JASC 5315

Service difficulty reports · 44,218

Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5315'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR SWIA2020021148359Angle · crackedFS 280 RBL 9.0 OUTBOARD CLIP HAS A CRACK AT UPPER RADIUS (C-CHECK) RO 2/07/2020 REMOVED AND REPLACED NEWLY FABRICATED O/B CLIP AT FS280 RBL 9.0. REF PREVIOUSLY INCORPERATED REO.Jan 9, 2020 · N442SW · Cndair CL6002B19SDR SWIA2020021148358Strap · corroded*FLOOR STRAP AT FS 559 LBL 27-42 CORRODED (C-CHECK) RO 2/07/2020 REMOVED AND REPLACED THE FLOOR STRAP AT FS559.00 LBL 27.00 -42.00. REF CRJ200 SRM, BOMBARDIER DRAWING.Jan 9, 2020 · N442SW · Cndair CL6002B19SDR SWIA2020021148357Strap · corroded*FLOOR STRAP AT FS 559 RBL 27-42 CORRODED (C-CHECK) RO 2/07/2020 REMOVED AND INSTALLED NEW SERVICEABLE FLOOR STRAP AT FS559.00 RBL 27-42. REF - CRJ 200 SRM AND BOMBARDIER DWG. CHECKS GOOD.Jan 9, 2020 · N442SW · Cndair CL6002B19SDR FDEA202001090081Floorbeam · crackedMAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE - CROSSBEAM CRACKED, AT FR64, BETWEEN Y1456 AND Y1959 REPAIRED THE CRACKED CROSSBEAM OF MAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE AT FR64 BETWEEN Y1456 AND Y1959 PER A300-600F SRM53-10-15 FIG211. MAJOR REPAIRJan 9, 2020 · N686FE · Airbus A300F4605RSDR FDEA202001090080Floorbeam · crackedMAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE - CROSSBEAM CRACKED, AT FR57.3, BETWEEN Y1456 AND Y1959 REPAIRED THE CRACKED CROSSBEAM OF MAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE AT FR57.3 BETWEEN Y1456 AND Y1959 PER A300-600F SRM53-10-15 FIG211. MAJOR REJan 9, 2020 · N686FE · Airbus A300F4605RSDR FDEA202001090079Floorbeam · crackedMAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE - CROSSBEAM CRACKED, AT FR31, BETWEEN -Y450 AND -Y953 REPAIRED THE CRACKED CROSSBEAM OF MAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE AT FR31 BETWEEN -Y450 AND -Y953 PER A300-600F SRM53-10-15 FIG212 AND EA: 6-531Jan 9, 2020 · N686FE · Airbus A300F4605RSDR FDEA202001090078Floorbeam · crackedMAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE - CROSSBEAM CRACKED, AT FR30, BETWEEN -Y450 AND -Y953 REPAIRED THE CRACKED CROSSBEAM OF MAIN DECK CARGO COMPARTMENT FLOOR STRUCTURE AT FR30 BETWEEN -Y450 AND -Y953 PER A300-600F SRM53-10-15 FIG212 AND EA: 6-531Jan 9, 2020 · N686FE · Airbus A300F4605RSDR REXA2020012890112Floorbeam · corroded"AWR; [ TASK R53520 STEP 7 ]; INITIAL INSPECTION: CORROSION ON PROTECTION PLATE SUPPORTS ANGLE IN STA. FS= 322 BETWEEN 41RBL TO 44RBL AT GALLEY SERVICE DOOR LOWER SILL, FWD WET AREA. (W1) (CPAX) "SUMMARY. CORROSION LEVEL 2. PROTECTION PLATE SJan 9, 2020 · N296PQ · Cndair CL6002D24SDR SWIA2020021848667Floorbeam · corroded* CORROSION DETECTED ON FLOOR BEAM (RBL9) AFT BAG BAY, JUST AFT OF F.S. 1031.00 (MARKED). (C-CHECK) RO:2/14/2020REPAIRED CORROSION ON FLOOR BEAM RBL 9 JUST AFT OF FS 1031.00 