JASC 5315

Service difficulty reports · 44,218

Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5315'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR SWIA202053908Floorbeam · corrodedFLOORBEAM CAP ON RBL 9.00 HAS ONE SPOT OF CORROSION AROUND NUTPLATE JUST AFT OF FS 559.00. C-CHECK RO 11/11/2020. REMOVED AND REPLACED DAMAGED SECTION OF FLOORBEAM CAP AT RBL 9.00 FS 529.00 TO 559.00+16, IAW MHIRJ REO. REFERENCE CONTINUATION FOR WORK PERFORSep 21, 2020 · N926EV · Cndair CL6002B19SDR SWIA202053437Floorbeam · corrodedRT FS 280.00 CROSSBEAM HAS CORROSION JUST INBOARD SIDE OF RBL 9. C-CHECK RO 10/17/2020. REMOVED, REPLACED, AND INSALLED NEW RT FS 280 CROSSBEAM, REF CRJ 700 SRM AND DWG. COMPLIED WITH SKYWEST TASKCARD.Sep 21, 2020 · N631SK · Cndair CL6002C10SDR SWIA202053436Floorbeam · corrodedLT FS 280.00 CROSSBEAM HAS CORROSION JUST INBOARD SIDE OF LBL 9. C-CHECK RO 10/17/2020. REMOVED, REPLACED, AND INSTALLED NEW LT FS 280 CROSSBEAM, REF CRJ 700 SRM AND DWG. COMPLIED WITH SKYWEST TASKCARD.Sep 21, 2020 · N631SK · Cndair CL6002C10SDR SWIA202053434Floorbeam · corrodedCOCKPIT FLOOR SUPPORT HAS EVIDENCE OF CORROSION ATTACHED TO FWD OF FS 280.00 CROSSBEAM. C-CHECK RO 10/17/2020. REMOVED, REPLACED AND INSTALLED NEW COCKPIT FLOOR SUPPORT FWD OF FS 280 CROSSBEAM, REF CRJ 700 SRM AND DWG. COMPLIED WITH SKYWEST TASKCARD.Sep 21, 2020 · N631SK · Cndair CL6002C10SDR JR2R20200921260Floorbeam · corrodedFLOOR BEAM AT FRAME 17 STRINGER 28L CORRODED OUT OF LIMITS. REPAIRED FLOOR BEAM, IAW EMB 175 SRM 53-10-10 REPAIR 01 ON AAR W/O 1018802 2000-0070 S/N 7898260.Sep 21, 2020 · N86309 · Emb ERJ170200LRSDR SWAA2020102321869Floorbeam · crackedCRACK INTERCOSTAL WEB FLOOR STRUCTURE BS 540 AND BETWEEN LBL 24 TO RBL 24 AT PASSENGER CABIN (2 EA). REPLACED INTERCOSTAL WEB LOCATED ON FLOOR STRUCTURE BS 540 AND BETWEEN LBL 24 TO RBL 24 AT PASSENGER CABIN 2 (E/A), IAW B737-700 SRM 51-40-02 AND DWG 143A0060Sep 19, 2020 · N431WN · Boeing 7377H4SDR SWAA2020100817236Floorbeam · corrodedCORROSION BETWEEN STA 947 FLOOR BEAM AND INTERCOSTAL AT LBL 51. REPAIRED, PER EA 20-153-01821. SEE INDIVIDUAL SIGNOFFS ON SAM 326 947 FLOOR BEAM P/N 17A5504-7SEE SA-M 326 A1200769.Sep 19, 2020 · N8327A · Boeing 7378H4SDR SWAA2021052616711Floorbeam · corroded***CORROSION*** ON AFT CARGO BAY FLOOR PANEL SUPPORT AT B.S. 727D+4; L.B.L. 21 - R.B.L. 21; W.L. 154. / RECEIVED NEW SERVICEABLE SUPPORT ON SWA P.O.