JASC 5315

Service difficulty reports · 44,218

Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5315'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR SWAA2021031750532Crease Beam · corrodedAFT CABIN WET AREA STA 960-982; BL54R; WL208; CREASE BEAM INNER CHORD ANGEL UPPER SURFACE; CORROSION; MRK'D. / CORROSION FOUND TO BE OUT OF LIMITS PER SRM 53-70-15-1A-1 ORIG T: .080 LOSS: .012 REMAINING: .068 REMOVED AND REPLACED R2 CREASE BEAM FROM STA 887+5 Feb 22, 2021 · N8612K · Boeing 7378H4SDR FDEA202102220419Floorbeam · corrodedMAIN CABIN BS 1200 FLOOR BEAM HAS AREAS OF CORROSION ON UPPER SURFACE BETWEEN BL0 AND LBL 24. REMOVED CORROSION AT MAIN CABIN BS 1200 FLOOR BEAM ON UPPER SURFACE BETWEEN BL0 AND LBL 24 IAW B 757 SRM 51-10-02-OG.EVALUATED AREAS ORIG MAT .125" LOWEST READIFeb 22, 2021 · N973FD · Boeing 757200SDR FDEA202102220421Floorbeam · corrodedMAIN CABIN FLOOR PANEL SUPPORT ANGLE UPPER SURFACE HAS AREAS OF CORROSION AT BB BB BS 1020 BETWEEN BL0 AND LBL 24. ACCOMPLISH WITH FEDEX E.A.#:F-5310-T0359922 P1. TITLE: FUSELAGE - MAINFRAME - MAIN CARGO FLOOR SUPPORT STA 1020 CORRODED,NEW PART FABRICATIFeb 22, 2021 · N973FD · Boeing 757200SDR FDEA202102220420Floorbeam · corrodedMAIN CABIN FLOOR PANEL SUPPORT ANGLE UPPER SURFACE HAS AREAS OF CORROSION AT BS 1055 BETWEEN BL0 AND LBL 24. ACCOMPLISH WITH FEDEX E.A.#:F-5310-T0359923 P1. TITLE: FUSELAGE - MAINFRAME - MAIN CARGO FLOOR SUPPORT STA 1055 CORRODED,NEW PART FABRICATION - TEMFeb 22, 2021 · N973FD · Boeing 757200SDR SWIA202157487Floorbeam · crackedFOUND FLOOR SUPPORT ANGLE TO BE CRACKED AT F.S 621 BETWEEN LBL27 AND LBL 36. (C-CHECK RO 4/12/2021) REPAIRED DAMAGE BY REMOVING AND INSTALLING NEW REPAIR ANGLE IAW CRJ 200 SRM 51-42-06 AND 51-42-21. COMPLETED TASK CARD 51-900-1003-SKY AND ATTACHED COMPFeb 21, 2021 · N908EV · Cndair CL6002B19SDR SWIA202156989Strap · corroded*CORROSION ON FLOOR SUPPORT STRAP BETWEEN RBL27 €“ RBL45 AT FS 559.00 (C-CHECK) RO 3/24/2021 FLOOR SUPPORT STRAP BETWEEN RBL27 €“ RBL45 AT FS559.00 HAS CORROSION ACROSS ENTIRE LENGTH. REPLACEMENT IS NECESSARY WHEN MORE THAN 30% OF ITS LENGTH IS DAMAGED.Feb 21, 2021 · N909SW · Cndair CL6002B19SDR SWIA202157475Floorbeam · crackedFS 484 INTERCOSTAL BETWEEN LBL27 AND LBL36 IS CRACKED ON THE OUTBARD SIDE. (C-CHECK RO 4/12/2021) REPAIRED F.S.484 INTERCOSTAL BETWEEN LBL 27 AND LBL36 IAW CRJ 200 MHIRJ REO 601R-53-41-2872 REV. --, DATED 2021-03-09. / MAJOR REPAIR FORM M-337 IS COMPLEFeb 20, 2021 · N908EV · Cndair CL6002B19SDR SWIA202157184Floorbeam · corrodedF.S 280 FLOOR