JASC 5315

Service difficulty reports · 44,223

Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5315'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR C2XA03SH352Floorbeam · corroded-DURING C CHECK THE LT FLOORBEAM WAS FOUND TO BE CORRODED. MAINTENANCE REMOVED THE AFFECTED AREA AND PERFORMED A DOUBLER REPAIR IAW EMB 145 SRM 53-21-10. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.Sep 24, 2003 · N13538 · Emb EMB145LRSDR C2XA03SH349Floorbeam · corrodedDURING C CHECK MAINTENANCE FOUND THE RT FLOORBEAM DOUBLER TO BE CORRODED. MAINTENANCE REMOVED AND REPLACED AFFECTED PART IAW WITH EMB 145 SRM 51-40-02. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.Sep 24, 2003 · N13538 · Emb EMB145LRSDR C2XA03SH348Floorbeam · corrodedSHV-DURING C CHECK MAINTENANCE FOUND THE FLOORBEAM AT FR 20 TO BE CORRODED. MAINTENANCE REMOVED AFFECTED PART AND REPLACED IT WITH A NEW CROSS BEAM IAW EMB 145 SRM 51-40-02. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.Sep 24, 2003 · N13538 · Emb EMB145LRSDR UPS03841430Floorbeam · corrodedINSPECTION TYPE: C3, AFT ACCY COMPT FS 1580 FLOORBEAM REPAIR ANGLE IS CORRODED AT RBL 48. REMOVED FLOORBEAM REPAIR, FOUND TO BE OUT OF LIMITS IAW DC8 SRM 53-2-0. FABRICATED NEW REPAIR ANGLE, ALODINED AND PRIMED IAW DC8 SRM 53-2-0 AND 51-1-8 AND INSTALLED ANSep 23, 2003 · N813UP · Doug DC873FSDR 03FDEA01610Floorbeam · corrodedCORROSION 3) BS 990 FLOORBEAM RBL 23 WL 200.Sep 23, 2003 · N469FE · Boeing 727200SDR C2XA03TY167Floorbeam · corrodedDURING A SCHEDULED 2C INSPECTION THE LT FLOORBEAM WAS FOUND CORRODED. MAINT. CUT OUT THE AFFECTED AREA AND FAB. A NEW FLOORBEAM, INSTALL A DOUBLER FILLER AND SHIMS. ALLODINED,PRIMED AND PAINTED IAW EMB 135/145 SRM 53-21-10 AND EMB 145 CPM 51-21-04,05.06. ALL Sep 23, 2003 · N13995 · Emb EMB145LRSDR UPS03841429Floorbeam · corrodedINSPECTION TYPE: C3, FLOORBEAM REPAIR ANGLE CORRODED FS 1680 LBL 20. REMOVED CORRODED REPAIR ANGLE IAW DC8 SRM 51-3-0. FABBED REPAIR ANGLE AND STRAP IAW DC8 53-2-0 & 53-2-04. ALODINED AND PRIMED IAW DC8 SRM 51-1-8. INSTALLED REPAIR ANGLE, STEEL STRAP, SUPSep 22, 2003 · N813UP · Doug DC873FSDR SWIA200312431Floorbeam · crackedFS 280 RT FLOORBEAM RBL 9.0 IB AND OB ATTACH ANGLES CRACKED. (DISCOVERED DURING C-CHECK INSPECTION) INBOARD AND OUTBOARD ANGLES AT FS 280 RT RBL 9.0 FLOORBEAM REPLACED IAW CRJ SRM 51-40-11. P/N: 601R31113-58Sep 22, 2003 · N903SW · Cndair CL6002B19SDR SWIA200312430Floorbeam · crackedFS 280 LT FLOORBEAM LBL 9.0 IB AND OB ATTACH ANGLES CRACKED. (DISCOVERED DURING C-CHECK INSPECTION) INBOARD AND OUTBOARD ANGLES AT FS 280 LBL 9 FLOORBEAM REPLACED IAW CRJ SRM 51-40-11. P/N: 601R31113-57Sep 22, 2003 · N903SW · Cndair CL6002B19SDR C2XA03TY166Floorbeam · corrodedDURING A SCHEDULED 2C INSPECTION THE LT FLOORBEAM WAS FOUND CORRODED. MAINT. REMOVED AND FAB. A NEW FLOORBEAM. CLEANED SURFACE CORROSION,PRIMED,PAINTED AND INSTALL THA NEW FAB. PART IAW EMB 135/145 SRM 51-10-03 AND CPM 51-21-03,05,06. ALL WORK WAS ACCOMPLISHEDSep 22, 2003 · N19503 · Emb EMB135ERSDR LR7A03078Fitting · crackedDURING SCHEDULED B2 INSPECTION IAW JOB CARD HB5302 FOUND RT FS 477 FLOORBEAM END FITTING CRACKED AT RBL 60, WL 146. REPLACED FITTING IAW DWG 356245-19 AND SRM SMP 583 51-70. NR 0027.Sep 22, 2003 · N403LC · Lkheed 382GSDR C2XA03SH340Floorbeam · corrodedSHV-DURING C CHECK THE LEFT FLOORBEAM BETWEEN FRAMES 20 AND 23 WAS FOUND TO BE CORRODED. MAINTENANCE REMOVED THE DAMAGED AREA AND PERFORMED A DOUBLER REPAIR IAW EMB 145 SRM 53-21-10. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.Sep 21, 2003 · N14991 · Emb EMB145LRSDR C2XA03SH339Floorbeam · corrodedDURING C CHECK THE LT FLOORBEAM BETWEEN FRAMES 23 AND 25 WAS FOUND TO BE CORRODED. MAINTENANCE REMOVED THE DAMAGED AREA AND PERFORMED A DOUBLER REPAIR IAW EMB 145 SRM 53-21-10 FIGURE 202 SHEET 1. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.Sep 21, 2003 · N14991 · Emb EMB145LRSDR AMTA200301248Floorbeam · corrodedMAIN CABIN FLOORBEAM UPPER CHORD CORRODED. REPAIRED FLOORBEAM IAW ER033585.(K)Sep 20, 2003 · N519AT · Boeing 75723NSDR SIMA200326802Floorbeam · corrodedABI - DURING AN MBV INSPECTION, THE CENTER FLOORBEAM BETWEEN FRAMES 24 AND 25 AS FOUND TO BE CORRODED BELOW SRM LIMITS. CUT OUT DAMAGE SECTION OF THE CETNER FLOORBEAM, CLEANED, AND TREATED THE REPAIR AREA. FABRICATED A EXTERNAL ANGLE, FILLER AND TWO SHIMS. Sep 20, 2003 · N821AE · Emb EMB135KLSDR SIMA200326803Floorbeam · corrodedDURING AN MBV INSPECTION, THE LEFT OMEGA BEAM AT FRAME 20 WAS FOUND TO BE CORRODED BELOW SRM LIMITS. CUTOUT DAMAGE SECTION OF LEFT BEAM, CLEANED AND TREATED THE REPAIR AREA. FABRICATED A EXTERNAL ANGLE, FILLER AND TWO SHIMS. PERFORMED REPAIR IAW EMB SRM, SRSep 20, 2003 · N921AE · Bag JETSTM3201SDR SIMA200326804Floorbeam · corrodedABI - DURING A MBV INSPECTION, THE LEFT OMEGA BEAM BETWEEN FRAMES 24 AND 25 WAS FOUND TO BE CORRODED BELOW SRM LIMTIS. CUT OUT DAMAGE SECTION OF BEAM, CLEANED AND TREATED THE REPAIR AREA. FABRICATED AN EXTERNAL ANGLE, FILLER AND TWO SHIMS. REPAIR DONE IAW EMSep 20, 2003 · N821AE · Emb EMB135KLSDR SWAA032096Floorbeam · crackedDURING SCHEDULED 1/4D CHECK, FOUND CENTER FLOORBEAM CRACKED AT BS 663.75, BL 0. REPAIRED FLOORBEAM PER SWA EA.Sep 19, 2003 · N678AA · Boeing 7373A4SDR 03FDEA01591Floorbeam · corrodedCORROSION ON FLOOR BEAM B/S 312, LBL 42.Sep 19, 2003 · N469FE · Boeing 727200SDR SWAA032089Floorbeam · corrodedDURING SCHEDULED 1/4D CHECK, FOUND AFT CARGO COMPT FLOORBEAMS CORRODED AT BS 727, AND BS 727D. REPAIRED BEAMS PER SWA EA.Sep 18, 2003 · N626SW · Boeing 7373H4SDR SWAA032087Floorbeam · corrodedDURING SCHEDULED D CHECK, FOUND AFT CABIN FLOORBEAMS CORRODED AT BS 986, AND BS 1016. REPAIRED FLOORBEAMS PER BFG ER.Sep 18, 2003 · N301SW · Boeing 7373H4SDR 03FDEA01559Floorbeam · corrodedCORROSION ON LOWER STRUCTURE BS 1010 FLOORBEAM, LBL 43-LBL 2. BLENDED CORROSION DAMAGE ON LOWER STRUCTURE BS 1010 FLOORBEAM LBL 43-LBL 2 PER SRM 51-10-1. DAMAGE AT BS 1010, LBL 4-LBL 14, WL 200 WAS FOUND TO BE OUT OF LIMITS PER SRM 53-10-1 AND 53-10-6.Sep 18, 2003 · N469FE · Boeing 727200SDR 03FDEA01573Floorbeam · gougedCORROSION C53-224-01 AND GOUGED METAL AT FASTENER HOLE LOCATIONS ON FLOORBEAM AT