# 803241/1 NEW SUPPORT WILL BE INSTALLED ON SWA CARD# JPANEL-141-CLOSESep 17, 2020 · N496WN · Boeing 7377H4SDR SWAA2021052616708Floorbeam · corroded***CORROSION*** ON AFT CARGO BAY FLOOR PANEL SUPPORT AT B.S. 772; L.B.L 21 - R.B.L. 21; W.L. 154. / RECEIVED NEW SERVICEABLE SUPPORT ON SWA P.O.# 801448/1 NEW SUPPORT WILL BE INSTALLED ON SWA CARD# JPANEL-141-CLOSESep 17, 2020 · N496WN · Boeing 7377H4SDR SWAA2021052616702Floorbeam · corroded***CORROSION*** ON AFT CARGO BAY FLOOR PANEL SUPPORT AT B.S. 887; L.B.L. 21 - R.B.L. 21; W.L. 154. / REMOVED ACB FLOOR PANEL SUPPORT AT BS 887 RBL21-LBL21 WL 154 IAW SRM 51-40-02-0G-0 LOCATED AND DRILLED NEW SUPPORT IAW SRM 51-40-05-0G-0 COUNTERSUNK IAW SRM 51Sep 17, 2020 · N496WN · Boeing 7377H4SDR SWIA202053905Floorbeam · corrodedFLOOR BEAM ANGLE SUPPORT BRACKET CORRODED AT FS 310 AND AT APPROXIMATELY STRG 17L. C-CHECK RO 11/11/2020. FLOOR BEAM ANGLE WAS REPAIRED, IAW REO AND CRJ 200 SRM TO INCLUDE BLENDING. NDT AND FINISH COATS APPLIED, AS DOCUMENTED ON ATTACHED CONTINUATION CARD. Sep 17, 2020 · N926EV · Cndair CL6002B19SDR ABXA20200803192Floorbeam · corrodedDURING MAINTENANCE VISIT, CORROSION DAMAGE WAS NOTED TO THE LOWER AFT SURFACE OF THE STA 1417 FLOOR BEAM UPPER (368-53-16-94201-101) T-CAP FLANGE, AT LBL 6, THAT FALLS OUTSIDE OF THE LIMITS OF IAI SRM SUPPLEMENT 53-00-51. THE CORROSION DAMAGE IS LOCATED IN THSep 17, 2020 · N744AX · Boeing 767232SDR SWIA202053575Floorbeam · corrodedFLOOR SUPPORT AT FS 621.0 FROM LT SILL TO RT SILL HAS CORROSION. C-CHECK RO 10/20/2020. COMPLIED WITH REO INSTALLED 7 EA NEW NUTPLATES, IAW CRJ200 SRM. RESTORED FINISH, IAW CRJ200 SRM.Sep 16, 2020 · N919EV · Cndair CL6002B19SDR SWIA202053558Floorbeam · corrodedFLOOR SUPPORT CAP AT FS 589.0 LBL 9 TO LBL 27 HAS CORROSION. C-CHECK RO 10/20/2020. REMOVED CORROSION ON FLOOR SUPPORT CAP AT FS 589.00 LBL 9 TO LBL 27, REF CRJ200 SRM. EVALUATED AND FOUND TO BE OUT OF LIMITS. REMOVED AND REPLACED THE FLOOR SUPPORT CAP ATSep 16, 2020 · N919EV · Cndair CL6002B19SDR SWAA2020100616692Floorbeam · crackedFLOOR SUPPORT CRACKED BS 540 BL 0-RBL 25 WL 208. REPLACED CRACKED FLOOR SUPPORT AT BS 540 BL 0-RBL 25 WL 208, PER SRM 51-40-02-0G-0; DWG 143A0060. 57449U 17SEP20Sep 16, 2020 · N496WN · Boeing 7377H4SDR SWAA2020100616691Floorbeam · crackedFLOOR SUPPORT CRACKED AT BS 540 BL0-LBL 25 WL 208. REPLACED CRACKED FLOOR SUPPORT AT BS 540 BL 0-LBL 25 WL 208, PER SRM 51-40-02-0G-0; DWG 143A0060. 