BEAM CORRODED AT LBL11-RBL11 (C-CHECK RO 4/1/2021) REMOVED AND REPLACED FS280.00 FLOOR BEAM AT FLOOR LEVEL RBL11 & LBL11. REF CRJ700 CRJ700 SRM 51-42-06-001-001-A01 AND REF CRJ700 SRM 51-42-10-001-001-A01, CRJ700 SRM 51-42-21-001-001-A01, CRFeb 17, 2021 · N791SK · Cndair CL6002C10SDR FDEA202102160452Floorbeam · corrodedCENTER CARGO COMPT CEILING STA 1761 LBL 18 MAIN DECT FLOORBOARD SUPPORT CORRODED AT NUT CLIPS. MRKDFeb 16, 2021 · N318FE · Doug MD1030FSDR FDEA202102160450Floorbeam · corrodedCENTER CARGO COMPT CEILING STA 1661 RBL 65 MAIN DECK FLOORBOARD SUPPORT CORRODED. MRKD REMOVED AND REPLACED FLOOR SUPPORT, P/N: AFA 3853-21 AT STA 1661 @ RBL 62 TO RBL 68 IN REF TO DWG # AFA 3853.Feb 16, 2021 · N318FE · Doug MD1030FSDR SWAA2021031851347Beam · corrodedCORROSION FLOOR STRUCTURE BEAM LOCATED BS 986.5 AT LEVEL WL 208.1 RBL 43 AT AFT GALLEY AREA / REPAIRED PAX CABIN FLOOR STRUCTURE TRANSVERSAL BEAM AT BS 986.5 AND RBL 43 AND WL 208.1 IAW EA # 21-153-00607 REV IR EA # 53-0086-21 REV 0 AND PART 1Feb 16, 2021 · N937WN · Boeing 7377H4SDR FDEA202102160605Floorbeam · corrodedCENTER CARGO COMPT CEILING STA 1561 RBL 60 MAIN DECK FLOORBOARD SUPPORT BRACKET CORRODED AT NUT CLIP. FABRICATED AND INSTALLED FLOOR BOARD SUPPORT P/N AFA3853-33 AT STA 1561 RBL 60 REF SRM 51-35-01 VOL 2 AND DWG AFA3583Feb 16, 2021 · N318FE · Doug MD1030FSDR FDEA202102160474Floorbeam · corrodedCENTER CARGO COMPT CEILING STA 1561 RBL 10 MAIN DECK FLOORBOARD SUPPORT CORRODED AT NUT CLIP. MRKD MAIN CARGO AT STA 1561 RBL 10 REMOVED AND REPLACED FLOOR SUPPORT AFA3853 REF MD10-30 SRM 51-31-01 VOL 2.Feb 16, 2021 · N318FE · Doug MD1030FSDR FDEA202102160462Floorbeam · corrodedCENTER CARGO COMPT CEILING STA 1821 RBL 10-20 MAIN DECK FLOORBOARD SUPPORT HAS CORROSION AT 3 NUTCLIPS. MRKD REMOVED AND REPLACED FLOOR BOARD SUPPORT CENTER CARGO COMPT CEILING STA 1821 RBL 10-20 MAIN DECK. REF. SRM 51-31-01, VOL II.Feb 16, 2021 · N318FE · Doug MD1030FSDR DALA2021030101123Floorbeam · corrodedDURING INSPECTION MAINTENANCE FOUND CORROSION LEVEL 2 ON FLOOR BEAM STA 377 BTW LBL 10 TO LBL 24 AND LBL 51 TO LBL 54 AT PAX CABIN FLOOR STRUCTURE. REPAIRED PER ERA 481634-14. (LP 1732084)Feb 16, 2021 · N594NW · Boeing 757351SDR FDEA202102160453Floorbeam · corrodedCENTER CARGO COMPT CEILING STA 1741 LBL 35 MAIN DECK FLOORBOARD SUPPORT CORRODED AT NUT CLIPS. MRKD REMOVED CORRODED SUPPORT & INSTALLED NEW FABRICATED FLOOR SUPPORT AT STA. 1741 LBL 35 PER SRM 51-35-01 VOL II AND DWG AFA3853Feb 16, 2021 · N318FE · Doug MD1030FSDR FDEA202102160463Floorbeam · corrodedCENTER CARGO COMPT CEILING STA 1761 RBL 10-20 MAIN DECK FLOORBOARD SUPPORT CORRODED AT NUT CLIPS. MRKD REMOVED AND REPLACED FLOOR SUPPORT AT STA. 1761 RBL 10-20 PER SRM 51-35-01 VOL II AND DWG ACA3140Feb 16, 2021 · N318FE · Doug MD1030FSDR SIMA20210216009Angle · crackedRIGHT FLOOR SUPPORT ANGLE AT FR 59 IS CRACKED ON OUTBD EDGE. -C/A- INSTALLED NEW FLOOR SUPPORT IAW SRM 51-40-02.Feb 16, 2021 · N928AE · Emb EMB145LRSDR DALA2021021700893Floorbeam · bentSHIP 3240 BENT INTERNAL STRUCTURE CROSS BEAM LOCATED AT FR 29 BTW STR 38L TO STR 38R IN FWD CARGO COMPARTMENT. CORRECTIVE ACTION: REPLACED CROSS BEAM PER A320 SRM 51-42-11 AND A320 SRM 51-72-11. (1732178)Feb 16, 2021 · N340NW · Airbus A320212SDR ABXA2021215021Floorbeam · corrodedDURING C-CHECK, CORROSION ON FWD CARGO STA 654 FLOOR BEAM UPPER CAP BOTTOM SIDE ARPOUND NUT PLATES LBL 10. REMOVED CORROSION AT FWD CARGO STA 654 FLOOR BEAM UPPER CAP IAW B767-300 SRM 51-10-02. EVALUATED DAMAGE, ORIGINAL MATERIAL THICKNESS IS .102, MAT LOSS IFeb 15, 2021 · N219CY · Boeing 767383SDR MASA20210316093Floorbeam · corrodedCORROSION ON FLOOR BEAM [ UPPER/AFT FLANGE] IN STA. FS= 280 AND 11LBL TO 14LBL AT PAX CABIN FWD WET AREA. (W1) (CPAX)|LF FLOOR BEAM WAS REPLACED PER CRJ900 SRM 51-42-06-001-001-A01 AND SRM 51-42-20-001-001-A01Feb 15, 2021 · N948LR · Cndair CL6002D24SDR YENA2021021900123Floorbeam · corrodedDURING HMV, CORROSION FLOOR BEAM +Y599.9 FR 68 AT AFT GALLEY AREA ; REMOVED AND REPLACED FLOOR BEAM +Y599.9 AT FR 68 IN AFT GALLY ARE IAW A320 SRM 51-72-11. WORK ACCOMPLISHED ON AEROMAN NR 2021-060833Feb 15, 2021 · N949JT · Airbus A321231SDR YENA2021021900122Floorbeam · corrodedDURING HMV, CORROSION FLOOR BEAM +Y765 BTW FR68 AT AFT GALLEY AREA ; REMOVED AND REPLACED FLOOR BEAM +Y765 AT FR 67 IAW A320 SRM 51-72-11. WORK ACCOMPLISHED ON AEROMAN NR 2021-060832Feb 15, 2021 · N949JT · Airbus A321231SDR YENA2021021900107Floorbeam · corrodedDURING HMV, EC E21-042-01 FUSELAGE / CENTER FUSELAGE III / FLOOR STRUCTURE BEAMS AT FR85 AND Y-273 & Y+273 / CORROSION - PERMANENT REPAIR /// THIS IS CONSIDERED A MAJOR REPAIR.Feb 15, 2021 · N294JB · Emb ERJ190100IGWSDR SWIA202157171Floorbeam · corrodedFS280 CAP ANGLE IS CORRODED AND BENT AT FLOOR LEVEL, RBL9 (C-CHECK RO 4/1/2021) REMOVED AND REPLACED THE FS280 CAP AT FLOOR LEVEL RBL9. REF CRJ700 SRM 51-42-06-001-001-A01 AND REF CRJ700 SRM 51-42-13-001-001-A01. COMPLIED WITH TASK CARD 51-900-1002-SKY.Feb 14, 2021 · N791SK · Cndair CL6002C10SDR SWIA202157169Floorbeam · corrodedFS280 CAP ANGLE IS CORRODED AND