AS PER CRJ 700 SRM / COMPLIED WITH M-337 / COMPLIED WITH SKYWEST TASK CARD (CLJan 8, 2020 · N782SK · Cndair CL6002C10SDR FDEA2020012780225Floorbeam · corrodedLOWER CTR CARGO PIT AT DOOR ENTRY STA. 1750 CEILING FLOOR BEAM HAS CORROSION ON LOWER LEG OF I-BEAM REMOVED & REPLACED CEILING FLOOR I-BEAM LOWER LEG AFA7509-5, REF. DAC DWG 7509 & MD10 SRM 51-31-01, VOL 2, PG 23Jan 8, 2020 · N315FE · Doug MD1030FSDR SWIA2020020648260Floorbeam · crackedSUPPORT BEAN ANGLE BRACKET CRACKED AT RBL 27-33 AT FS 495.0 I/B OF RBL 33 O/B IF RBL 27 (C-CHECK) RO 2/04/2020 REMOVED OVERWING FAIRING FOR ACCESS TO FASTENERS, REMOVED CRACKED SUPPORT BEAM ANGLE BRACKETS, FABRICATED NEW FLOOR SUPPORT BEAM ANGLE BRACKETS, Jan 8, 2020 · N943SW · Cndair CL6002B19SDR SWIA2020020648259Floorbeam · crackedSUPPORT BEAM ANGLE BRACKET IS CRACKED AT LBL 37-33 AT FS 495.0 I/B OF LBL 33 AND O/B OF LBL 27 (C-CHECK) RO 2/04/2020 REMOVED OVERWIND ACCESS PANELS, REMOVED ANGLE BRACKETS, FABRICATED NEW ANGLE BRACKETS TREATED PRIMED PAINTED AFTER PERFORMING HFEC INSPECTJan 8, 2020 · N943SW · Cndair CL6002B19SDR SWIA2020020648241Floorbeam · cracked280 BEAM LBL 9 CRACKED CLIP AT UPPER ANGLE (C-CHECK) RO 2/04/2020 REMOVED AND REPLACED FS280, LBL9 CLIP REF CRJ200 SRM. AND USED BOMBARDIER REO FOR MATERIAL ID AND FASTENER CALL OUT ONLY. SEE CONTINUE CARD FOR DETAILS. SEE ATTACHED TASK.Jan 8, 2020 · N466SW · Cndair CL6002B19SDR KCSA202001081005Support Web · crackedCRACK IN MAIN DECK FLOOR BEAM / SUPPORT WEB STA 1180 RBL 112Jan 8, 2020 · N710CK · Boeing 7474B5FSDR C77A2020010800002Floorbeam · corrodedTHIS EO IS BEING ISSUED TO PROVIDE INSTRUCTIONS TO ACCOMPLISH THE ON-CONDITION REPAIR OF CORROSION OR OTHER DAMAGE TO THE CENTER FUSELAGE III AFT CABIN LH FLOOR BEAM P/N 170-65669-003. THE PERMANENT REPAIR WILL BE ACCOMPLISHED BY DIRECT REPLACEMENT OF THE AFFEJan 8, 2020 · N205NN · Emb ERJ170200LRSDR SWIA2020020748314Floorbeam · corrodedFS 280 L/H CROSS BEAM HAS CORROSION (C-CHECK) RO 2/05/2020 FS 280.0 LH CROSS BEAM WAS EXFOLIATED AT 100%, PART IS "OUT OF ALLOWABLE LIMITS", REPLACED WITH NEW LH CROSS BEAM REF CRJ-700 SRM. SEE CONTINUATION CARD FOR DETAILS. COMPLIED WITH TASK.Jan 7, 2020 · N727SK · Cndair CL6002C10SDR SWIA2020020748313Floorbeam · corrodedFS 280 R/H CROSS BEAM HAS CORROSION (C-CHECK) RO 2/05/2020 FS 280.0 RH CROSS BEAM WAS EXFOLIATED AT 100%, PART IS "OUT OF ALLOWABLE LIMITS", REPLACED WITH NEW RH CROSS BEAM REF CRJ-700 SRM AND DWG. COMPLIED WITH TASK.Jan 7, 2020 · N727SK · Cndair CL6002C10SDR SWAA2020010940313Floorbeam · crackedFLOOR SUPPORT CRACKED AT BS. 540, BETWEEN BL 0 TO RBL 24.5. / R&R FLOOR SUPPORT IAW SRM & DWG.Jan 7, 2020 · N459WN · Boeing 7377H4SDR SWAA2020010940312Floorbeam · crackedFLOOR SUPPORT CRACKED AT BS. 540, BETWEEN BL 0 TO LBL 24.5. / R&R FLOOR SUPPORT IAW SRM AND DWG.Jan 7, 2020 · N459WN · Boeing 7377H4SDR SWAA2020010626065Floorbeam · corroded***CORROSION*** ON