57449U 17SEP20.Sep 16, 2020 · N496WN · Boeing 7377H4SDR SWAA2020100616405Floorbeam · corrodedCORROSION AFT CHORD BS 259 FLOOR BEAM LBL 9-RBL 8 WL 207. REPAIRED CHORD AT BS 259 LBL 9-RBL 8 WL 207, IAW ER 20-03288 REV IR AND ER 20-153-01899 REV IR.Sep 16, 2020 · N496WN · Boeing 7377H4SDR SWAA2021072116184Floorbeam · corrodedFWD PIT STA 500I LBL20 TO RBL24 LATERAL FLOOR SUPPORT UPR SURFACE CORRODED AT WL157 / REMOVED AND REPLACED BULKHEAD SUPPORT RAIL AT STA 500I IN FWD CARGO COMPARTMENT IAW SRM 51-40-02-0G-0 AND BOEING DWG# 143A7902 REV B WN4269Sep 15, 2020 · N8652B · Boeing 7378H4SDR SWIA202053549Floorbeam · crackedFLOOR BEAM ATTACHING ANGLE AT FS 280.00, LEFT OF RBL 9 POSSIBLE CRACK ON UPPER CORNER. C-CHECK RO 10/20/2020. CLIP ANGLE CRACKED, AT FS 280.00, LEFT OF RBL 9 REMOVED AND NEW CLIP ANGLE INSTALLED P/N 601R31113-58, REF CRJ-200 SRM AND DWG.Sep 15, 2020 · N919EV · Cndair CL6002B19SDR SWIA202053547Floorbeam · corrodedPRESS FLOOR 9R SUPPORT BEAM HAS CORROSION IN MULTIPLE AREAS, AS MARKED. C-CHECK RO 10/20/2020. REMOVED MULTIPLE AREAS OF CORROSION FROM FLOOR BEAM FLANGE AT RBL 9 ABOVE PRESSURE FLOOR, IAW CRJ-200 SRM. EVALUATED AND FOUND TO BE OUT OF LIMITS OF REO. SUBMITSep 15, 2020 · N919EV · Cndair CL6002B19SDR SWIA202053510Floorbeam · corrodedFS 559.0+80 CROSS BEAM RBL 9 TO RBL 27 IS CORRODED. C-CHECK RO 10/18/2020. REMOVED AND REPLACED FLOOR SUPPORT PLATE AT FS 559.0+80 ON TOP OF CROSS BEAM RBL 9 TO RBL 27, IAW CRJ 200 SRM.Sep 15, 2020 · N922EV · Cndair CL6002B19SDR SWIA202053389Floorbeam · crackedDURING RELACEMENT OF FS 280 RT CROSSBEAM FOUND CENTER COCKPIT FLOORBEAM AT RBL 12.00 FOUND TO BE CRACKED. C-CHECK RO 10/16/2020. REMOVED AND REPLACED CENTER COCKPIT FLOORBEAM AT RBL 12.00, REF CRJ700 SRM AND COMPLIED WITH TASK CARD.Sep 15, 2020 · N754SK · Cndair CL6002C10SDR SCNA20201007096Floorbeam · corrodedFLOOR BEAM CORRODED BS 328 RBL 39 TO RBL 58. CORROSION ON FS 328 FLOOR BEAM RBL 39-58 UPPER CHORD FOUND TO OUT OF LIMITS, DUE TO EXISTING REPAIR. REMOVED AND REPLACED UPPER CHORD OF FS 328 FLOOR BEAM, IAW SRM 53-10-51 REF EA 15794.Sep 15, 2020 · N801SY · Boeing 7378Q8SDR REXA2020092800669Floorbeam · corrodedDOUBLER ON TOP OF FLOOR BEAM CAP AT FS 319 AT RBL 5 IS CORRODED. REMOVED AND INSTALLED NEW FABBED DOUBLER PLATE, IAW CRJ 200 SRM 51-42-13.Sep 15, 2020 · N800AY · Cndair CL6002B19SDR SWAA2021052616324Floorbeam · crackedFLOOR PANEL SUPPORT IS CRACKED AT B.S. 540; B.L. 0 - R.B.L. 24.5; W.L. 208.1. / REMOVED AND REPLACED FLOOR PANEL SUPPORT AT BS 540 BL 0 TO RBL 24.5 WL 208.1 P/N 7530909 PO# 800435 IAW SRM 51-40-02-0G-0 