BENT AT FLOOR LEVEL, LBL9 (C-CHECK RO 4/1/2021) REMOVED AND REPLACED FS280 CAP ANGLE AT FLOOR LEVEL LBL9. REF DWG CC670-34010 REV K, CRJ700 SRM 51-42-06-001-001-A01 AND REF CRJ700 SRM 51-42-13-001-001-A01 . COMPLIED WITH TAFeb 14, 2021 · N791SK · Cndair CL6002C10SDR MASA20210308070Floorbeam · corrodedCORROSION ON FLOOR BEAM [UPPER/AFT FLANGE] IN STA FS=280 AND 11RBL TO 13RBL AT PAX FWD WET AREA|FLOOR BEAM WAS REPLACED FRO A NEW ONE PER CRJ900 SRM 51-92-06-001-001-A01 AND SRM 51-42-71-001-001-A01Feb 14, 2021 · N948LR · Cndair CL6002D24SDR DALA2021021900963Floorbeam · crackedSHIP 3240 CRACKS WERE FOUND IN HOLE NR 2 AND HOLE NR 3 OF CROSSBEAM JUNCTION FR 16 LHS. CORRECTIVE ACTION: INSPECT CRACKS AND CONT ON MON. OK FOR CONTINUED SERVICE. (1730391)Feb 14, 2021 · N340NW · Airbus A320212SDR SWIA202157213Floorbeam · corroded*AVIONICS BAY FORWARD FLOORBOARD SUPPORT ON THE AFT SIDE OF THE FS280.00 FRAME IS CORRODED AT MULTIPLE AREAS ON BOTH THE TOP AND LOWER SURFACE. (MARKED) (C-CHECK RO 4/1/2021) REMOVED AND REPLACED MAIN AVIONICS BAY FORWARD FLOORBOARD SUPPORT ON THE AFT SIDFeb 13, 2021 · N791SK · Cndair CL6002C10SDR SWIA202157204Floorbeam · cracked*FS 280 BEAM / RBL 12 ANGLE BRACKET HAS EVIDENCE OF CRACK AT TOP OF RADIUS. (C-CHECK RO 4/1/2021) REMOVED AND REPLACED BRACKET, FS280, RBL12, REF CRJ 700 SRM 51-42-21-001-001-A01Feb 13, 2021 · N791SK · Cndair CL6002C10SDR SWIA202157152Floorbeam · corrodedFS 280 FLOOR SUPPORT ANGLE FOR COCKPIT FLOORBOARD 221ALF HAS EVIDENCE OF CORROSION. (C-CHECK RO 4/1/2021) REMOVED & REPLACED FS 280 FLOOR SUPPORT ANGLE FOR COCKPIT FLOORBOARD 221ALF REF CRJ-700 SRM51-42-06-001-001-A01 AND DWG# CC670-33052 REV G. COMPLIED Feb 13, 2021 · N791SK · Cndair CL6002C10SDR MASA20210308069Floorbeam · crackedCRACK ON LONGITUDINAL FLOOR BEAM 12RBL IN STA. FS=279 AT COCKPIT |FLOOR BEAM 12RBL WAS REPAIRED PER CRJ900 SRM-53-11-43-201-003-A01Feb 13, 2021 · N948LR · Cndair CL6002D24SDR MASA20210308068Floorbeam · crackedCRACK ON LONGITUDINAL FLOOR BEAM 12LBL IN STA. FS-279 AT COCKPIT|FLOOR BEAM WAS REPAIRED PER CRJ900 SRM 53-11-43-201-003-A01Feb 13, 2021 · N948LR · Cndair CL6002D24SDR CALA2021021500172Floorbeam · corrodedCABIN STA 303 LBL 36 TO 53 FLOOR BEAM FOUND CORROSION REFER NR LP 9130939 CABIN STA 303 LBL 36 TO 53 FLOOR BEAM UPPER CHORD PERMANENT REPAIRED AS PER SRM 53-00-51 REPAIR 1 FIG 201 AND ECRA 5315-01153 REV.Feb 13, 2021 · N655UA · Boeing 767322SDR SWIA202157063Floorbeam · corrodedA-BAY FS280 FLOOR SUPPORT ANGLE IS CORRODED (C-CHECK) RO 3/25/2021 REMOVED AND INSTALLED