corrodedAFT WET AREA LH SIDE CROSS MEMBER FLOOR SUPPORT IS CORRODED AT F58+8" AND Y-8". REMOVED AND REPLACED LH FLOOR CROSS MEMBER SUPPORT AT F 58=8 AND Y-8.Apr 27, 2021 · N12136 · Emb EMB145XRSDR SWIA202158667Floorbeam · crackedCOCKPIT RH FLOORBEAM AT RBL12 ATTACHING ANGLE FOUND TO BE CRACKED UNDER FLOORBOARD 221ALF (C-CHECK RO 6/04/2021) INSTALLED NEW FLOOR SUPPORT ANGLE AT RBL 12 UNDER FLOOR BOARD 221ALF REF CRJ 700 SRM 51-42-06-001-001-A01, CRJ 700 SRM 51-42-21--001-001-A01Apr 26, 2021 · N702SK · Cndair CL6002C10SDR SWIA202158666Floorbeam · crackedCOCKPIT LH FLOORBEAM AT LBL12 ATTACHING ANGLE FOUND TO BE CRACKED UNDER FLOORBOARD 221ALF (C-CHECK RO 6/04/2021) REMOVED AND REPLACED NEW LH FLOORBEAM ATTACHMENT ANGLE AT LBL12 FWD OF FS280 REF CRJ700 SRM53-11-43-201-003-A01. SEE CONTINUE CARD FOR DETApr 26, 2021 · N702SK · Cndair CL6002C10SDR V0XD20210511003Floorbeam · corrodedFLOOR PANEL 221ALF SUPPORT AT FS 280 IS CORRODED OUT OF LIMITS. CORRECTIVE ACTION: REMOVED AND REPLACED FLOOR PANEL SUPPORT AT FS 280 IAW SRM 53-42-06, 51-42-21, 51-40-11, 51-25-16.Apr 26, 2021 · N925FJ · Cndair CL6002D24SDR SWIA2021080960143Floorbeam · crackedLBL 9 BOTH INBD AND OUTBD CLIPS ARE CRACKED AT FS 280. (C-CHECK RO 8/5/2021) REMOVED AND REPLACED CLIPS IAW CRJ-200-SRM-51-42-21Apr 25, 2021 · N693BR · Cndair CL6002B19SDR SWIA2021080960142Floorbeam · crackedRBL 9 BOTH INBD AND OUTBD CLIPS ARE CRACKED AT FS 280. (C-CHECK RO 8/5/2021) REMOVED AND REPLACED CLIPS IAW CRJ-200-SRM-51-42-21Apr 25, 2021 · N693BR · Cndair CL6002B19SDR SWIA2021080960140Angle · corrodedFS 280 FWD "J" ANGLE IS CORRODED. (C-CHECK RO 8/5/2021) REMOVED DAMAGED FS 280 FWD 'J' ANGLE AND INSTALLED WITH NEW SERVICEABLE ANGLE IAW: CRJ200-SRM-51-42-06, AND 51-40-11Apr 25, 2021 · N693BR · Cndair CL6002B19SDR SWIA2021070759326Floorbeam · damaged*MISSING FASTENER HEAD, UNDERSIDE OF FLOOR BEAM RBL9 AFT OF FS 280.00 (C-CHECK RO 7/5/2021) REMOVED AND REPLACED FASTENER WITH MISSING HEAD, LOCATED UNDERSIDE OF FLOOR BEAM RBL 9 AFT OF FS 280.00 REF. CRJ-700 SRM 51-42-13-001-001-A01Apr 25, 2021 · N612QX · Cndair CL6002C10SDR SWIA202159109Floorbeam · corrodedUPON REMOVAL OF FLOOR SUPPORT STRUCTURE FOUND LH SIDE OF FS280.00 FLOOR BEAM CORRODED BETWEEN LBL9 (C-CHECK RO 6/22/2021) REMOVED AND REPLACED LHS FS280 FLOOR BEAM. REF. CRJ900 SRM 51-42-06-001-001-A01, SRM 51-42-13-001-001-A01, SRM 51-42-21-001-001-A01Apr 25, 2021 · N800SK · Cndair CL6002D24SDR SWIA202158665Floorbeam · crackedCOCKPIT RH FLOORBEAM AT RBL12 JUST FWD OF FS280.00 WAS CRACKED (C-CHECK RO 