REF DWG 143A0060 89004U 17SEP20Sep 14, 2020 · N499WN · Boeing 7377H4SDR SWAA2021052615927Floorbeam · corroded***CORROSION*** ON AFT CARGO BAY FLOOR PANEL SPLICE PLATE SUPPORT AT B.S 772; L.B.L. 21 - R.B.L 21; W.L. 154. / REMOVED AND REPLACED ON ACB PANEL SPLICE PLATE SUPPORT AT BS 772 LBL 21 - RBL 21 ITEM 3530573 PO # 784685 IAW SRM 51-40-02 AND DWG 146A7500 80641U 2Sep 14, 2020 · N499WN · Boeing 7377H4SDR SWIA202053484Floorbeam · crackedINBOARD AND OUTBORD ANGLES ATTACHING THE LBL 9 FLOOR BEAM AT FS 280 CROSSBEAM ARE CRACKED IN UPPER RADIUS. C-CHECK RO 10/18/2020. REMOVED AND REPLACED CRACKED CLIPS 2 EA AT STA 280 LBL 9, IAW CRJ200 SRM.Sep 14, 2020 · N922EV · Cndair CL6002B19SDR SWIA202053475Floorbeam · corrodedSERVICE DOOR FLOOR BEAM ANGLE CORRODED AT STGR 18 AND AT FS 349. C-CHECK RO 10/18/2020. REPAIRED SERVICE DOOR FLOOR BEAM ANGLE AT STGR 18 AT FS 349, IAW REO. SEE ATTACHED STRUCTURAL MAJOR REPAIR TASK CARD AND CONTINUE CARD FOR DETAILS OF WORK PERFORMED. NOSep 11, 2020 · N922EV · Cndair CL6002B19SDR SCNA20201007084Floorbeam · damagedFOUND TOOLING DAMAGE ON SURFACE OF UPPER CHORD AT STA 312 LBL 10 TO LBL 53 WL 208. TOOLING DAMAGE FOUND ON SURFACE OF UPPER CHORD STA 312 FLOOR BEAM LBL 12 1" L X .7" W X .011" D LBL 16.5 1" L X .7" W X .013" D BOTH FOUND TO BE OUT OF LIMITS, IAW SRM 53-10-51Sep 11, 2020 · N801SY · Boeing 7378Q8SDR ASAA2020091133235Floorbeam · corrodedFLIGHT DECK FLOOR PANEL 211AF LANDING IS CORRODED ALL THE WAY AROUND. GROUNDED-YES. REMOVED CORROSION ON STA 270 FLOOR PANEL 211AF LANDING AND FOUND HOLE OUT OF LIMITS, IAW 737-900 SRM 53-10-51-A. REPAIRED STA 270 LATERAL INTERCOSTAL, IAW ALASKA AIRLINES EASep 11, 2020 · N323AS · Boeing 737990SDR DALA2020091413055Floorbeam · corrodedCORROSION LEVEL 2, DURING INSPECTION FOUND CORROSION ON FLOOR STRINGER S-RBL 16.10, 7.55 AND 2.90 STA 650 AT FWD CARGO COMPARTMENT. REPAIRED PER ERA.Sep 11, 2020 · N586NW · Boeing 757351SDR DALA2020091103032Floorbeam · corrodedCORROSION LEVEL 2, DURING INSPECTION FOUND CORROSION ON FLOOR STRINGER S-LBL 16.10, 10.45, 7.55, 2.90 STA 650 AT FWD CARGO COMPARTMENT. STRINGER REPAIRED PER SRM.Sep 11, 2020 · N586NW · Boeing 757351SDR SCNA20201007077Floorbeam · corrodedFLOOR STRUCTURE AT BS 947 + 3" RBL 18 TO RBL 46 HAS CORROSION ON UPPER AND LOWER SURFACES OF TOP AROUND HOLES. REMOVED AND REPLACED FLOOR STRUCTURE AT BS 947+3 RBL 18 TO RBL 46 WITH NEW FLOOR STRUCTURE ITEM NR 147A5676U6 PO 801297, IAW SRM 51-40-02 AND DWG 14Sep 10, 