NEW FLOOR SUPPORT ANGLE P/N#CC670-34256-1 ASSY. IN A-BAY FS280.00 REF. CRJ-700 SRM 51-42-06-001-001-A01, CRJ-700 SRM 51-42-21-001-001-A01 AND DWG # CC670-34010 REV K Feb 12, 2021 · N625CA · Cndair CL6002C10SDR DALA2021021100797Floorbeam · corrodedDURING INSPECTION MAINTENANCE FOUND LEVEL 2 CORROSION ON FLOOR BEAM AT STA 1640 BTW RBL 51 TO RBL 60. FLOOR BEAM REPAIRED PER SRM. (LP 1727639)Feb 11, 2021 · N594NW · Boeing 757351SDR SWIA202157519Floorbeam · crackedF.S. 280 LBL 9 INBOARD AND OUTBOARD SUPPORT CLIPS ARE CRACKED. (C-CHECK RO 4/12/2021) REMOVED AND REPLACED I/B AND O/B SUPPORT CLIPS AT FS280 LBL 9 IAW CRJ 200 SRM 51-42-06 & 51-42-21 OPS TEST GOODFeb 10, 2021 · N908EV · Cndair CL6002B19SDR SWIA202157518Floorbeam · crackedINTERCOSTAL CLIP CRACKED AT F.S. 484.00 BETWEEN LBL27 AND LBL36 (C-CHECK RO 4/12/2021) REMOVED AND REPLACED INTERCOSTAL CLIP AT F.S. 484.00 LBL 27 IAW CRJ 200 SRM 51-40-11, 51-42-06, AND 51-42-21. INTERCOSTAL CLIP AT F.S. 484.00 LBL 36 REFERENCE JOB: 97Feb 10, 2021 · N908EV · Cndair CL6002B19SDR SWIA202157506Floorbeam · crackedF.S. 280 RBL 9 SUPORT CLIP IS CRACKED. (C-CHECK RO 4/12/2021) REPAIRED FS280 RBL9 IAW REO 601R-53-21-3407 REV. --, DATED 03/02/2021. FORM 337 AND MAJOR REPAIR TASK CARD 51-900-1003-SKY COMPLETED AND ATTACHED. NO WEIGHT CHANGE. SEE CONTINUATION CARD FOFeb 10, 2021 · N908EV · Cndair CL6002B19SDR SWIA202157505Floorbeam · corrodedFLOOR BEAM AT LBL9 HAS MULTIPLE SPOTS OF CORROSION FROM F.S. 409.00 TO F.S. 409.00+128 (C-CHECK RO 4/12/2021). REMOVED AND REPLACED FLOOR BEAM AT LBL9 FROM FS 409.00-409+128 IAW BOMBARDIER REO 601R-53-31-1187 REV -- DATED 2021-03-08. FORM 337 AND MAJOR REPAIRFeb 10, 2021 · N908EV · Cndair CL6002B19SDR SWIA202157504Floorbeam · corrodedFLOOR BEAM AT RBL9 HAS MULTIPLE SPOTS OF CORROSION FROM F.S. 409.00 TO F.S. 409.00+128 (C-CHECK RO 4/12/2021) REMOVED AND REPLACED FLOOR BEAM AT RBL 9 BETWEEN FS 409-409+128 IAW CRJ 200 SRM 51-42-36, 51-42-21, BOMBARDIER REO 601R-53-00-005 REV.B, DATED Feb 10, 2021 · N908EV · Cndair CL6002B19SDR SWIA202157476Floorbeam · corrodedFLOOR BEAM AT RBL 9 HAS MULTIPLE SPOTS OF CORROSION FROM F.S. 409.00+128 TO F.S. 559.00 (C-CHECK RO 4/12/2021) REMOVED AND REPLACED FLOOR BEAM AT RBL 9 F.S. 409.00+128 TO F.S. 559.00 IAW REO 601R-53-41-2870 REV-- DATED 2021-02-18. FORM 337 AND MAJOR REFeb 10, 2021 · N908EV · Cndair CL6002B19SDR SWIA202157474Floorbeam · corrodedFLOOR BEAM AT LBL9 HAS MULTIPLE SPOTS OF CORROSION FROM F.S. 409.00+128 TO F.S. 559.00 (C-CHECK RO 4/12/2021) REMOVED AND REPLACED FLOOR