6/04/2021) INSTALLED NEW FLOOR BEAM SECTOR, -40 OUTBOARD ANGLE,-36 INBOARD UPPER ANGLE -38 INBOARD LOWER ANGLE,-42 LOWER ANGLE ON R/H COCKPIT FLOOR BEAM REPAIR AT RBL 12 REF CRJ Apr 25, 2021 · N702SK · Cndair CL6002C10SDR SWIA202158664Floorbeam · crackedCOCKPIT LH FLOORBEAM AT LBL12 JUST FWD OF FS280.00 WAS CRACKED (C-CHECK RO 6/04/2021) INSTALLED NEW FLOOR BEAM SECTION P/N 690-53-11-228-003, -37 INBOARD LOWER ANGLE,-41 LOWER ANGLE,-39 OUTBOARD ANGLE AT LBL 12 REF CRJ 700 SRM 53-11-43-201-003-A01 TYPE Apr 25, 2021 · N702SK · Cndair CL6002C10SDR AALA202105049028Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: FOUND CORROSION IN AFT CABIN FLOOR BEAM UPPER STRUCTURE AROUND FASTENER HOLE AT STA 986.5 AND LBL52 ABOUT 2 INCH INBOARD OF THE AFT ENTRY DOOR CREASE ANGLE. INSTALLED STRAP REPAIR IAW EA 327262.Apr 25, 2021 · N837NN · Boeing 737823SDR SWIA2021062358938Floorbeam · corroded*FLOOR SUPPORT ON AFT SIDE OF FS 280 FOR CRAWL WAY PANEL 141ALF HAS EVIDENCE OF CORROSION. (C-CHECK RO: 6/20/21) / REMOVED CORROSION AND FOUND TO BE OUT OF LIMITS. REMOVED AND REPLACED CRAWLWAY FLOOR SUPPORT SUPPORT ANGLE FOR PANEL 141ALF AFT OF FS280 WITH Apr 24, 2021 · N603SK · Cndair CL6002C10SDR SWIA2021062358914Floorbeam · cracked*FS 280 CROSSBEAM / RBL 9 FLOOR BEAM OUT BOARD ATTACH ANGLE HAS EVIDENCE OF CRACK AT UPPER END IN RADIUS. (C-CHECK RO: 6/20/21) / REMOVED AND REPLACED FS 280 CROSSBEAM / RBL 9 FLOOR BEAM OUT BOARD ATTACH ANGLE IAW CRJ 700 SRM 51-42-21-001-001-A01 AND DWG CCApr 24, 2021 · N603SK · Cndair CL6002C10SDR SWIA2021062358913Floorbeam · corroded*FS 280 FLOOR SUPPORT ANGLE FOR COCKPIT FLOOR PANEL 221ALF HAS EVIDENCE OF CORROSION. (C-CHECK RO: 6/20/21) / REMOVED CORROSION AND FOUND TO BE OUT OF LIMITS. REMOVED AND INSTALLED NEW FS280 FWD FLOOR SUPPORT ANGLE. REF BOMBARDIER DWG CC670-33052 REV -F ANDApr 24, 2021 · N603SK · Cndair CL6002C10SDR SWIA202158140Floorbeam · corrodedCORROSION- AFT WET AREA, RH OUTBD FLOOR SUPPORT PANEL HAS CORROSION AT FR 90 AS MARKED. (C-CHECK RO 5/8/2021) REMOVED AND REPLACED AFT WET AREA, RH OUTBD FLOOR SUPPORT PANEL AT FR 90 REF EMB SRM 51-40-08Apr 24, 2021 · N156SY · Emb ERJ170200LRSDR FDEA202104241022Floorbeam · crackedMAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE - CROSSBEAM CRACKED, AT FR64, BETWEEN -Y1456 AND -Y1959 REPAIRED THE MAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE CRACKED CROSSBEAM AT FR64 BETWEEN -Y1456 AND -Y1959 PER A300-600F SRM53-10-15 FIG 211. THIS IS CAApr 24, 2021 · N660FE · Airbus A300F4605RSDR ASAA2021042334840Floorbeam · corrodedFLOOR BEAM STA 986.5 LBL4 - RBL32 CORRODED GROUNDED - YES. CUT AND REMOVED DAMAGE PART RBL8-RBL45, FABRICATED, LOCATED, DRILLED AND INSTALLED NEW REPAIR PARTS IAW B737-800 SRM 53-70-51-2R-4 REPAIR 4 W 2.5" O .150" R .110" L 3'1" D .032"Apr 23, 2021 · N532AS · Boeing 737890SDR ASAA2021042334737Floorbeam · corrodedAFT CABIN AREA FLOORBOARD SUPPORT BEAM HAS CORROSION AT FR68 RBL31 GROUNDED - YES. CHECK LIMITS AND FOUND TO BE OUT OF LIMITS IAW A320 SRM 53-41-14. 50% MATERIAL LOSS. REMOVED AND REPLACED SUPPORT BEAM IAW SRM 51-72-11 AND AIRBUS DWG D53472840.Apr 23, 2021 · N625VA · Airbus A320214SDR UIEA2021041400885Floorbeam · corrodedFWD CARGO LOWER DOOR CUTOUT FLOOR BEAM T-CHORD CORROSION AT STA 580. REMOVED CORROSION ON THE FWD CARGO FLOOR BEAM T-CHORD AT STA 580 ORIG. MAT. WAS .100 REMAINING MAT. IS .070 FOUND TO BE OUT OF LIMITS AFTER DAMAGE REMOVAL IAW B767 SRM 53-00-15 ASSET #002266Apr 23, 2021 · N1489A · Boeing 76731KSDR UIEA2021041400889Floorbeam · corrodedFWD CARGO LOWER DOOR CUTOUT FLOOR BEAM T-CHORD CORROSION AT STA 560+17(<P>REMOVED CORROSION AT FWD CARGO FLOOR BEAM T-CHORD STA 560+17. ORIG. MAT. .100 REMAINING MAT. .060 FOUND TO BE OUT OF LIMITS. REMOVED,LOCATED,DRILLED, AND INSTALLED NEW FLOOR BEAM T-CHORDApr 23, 2021 · N1489A · Boeing 76731KSDR UIEA2021041500908Floorbeam · corrodedFWD CARGO STA 560 RBL44 APPROX FLOOR BEAM T-CHORD CORRODED. REMOVED CORROSION AT FWD CARGO STA 560 RBL44 FLOOR BEAM T-CHORD. ORIG. MAT. WAS .100 REAINING MAT. IS .050 FOUND TO BE OUT OF LIMITS. REMOVED,FABRICATED, AND INSTALLED NEW T-CHORD PN:BAC1506-3123 707Apr 23, 2021 · N1489A · Boeing 76731KSDR UIEA2021041600911Floorbeam · corrodedFWD CARGO LOWER DOOR CUTOUT FLOOR BEAM T-CHORD CORROSION AT STA 560+10(<DIV>REMOVED CORROSION AT FWD CARGO STA 560+10 FLOOR BEAM T-CHORD. ORIG. MAT. WAS .100 REMAINING MAT. IS .055 FOUND TO BE OUT OF LIMITS. REMOVED,LOCATED,DRILLED,AND INSTALLED NEW T-CHORD PNApr 23, 2021 · N1489A · Boeing 76731KSDR SWIA2021072259694Floorbeam · cracked* L/H COCKPIT FLOOR BEAM FOUND "CRACKED" AT LBL 12.00 AND F.S. 280.00 INTERFACE IN RADIUS (MARKED). (C-CHECK RO 7/20/2021) REMOVED AND REPLACED L/H COCKPIT FLOOR BEAM AT LBL 12.00 USING EXISTING INBOARD UPPER ANGLE, INBOARD LOWER ANGLE, LOWER ANGLE AND Apr 22, 2021 · N790SK · Cndair CL6002C10SDR SWAA2021060365742Floorbeam · corroded***CORROSION*** ON LATERAL BEAM AT 270; L.B.L. 10 - R.B.L. 10; W.L. 207.54. / REPAIRED LATERAL BEAM AT BS 270; L.B.L.10 - RBL 10; WL 207.54 PER EA # 1-A53-13812 REV 3Apr 22, 2021 · N412WN · Boeing 7377H4SDR SWAA2021052766468Floorbeam · corrodedCORROSION FLOOR BEAM UPPER AREA LOCATED BS 986.5 BTW RBL 44 AND LBL 44 AT AFT GALLEY AREA / REPAIRED FLOOR BEAM UPPER AREA LOC BS986.5 BTW LBL40 TO LBL50 IAW SWA EA #21-153-01264 REV IR AND AEROMAN EA #53-0216-21 REV 0 AND PAGE 1-2 PART 1Apr 21, 2021 · N939WN · Boeing 7377H4SDR DALA2021042202355Floorbeam · corrodedSHIP 3244 CORROSION FLOOR STRUCTURE BEAM LOCATED AT FR 66-Y1292 AT AFT GALLEY AREA. CORRECTIVE ACTION: REPLACED FLOOR BEAM PER A320 SRM 51-72-11. (1788076)Apr 21, 2021 · N344NW · Airbus A320212SDR SWIA2021072259680Floorbeam · corroded* COCK PIT FLOOR PANEL AFT SUPPORT ANGLE CORRODED AT FS280.00 (MARKED). (C-CHECK RO 7/20/2021) REMOVED AND REPLACED F.S.280.00 COCKPIT AFT FLOOR SUPPORT ANGLE DUE TO OUT OF LIMIT CORROSION IN REF DWG CC670-33052, REV G, CRJ700 SRM 51-42-06-001-001-A01 AApr 20, 2021 · N790SK · Cndair CL6002C10SDR SWIA202158654Floorbeam · corrodedCORROSION AROUND FASTENER HOLE FOR NUTPLATE ON FLOOR CROSSBEAM AT FS333. (C-CHECK RO 6/04/2021) COMPLIED WITH REO 670-53-21-2023 REV -- 2021-05-08 TO REPAIR CROSSBEAM AT FS333 LBL18. / COMPLIED WITH SKYWEST TASKCARD 51-900-1002-SKY.Apr 20, 2021 · N702SK · Cndair CL6002C10SDR IPXA2021051869572Floorbeam · crackedINSPECTION TYPE:3CCENTER CARGO FLOOR SUPPORT ANGLE AT STA 1841 IS CRACKED UNDER L/H FLOOR PANEL 183GH.REMOVED AND REPLACED CRACKED CENTER CARGO FLOOR SUPPORT AT STA 1841 UNDER FLOOR PANEL 183GH IAW SRM 51-31-01. (MINOR)Apr 20, 2021 · N265UP · Doug MD11FSDR SWIA202158643Floorbeam · corrodedCORROSION FOUND ON FS280.00 FLOOR BEAM L/H (C-CHECK RO 6/04/2021) INSTALLED NEW LH FS280.00 CROSSBEAM REF BOMBARDIER DWG.NO. CC670-34010 REV -B, CRJ-700 SRM 51-42-22-001-001-A01, CRJ-700 SRM 51-42-21-001-001-A01, CRJ-700 SRM 51-42-13-001-001-A01 AND CRApr 18, 2021 · N702SK · Cndair CL6002C10SDR SWIA202158642Floorbeam · corrodedCORROSION FOUND ON FS280.00 FLOOR BEAM R/H (C-CHECK RO 6/04/2021) INSTALLED NEW SERVICEABLE R/H FS 280 FLOOR BEAM REF CRJ 700 SRM 51-42-21-001-001-A01, CRJ 700 SRM 51-42-13-001-001-A01, CRJ 700 SRM 51-42-06-001-001-A01 AND DWG. NO. CC670-34010 REV -K. CApr 18, 2021 · N702SK · Cndair CL6002C10SDR AALA202104301155Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: FOUND CORRODED AREA, MEASURING 1.5 BY 1.5 BY 0.065 INCH, ON FLOOR BEAM AT FR16, Z-500, AND Y1292. REMOVED AND REPLACED FLOOR BEAM REF SRM 51-72-11 AND SRM 51-42-11.Apr 18, 2021 · N653AW · Airbus A320232SDR AALA202104308612Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: FOUND CORRODED