2020 · N801SY · Boeing 7378Q8SDR SWIA202052778Floorbeam · corrodedCORROSION, AFT WET AREA LT FLOOR BEAM HAS CORROSION, AS MARKED AT FR 87. C-CHECK RO 9/24/2020. REMOVED DAMAGED AFT WET AREA LT FLOOR BEAM. LOCATED, DRILLED, AND INSTALLED NEW AFT WET AREA LT FLOOR BEAM, REF EMB SRM 51-40-08. APPLIED FINISH, REF EMB SRM & CSep 10, 2020 · N151SY · Emb ERJ170200LRSDR SWIA202052776Floorbeam · corrodedCORROSION, AFT WET AREA RT FLOOR BEAM CORRODED AROUND FASTENER, AS MARKED AT FR 87. C-CHECK RO 9/24/2020. REMOVED AND REPLACED AFT WET AREA RT FLOOR BEAM FR 86-89 WITH NEW PART FROM FACTORY. NO SIGNIFICANT CHANGE TO WEIGHT AND BALANCE. APPLIED FINISH, REF Sep 10, 2020 · N151SY · Emb ERJ170200LRSDR AALA202009239020Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: FOUND CORRODED AREA ON FLOOR BEAM AT FR 19 AND Y1292 MEASURING L=1.32 IN W=1.01 IN D=0.198 IN. REPLACED FLOOR BEAM, IAW A321 SRM 51-42-11-801 AND DWG D53110984, D53111014.Sep 10, 2020 · N507AY · Airbus A321231SDR SWIA202053372Floorbeam · corrodedRT CROSSBEAM AT FS 280.00 IS CORRODED. C-CHECK RO 10/16/2020. REPLACED RT CROSSBEAM AT FS 280, REF CRJ-700 SRM. COMPLIED WITH TASK CARD.Sep 9, 2020 · N754SK · Cndair CL6002C10SDR SWIA202053371Floorbeam · corrodedLT CROSSBEAM AT FS 280 IS CORRODED. C-CHECK RO 10/16/2020. REMOVED AND REPLACED LT CROSSBEAM AT FS 280.00, REF CRJ-700 SRM DWG. COMPLIED WITH SKYWESTTASK CARD.Sep 9, 2020 · N754SK · Cndair CL6002C10SDR AALA202009219023Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: FOUND CRACK IN EXPANSION JOINT FLOORBOARD SUPPORT AT STA 540. REMOVED AND REPLACED FLOORBOARD SUPPORT, PER SRM 51-10-02.Sep 9, 2020 · N808NN · Boeing 737823SDR IPXA2020092460589Floorbeam · crackedLOWER FWD. CARGO FLOOR BEAM IS CRACKED AT STA. 6-70 ABOVE LONG. 43R.REPAIRED CRACKED FLOOR BEAM AT STA. 6-70 ABOVE LONG. 43R ISW SRM 53-40-51 REPAIR 1 FIG. 202. (MAJOR)Sep 8, 2020 · N250UP · Doug MD11FSDR SWIA202053618Floorbeam · corrodedCORROSION ON LT SIDE FLOOR SUPPORT BEAM LBL 9-LBL 27, AT FS 549.00. C-CHECK RO 10/22/2020. REPAIRED LT SIDE FLOOR SUPPORT BEAM LBL 9-LBL 27 ST FS 549, REF REO ALL STEPS COMPLETED OF PERMANENT REPAIR, COMPLIED WITH. SEE CONTINUE CARD FOR DETAILS.Sep 4, 2020 · N753EV · Cndair CL6002C10SDR SWIA202053617Floorbeam · corrodedCORROSION ON FLOOR BEAM AT FS 333.00, BETWEEN RBL 9-RBL 36. C-CHECK RO 10/22/2020. REPAIRED FS 333.00 FLOOR CROSS BEAM BETWEEN RBL 9-RBL 36, REFERENCING REO. ALL STEPS COMPLIED WITH. COMPLIED WITH SKYWEST TASK