BEAM AT LBL9 FROM F.S. 409.00+128 TO F.S. 559.00 AS REQUIRED IAW REO 601R-53-41-2871 REV-- DATED 2/12/2021. FORM 3Feb 10, 2021 · N908EV · Cndair CL6002B19SDR SWIA202157473Floorbeam · damagedINTERCOSTAL AT F.S. 484.00 BETWEEN RBL27 AND RBL36 HAS 2 EA BROKEN CLIPS. (C-CHECK RO 4/12/2021) REMOVED AND REPLACED CLIPS IAW CRJ 200 SRMS 51-42-21, 51-42-06, 51-40-11, 51-24-36. REFER TO CONTINUE CARD FOR WORK PERFORMED. FORM 337 AND MAJOR REPAIR TAFeb 10, 2021 · N908EV · Cndair CL6002B19SDR A6WA202102177648Floorbeam · corrodedCORROSION COMMON TO PRESSURE FLOOR ANGLE AT FUSELAGE STATION 439.00 RBL 41 TO RBL 42. ***AIRCRAFT REMOVED FROM SERVICE*** REMOVED CORROSION FS 439 RBL 41 TO RBL 42. .5 INCH WIDE X 1.2 INCH LONG PERFORMED HFEC, NO DEFECTS NOTED. PERFORMED UT THICKNESS CHECK, Feb 10, 2021 · N460AW · Cndair CL6002B19SDR A6WA202102177649Floorbeam · corrodedCORROSION COMMON TO PRESSURE FLOOR ANGLE AT FUSELAGE STATION 461.00 RBL 40 TO RBL 42. ***AIRCRAFT REMOVED FROM SERVICE*** REMOVED CORROSION FS 461 RBL 40 TO RBL 42. .8 INCH WIDE X 2.2 INCH LONG PERFORMED HFEC, NO DEFECTS NOTED. PERFORMED UT THICKNESS CHECK, Feb 10, 2021 · N460AW · Cndair CL6002B19SDR A6WA202102177644Floorbeam · corrodedCORROSION COMMON TO PRESSURE FLOOR ANGLE AT FUSELAGE STATION 513.00+5 RBL 36 TO RBL 42. ***AIRCRAFT REMOVED FROM SERVICE*** REMOVED CORROSION FS 513.00+5 RBL 36 TO RBL 42. SPOT P1, .5 INCH WIDE X 1.0 INCH LONG. P2, .8 WIDE X 1.6 INCH LONG. P3, 1.8 WIDE X Feb 10, 2021 · N460AW · Cndair CL6002B19SDR A6WA202102177645Floorbeam · corrodedCORROSION COMMON TO PESSURE FLOOR ANGLE AT FUSELAGE STATION 499.00+4 RBL 40 TO RBL 42. ***AIRCRAFT REMOVED FROM SERVICE*** REMOVED CORROSION FS 499.00+4 RBL 40 TO RBL 42. 1.0 INCH WIDE X 2.5 INCH LONG PERFORMED HFEC, NO DEFECTS NOTED. PERFORMED UT THICKNESS Feb 10, 2021 · N460AW · Cndair CL6002B19SDR A6WA202102177642Floorbeam · corrodedLIGHT CORROSION COMMON TO PRESSURE FLOOR ANGLE AT FUSELAGE STATION 409.00 +128+3, RBL 43. ***AIRCRAFT REMOVED FROM SERVICE*** REMOVED CORROSION FS409.00+128+3RBL 43. 0.3 INCH WIDE X 0.8 INCH LONG, PERFORMED HFEC NO DEFECTS NOTED. PERFORMED UT THICKNESS CHECFeb 10, 2021 · N460AW · Cndair CL6002B19SDR A6WA202102177643Floorbeam · corrodedCORROSION COMMON TO PRESSURE FLOOR ANGLE AT FUSELAGE STATION 449.85+2 RBL 40 TO RBL 42. ***AIRCRAFT REMOVED FROM SERVICE*** REMOVED CORROSION FS 449.85+2 RBL 40 TO RBL 42. P1, .5 INCH WIDE X 1.1 INCH LONG. P2, 1.0 INCH WIDE X 3.0 INCH LONG. PERFORMED HFEC, Feb 10, 2021 · N460AW · Cndair CL6002B19
Back to JASC 5315