FLOOR BEAM UPPER SURFACE AT B.S. 986.5; R.B.L. 30 - 45; W.L. 208.1. / COMPLIED WITH EA 1-A53-8241; REV.3; DATE: 1/23/2019.Jan 6, 2020 · N7873A · Boeing 7377Q8SDR SWIA2020020648276Floorbeam · crackedCRACK FOUND ON 280 BEAM AT FS 280 LBL 13 WL 69.5 (C-CHECK) RO 2/04/2020 REMOVED CRACKED AREA IAW BOMBARDIER REO. CRACK WAS FOUND TO BE WITHIN HORIZONTAL FLANGE ONLY ON LOWER SECTION OF 280 BEAM. PREFORMED REPAIR SCHEME "A" IAW BOMBARDIER REO. RESTORED AIRJan 6, 2020 · N943SW · Cndair CL6002B19SDR IPXA2020020551848Floorbeam · crackedINSPECTION TYPE:3CLOWER FWD. CARGO FLOOR BEAM IS CRACKED AT STA. 6-73 AND X=-57.5.REPAIRED CRACKED LOWER FWD. CARGO FLOOR BEAM AT STA. 6-73 AND X=-57.5 IAW VT-SAA EA 011-53140-01-A7985 REV. I/R AND UPS EO MD11-5340-75221-A. (MAJOR)Jan 6, 2020 · N275UP · Doug MD11FSDR SIMA202001216009Floorbeam · crackedRH CENTER COCKPIT FLOOR BEAM AT BL 12.00 IS CRACKED, LOCATED JUST FWD OF CROSSBEAM AT FS280.00. -C/A-C/W RH COCKPIT FLOOR BEAM REPAIR AT BL-12.00 IAW SRM 53-41-43.Jan 6, 2020 · N541EA · Cndair CL6002C10SDR SIMA202001216008Floorbeam · crackedLH CENTER COCKPIT FLOOR BEAM AT BL 12.00 IS CRACKED, LOCATED JUST FWD OF CROSSBEAM AT FS280.00. -C/A-C/W LH COCKPIT FLOOR BEAM REPAIR AT BL-12.00 IAW SRM 53-41-43.Jan 6, 2020 · N541EA · Cndair CL6002C10SDR C77A2020010600014Floorbeam · corrodedDURING THE B2 BASIC CHECK AT EAMS, CORROSION WAS FOUND ON THE AFT WET AREA RH FLOOR BEAM (P/N 170-65669-004) AT FR87. THE CORROSION DAMAGE CAN BE REPAIRED BY SRM PART II 53-23-10 REPAIR 02 BY REMOVING THE DAMAGE AND INSTALLING A REPAIR DOUBLER. BECAUSE THE FLOJan 6, 2020 · N205NN · Emb ERJ170200LRSDR C77A2020010600002Floorbeam · corrodedTHIS EO IS BEING ISSUED TO PROVIDE INSTRUCTIONS TO ACCOMPLISH THE PERMANENT REPAIR OF CORROSION DAMAGE BY REPLACEMENT OF THE FOLLOWING FORWARD CABIN FLOOR STRUCTURE: P/N 170-13939-001, FR17 FLOOR SUPPORT. REPLACEMENT OF PARTS IS ACCOMPLISHED IN ACCORDANCE WITHJan 6, 2020 · N205NN · Emb ERJ170200LRSDR SWAA2020020541026Floorbeam · corrodedFLOOR BEAM HAD SURFACE CORROSION ON BOTH SIDES OF THE RIGHT HAND AFT LAV OUTBOARD FLOOR MOUNT AT BS. 947.5, BETWEEN LBL 59 TO RBL 59. / REPAIRED FLOOR BEAM IAW SRM AND EA.Jan 5, 2020 · N8312C · Boeing 7378H4SDR SWAA2020012940865Floorbeam · corrodedFLOORBEAM AT BS 947.5 SURFACE CORRODED ON BOTH SIDES OF THE RT AFT LAV, INBOARD FLOOR MOUNT RBL 25 INCHES. REPAIRED FLOOR BEAM PER NRC D427363.Jan 5, 2020 · N8312C · Boeing 7378H4SDR SWIA2020021448447Floorbeam · corrodedFLOOR LANDING STRIP HAS CORROSION AND BARE METAL SPOTS AT FS 621 BETWEEN RCL 27 AND THE RH FLOOR SILL, IN THE CARGO BAY. (C-CHECK) RO 2/10/2020 CORROSION FOUND TO BE OUT OF LIMITS IAW CRJ-200 SRM. REMOVED AND REPLACED REPAIR PARTS IAW BOMBARDIER GREO.Jan 3, 2020 · N978SW · Cndair CL6002B19SDR SWIA2020021448446Floorbeam · corrodedFLOOR PANEL LANDING STRIP AT FS 621 HAS CORROSION AND BARE METAL