CARD. COMPLETED SKYWEST FORM M-337.Sep 4, 2020 · N753EV · Cndair CL6002C10SDR SWIA202053358Floorbeam · corrodedFS 280.00 BEAM FLOOR SUPPORT BETWEEN BL 9L & BL 9R IS CORRODED. C-CHECK RO 10/16/2020. REMOVED AND REPLACED COCKPIT FLOOR SUPPORT AT FS 280.00 BETWEEN LBL 9-RBL 9, REF CRJ-700 SRM AND DWG. COMPLIED WITH SKYWEST TASK CARD.Sep 4, 2020 · N754SK · Cndair CL6002C10SDR SWIA202053292Floorbeam · corrodedCABIN FLOOR SUPPORT STRAP UPPER SURFACE HAS MINOR CORROSION FS 559+80 RBL 9.0 TO LBL 9.0. C-CHECK RO 10/13/2020. CABIN FLOOR SUPPORT STRAP UPPER SURFACE CORROSION AT FS 559+80 RBL 9.0 TO LBL 9.0. REMOVED AND PAINTED. REFERENCE CONTINUATION CARD FOR THE WORSep 3, 2020 · N221PS · Cndair CL6002B19SDR SWIA202053290Floorbeam · corrodedCABIN FLOOR SUPPORT STRAP UPPER SURFACE CORRODED AROUND NUTPLATE HOLES LBL 9.0 TO LBL 27.0 FS 589.00. C-CHECK RO 10/13/2020. REMOVED AND REPLACED CABIN FLOOR SUPPORT STRAP AT FS 589.00 LBL 9.0 TO LBL 27.0, IAW CRJ-200 SRMS. APPLIED FINISH IAW SRM.Sep 3, 2020 · N221PS · Cndair CL6002B19SDR SWIA202053289Floorbeam · corrodedFLOOR SUPPORT STRAP FS 589.00 RBL 27.0 TO RBL 42.0 CORRODED ON UPPER SURFACE. C-CHECK RO 10/13/2020. REMOVED AND REPLACED FLOOR SUPPORT STRAP AT FS 589 RBL 27 TO 42, IAW SRM CRJ 200.Sep 3, 2020 · N221PS · Cndair CL6002B19SDR DALA2020090842974Floorbeam · crackedDURING INSPECTION FOUND CRACK ON FLOOR SUPPORT STATION 540 RBL 2 AND LBL 2 AT PASSENGER COMPARTMENT. REPAIR WAS PERFORMED ON PANEL BRAKE SUPPORT STATION 540 PER ERA 587606-14 REV. A SECTION I AND ETI-37-20-318 REV 1.Sep 3, 2020 · N775DE · Boeing 7378EHSDR SWIA202053397Floorbeam · corrodedFS 280.00 BEAM SUPPORT DOUBLER ACROSS THE TOP OF THE UPPER FLANGE BETWEEN BL 9L & BL 9R IS CORRODED, MARKED. C-CHECK RO 10/16/2020. REMOVED AND REPLACED NEW STRIP UPPER FLANGE P/N CC670-34094-1 BETWEEN BL 9L-BL9R, REF CRJ700 SRM.Sep 2, 2020 · N754SK · Cndair CL6002C10SDR SCNA20201007061Floorbeam · damagedTOOLING MARKS ON FLOOR BEAM BS 294.5, LBL 11 TO RBL 41. BLENDED ON UPPER SURFACE OF FLOOR BEAM 294.5 AT RBL 24.5 AREA 1.75" L X .7" W X .015" D. FOUND TO BE OUT OF LIMITS, IAW SRM 53-10-51-1A-1 DET C. ALL OTHER BLEND AREAS .012" OR LESS WITHIN LIMITS, IAW SSep 2, 2020 · N801SY · Boeing 7378Q8SDR AALA2020090439020Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: FOUND CRACK IN FLOORBOARD SUPPORT ABOVE THE CENTER WINGBOX. REMOVED AND REPLACED FLOOR BOARD SUPPORT, IAW SRM 51-10-02.Sep 2, 2020 · N958NN · Boeing 737823
Back to JASC 5315