AREA MEASURING 1.5 INCH DIAMETER BY 0.058 INCH DEEP ON FLOOR BEAM AT STR 23L, -Z500 AND Y765. REMOVED AND REPLACED FLOOR BEAM REF SRM 51-72-11 AND SRM 51-42-11.Apr 18, 2021 · N653AW · Airbus A320232SDR SWIA202158634Floorbeam · corroded* FS280 FLOOR SUPPORT, FILLET SEAL COMPROMISED AND CORROSION DETECTED. (C-CHECK RO 6/04/2021) REMOVED AND REPLACED OUT OF LIMITS FS280 FLOOR SUPPORT ANGLE REF CRJ700 SRM 51-42-06-001--001-A01, SRM 51-42-21-001-001-A01 AND DWG CC670-34010 REV -K COMPLIEDApr 17, 2021 · N702SK · Cndair CL6002C10SDR HNAA2021051900211Floorbeam · corrodedSSI 53-20-11 L/H FLOOR BEAM HAS CORROSION AT CROSS BEAM AT FRAME 54. REPAIRED LH CABIN OMEGA BEAM AFT OF FR 54 CROSS MEMBER IAW ETD2021-145-012775 AND EO1-53-21-0105Apr 17, 2021 · N644AE · Emb EMB145LRSDR AALA202105136522Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: L=0.700 INCH, W=0.595 INCH, D=0.045 INCH CORRODED AREA ON FLOOR BEAM -Y254 AT LEVEL OF FR 20. PERFORMED PERMANENT REPAIR OF FLOOR BEAM -Y254 AND AT LEVEL OF FR 20.Apr 16, 2021 · N137AA · Airbus A321231SDR AALA202105139423Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: L=1.086 INCH, W=0.530 INCH, D=0.025 INCH CORRODED AREA ON FLOOR BEAM -Y254 AT LEVEL OF FR16. PERFORMED PERMANENT REPAIR OF FLOOR BEAM -Y254 AT LEVEL OF FR16.Apr 16, 2021 · N137AA · Airbus A321231SDR SWAA2021050364613Floorbeam · corrodedE16461 -- FWD CARGO COMP. FLOOR SUPPORT ANGLE AT BS500D BETWEEN S25L & S25R WITH SEVERAL SPOTS OF CORROSION. / REPLACED FWD CARGO COMP FLOOR SUPPORT ANGLE AT STA 500D BETWEEN STR25L & STR25R TAG # WN1446 P.O. # 1684224; ANGLE BEING INSTALLED ON CARD # 5330-E-1Apr 16, 2021 · N435WN · Boeing 7377H4SDR KCSA202104151045Floorbeam · crackedMAIN DECK LATERAL FLOOR BEAM SUPPORT CRACKED AT STA 1080 RBL 98Apr 15, 2021 · N700CK · Boeing 7474R7FSDR JR2R202104152039Floorbeam · corrodedFLOOR BEAM R/H AT FRAME 17 IS CORRODED OUT OF LIMITS. REPAIRED FLOOR BEAM IAW EMBRAER 175 SRM 53-10-10.Apr 15, 2021 · N89308 · Emb ERJ170200LRSDR JR2R202104152076Floorbeam · corrodedLONGITUDINAL FLOOR BEAM AT RBL 9 AND FR 84 CORRODED OUT OF LIMITS. REPAIRED FLOOR BEAM IAW EMBRAER ETD 2021-170-010285.Apr 15, 2021 · N89308 · Emb ERJ170200LRSDR SWIA2021090360680Angle · corrodedFWD "J" ANGLE IS CORRODED AT FS 280 BETWEEN LBL 9 AND RBL 9 (C-CHECK RO 8/31/21) FWD "J" ANGLE AT FS 280 BETWEEN LBL 9 AND RBL 9 WAS REMOVED AND REPLACED AS REQUIRED IAW CRJ 700 SRM 51-42-06-001-001-A01. SEE ATTACHED CONTINUATION CARD FOR DETAILS OF WORK PApr 13, 2021 · N703SK · Cndair CL6002C10
Back to JASC 5315