SPOTS BETWEEN LBL 27 AND THE LH FLOOR SILL, IN THE CARGO BAY. (C-CHECK) RO 2/10/2020 REMOVED AND REPLACED CRACKED ANGLE IAW REO.Jan 3, 2020 · N978SW · Cndair CL6002B19SDR SWAA2020010740182Floorbeam · corrodedAFT CARGO FLOOR BEAM JOGGLED AREA CORRODED AT BS. 767+5, RBL 3.0 AT NUTPLATE HOLE. / REPAIRED FLOOR BEAM PER SRM.Jan 3, 2020 · N466WN · Boeing 7377H4SDR SWAA2020010740179Floorbeam · corrodedAFT CARGO FLOOR BEAM JOGGLED AREA CORRODED AT BS. 767+5, RBL 8.1 AT NUTPLATE HOLE. / REPAIRED FLOOR BEAM PER SRM.Jan 3, 2020 · N466WN · Boeing 7377H4SDR SWIA2020020748335Floorbeam · corroded* THE FLOOR ANGLE SUPPORT BELOW FLOOR AT FS 280.00 BETWEEN STRG 25R AND 25L HAS CORROSION IN MULTIPLE LOCATIONS. (MARKED) (C-CHECK) RO 2/05/2020 BLENDED OUT CORROSION ON SUPPORT ANGLE, ORIGINAL PART THICKNESS = .050",MATERIAL REMOVED .012",MATERIAL REMAINIJan 2, 2020 · N727SK · Cndair CL6002C10SDR SWIA2020020748308Floorbeam · damaged* FORWARD CARGO BAY FLOOR BEAM AND CAP PLATE HAS A HOLE IN THE EDGE AT APPROXIMATLY FS581, LBL 11, MARKED. (C-CHECK) RO 2/05/2020 REPLACED CAP PLATE AT FS581, LBL11 REF CRJ-700 SRM, DWG. REMOVED UNDERLYING DAMAGE AND FOUND REWORKED AREA TO BE WITHIN LIMITJan 2, 2020 · N727SK · Cndair CL6002C10SDR SWIA2020020748306Floorbeam · corrodedFLOOR SUPPORT ANGLE AT APROX. FS280, WL 72.00 HAS CORROSION ALONG ITS ENTIRE WIDTH. (C-CHECK) RO 2/05/2020 BLENDED OUT CORROSION ON COCKPIT FLOOR SUPPORT ANGLE, ORIGINAL PART THICKNESS = .063", MATERIAL REMOVED = .021", REMAINING PART THICKNESS = .042", ALJan 2, 2020 · N727SK · Cndair CL6002C10SDR AALA202001159034Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT CABIN WET AREA FLOORBEAM AT BS 986.5 AND LBL 43. REPAIRED FLOORBEAM PER EA 301768 AND SRM 53-00-51-2R-1.Jan 2, 2020 · N980AN · Boeing 737823SDR AALA202001159037Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT CABIN WET AREA FLOORBEAM AT BS 986 AND RBL 43. REPAIRED FLOORBEAM PER EA 301768 AND SRM 53-00-51-2R-1.Jan 2, 2020 · N980AN · Boeing 737823SDR DALA2020010300038Floorbeam · corrodedCORROSION LEVEL: 2. CORROSION FLOOR BEAM +Y765 AT LEVEL OF FR16 AT FWD GALLEY AREA (1 EA). REPLACED FLOOR BEAM +Y765 LOC FR12 TO FR24 AT FWD GALLEY AREA AS PER A319 SRM 51-72-11 AND DRAWING D53110984, D53112812 AND D53110920. MEASURE OF CORROSION ARE L=0.651",Jan 2, 2020 · N357NB · Airbus A319114SDR DALA2020010300037Floorbeam · corrodedCORROSION LEVEL: 2. CORROSION FLOOR BEAM +Y1292 BTW FR12 TO FR24 AT FWD GALLEY AREA (1 E A). REPLACED FLOOR BEAM +Y1292 LOC. FR.12 TO FR.24 AT FWD GALLEY AREA AS PER A319 SRM 51-72-11 AND DRAWING D53110989, D53112812 AND DRAWING D53110920. MEASURE OF CORROSIONJan 2, 2020 · N357NB · Airbus A319114SDR C77A2019123100011Floor Support · corrodedTHIS EO IS BEING ISSUED TO PROVIDE INSTRUCTIONS TO ACCOMPLISH THE PERMANENT REPAIRS OF CORROSION DAMAGE BY REPLACEMENT OF THE FOLLOWING AFT CABIN FLOOR STRUCTURE: P/N 170-92907-001 LH PANEL SUPPORT, P/N 170-65927-007 LH SHEAR PANEL, P/N 170-60259-001 FR90 RH GDec 31, 2019 · N621CZ · Emb ERJ170200LRSDR C77A2019123100001Floorbeam · corrodedTHIS EO IS BEING ISSUED TO PROVIDE INSTRUCTIONS TO ACCOMPLISH THE ON-CONDITION REPAIR OF CORROSION OR OTHER DAMAGE TO THE CENTER FUSELAGE III AFT CABIN LH FLOOR BEAM P/N 170-65669-003. THE PERMANENT REPAIR WILL BE ACCOMPLISHED BY DIRECT REPLACEMENT OF THE AFDec 31, 2019 · N205NN · Emb ERJ170200LRSDR AALA2020010839016Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FORWARD CABIN WET AREA FLOOR BEAM AT FR 20 AND Y254. REPLACED FLOOR BEAM PER SRM 51-42-11.Dec 30, 2019 · N832AW · Airbus A319132SDR SWAA2022041235386Track · corrodedAFT PIT FLOOR BEAM STA 807 TO 847 RBL 13.8 WL 156 HAS CORROSION ON TOP SURFACE / REMOVED CORROSION ON AFT CARGO FLOOR TRACK AT STA 807 TO 847; RBL 13.8; ORIGINAL THICKNESS .070' LOSS OF .043' REMAINING .027' FOUND OUT OF LIMITS IAW SRM 53-00-53-1A-2. REPAIRED Dec 28, 2019 · N8313F · Boeing 7378H4SDR SWIA2020021448477Strap · corrodedFLOOR STRAP AT FS 559 HAS CORROSION BETWEEN RBL 27 THRU THE RH FLOOR SILL, IN THE CABIN. (C-CHECK) RO 2/10/2020 REMOVED AND INSTALLED FABRICATED STRAP IAW CRJ-200 SRM.Dec 28, 2019 · N978SW · Cndair CL6002B19SDR SWIA2020021448462Floorbeam · crackedANGLE CLIP IS CRACKED ON THE AFT OF BEAM 280 AND O/B SIDE OF RBL 9, IN THE CABIN BELOW THE FLOOR. (C-CHECK) RO 2/10/2020 REMOVED AND REPLACED CRACKED CLIP IAW CRJ-200 SRM.Dec 28, 2019 · N978SW · Cndair CL6002B19SDR SWIA2020021448461Floorbeam · crackedANGLE CLIP IS CRACKED ON THE AFT SIDE OF BEAM 280 AND I/B SIDE OF RBL 9, IN THE CABIN BELOW THE FLOOR. (C-CHECK) RO 2/10/2020 REMOVED AND REPLACED CRACKED CLIP IAW CRJ-200 SRM.Dec 28, 2019 · N978SW · Cndair CL6002B19SDR SWIA2020021448460Floorbeam · crackedANGLE CLIP IS CRACKED ON THE AFT SIDE OF BEAM 280 AND O/B SIDE OF LBL 9, IN THE CABIN BELOW THE FLOOR (C-CHECK) RO 2/10/2020 REMOVED AND REPLACED CRACKED CLIP IAW CRJ-200 SRM.Dec 28, 2019 · N978SW · Cndair CL6002B19SDR SWIA2020021448459Floorbeam · crackedBEAM 280 PREVIOUS REPAIR IS CRACKED AND HAS A BROKEN-OFF RIVIT HEAD ALONG THE UPPER AFT SIDE JUST O/B OF RBL 9, IN THE CABIN BELOW THE FLOOR. (C-CHECK) RO 2/10/2020 REMOVED AND REPLACED CRACKED REPAIR ANGLE IAW BOMBARDIER GREO.Dec 28, 2019 · N978SW · Cndair CL6002B19SDR SWIA2020021448451Floorbeam · crackedFLOOR ANGLE STRIP ON THE FWD SIDE OF BEAM 280 IS CRACKED JUST I/B OF LBL 12, IN THE VERY FWD E&E BAY. (C-CHECK) RO 2/10/2020 REMOVED AND REPLACED CRACKED ANGLE IAW CRJ-200 SRM.Dec 28, 2019 · N978SW · Cndair CL6002B19SDR SWIA2020011647801Floorbeam · corrodedCORROSION - AFT WET AREA ON RH FLOOR BEAM JUST IN FRONT OF FRAME 90 GUSSET PLATE, Y = 10.748". (C-CHECK) RO 1/15/2020 REMOVED AND REPLACED RH FLOOR BEAM JUST IN FRONT OF FRAME 90 GUSSET PLATE, Y = 10.748" REF SRM.Dec 28, 2019 · N136SY · Emb ERJ170200LR
Back to JASC 5315