BS 950F, LBL 42-RBL 38. REPAIRED FLOORBEAM IAW SRM 53-10-8 FIG 8.Sep 18, 2003 · N468FE · Boeing 727200SDR 03FDEA01579Floorbeam · damagedLWR SURFACE, FWD SIDE OF TOP FLANGE OF FLOOR BEAM BS 440, LBL 35, WL 208 HAS TOOLING DAMAGE. REPAIRED FLOORBEAM IAW SRM 53-10-8 FIG 8.Sep 18, 2003 · N468FE · Boeing 727200SDR 03FDEA01567Floorbeam · corrodedCORROSION ON FLOORBEAM AT BS 1050, LBL 35, WL 208. **SD** COMINGSep 18, 2003 · N468FE · Boeing 727200SDR 03FDEA01572Floorbeam · corrodedCORROSION ON FLOORBEAM AT BS 1070, RBL 10.5, WL 208. **SD** COMINGSep 18, 2003 · N468FE · Boeing 727200SDR 03FDEA01577Floorbeam · corrodedCORROSION ON FLOOR BEAM UPR SURFACE BS 328, LBL 29, WL 208. **SD** COMINGSep 18, 2003 · N468FE · Boeing 727200SDR 2004F00120Floorbeam · corrodedAT C-CHECK, FOUND CORROSION AT R2 DOOR FLOORBEAM 8 INCHES INBOARD OF DOOR CUT OUT FROM FRAMES 66 TO 68 RBL 50. REPAIRED CORRODED AREA AT R2 DOOR FLOORBEAM, 8 INCHES INBOARD OF DOOR CUTOUT FROM FRAMES 66 TO 68, RBL 50. (M)Sep 17, 2003 · N951LF · Airbus A320233SDR TSAA0253249Floorbeam · crackedREMOVED EXISTING FASTENERS, STIFFENERS, ANGLE AND A SECTION OF THE WEB. REMOVED AND DISCARDED REINFORCING ANGLE, DOUBLER AND A SECTION OF THE WEB. DRILL AND COLD WORKED THE HOLES IN THE CHORD. INSTALLED SPLICE ANGLE AND STIFFENERS WITH FASTENERS SHOWN IN SESep 17, 2003 · N824AL · Boeing 737282SDR 2004F00124Floorbeam · corrodedAT C-CHECK, FOUND CORROSION ON FLOORBEAM AT FRAME 20 AT RBL 12. REMOVED AND REPLACED FLOORBEAM AND SPLICE AT FRAME 20, RBL 12. (M)Sep 16, 2003 · N951LF · Airbus A320233SDR SIMA200326507Floorbeam · corrodedDURING AN MBV INSPECTION, THE CENTER FLOORBEAM FLANGE WAS FOUND TO BE CORRODED BEYOND SRM LIMITS BETWEEN FRAMES 24 AND 25. COMPLETELY REMOVED CORROSION BY BLENDING. FABRICATED A REINFORCEMENT PLATE FOR REPAIR. REPAIR DONE IAW EMB REPAIR STATEMENT IC2003-145Sep 16, 2003 · N610AE · Emb EMB145SDR SWAA032070Floorbeam · crackedDURING SCHEDULED D CHECK, FOUND LONGITUDINAL FLOORBEAM CRACKED AT BS 727B, WL 208 AND LBL 46. REPAIRED FLOORBEAM PER BFG ER.Sep 16, 2003 · N301SW · Boeing 7373H4SDR C2XA03SH329Floorbeam · corrodedDURING C CHECK THE LEFT HAND FLOORBEAM AT FRAME 20 WAS FOUND TO BE CORRODED. MAINTENANCE REMOVED THE DAMAGED AREA AND PERFORMED A DOUBLER REPAIR IAW EMB 145 SRM 53-21-10 FIGURE 201 SHEET 2. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.Sep 14, 2003 · N13992 · Emb EMB145LRSDR AWXA200301106Floorbeam · corrodedMCN - MAJOR REPAIR - DURING C-07 CHECK CORROSION WAS FOUND ON Y1292 FLOORBEAM FR 66-68. MAINTENANCE REMOVED CORROSION AND FOUND MATERIAL LOSS TO BE OUT OF LIMITS. REMOVED Y1292 FLOORBEAM FROM FR 66-68; FABRICATED A NEW REPLACEMENT BEAM; INSTALLED REPAIR PARTSep 13, 2003 · N619AW · Airbus A320232SDR AWXA200301103Floorbeam · corrodedDURING C-07 CHECK CORROSION WAS FOUND ON Y1292 FLOORBEAM FR 68-69. MAINTENANCE REMOVED CORROSION AND FOUND MATERIAL LOSS TO BE OUT OF LIMITS; REMOVED Y1292 FLOORBEAM FROM FR 68 TO FR 69; RECEIVED NEW REPLACEMENT FLOORBEAM; INSTALLED REPAIR PARTS IAW A320 SRM Sep 13, 2003 · N619AW · Airbus A320232SDR AWXA200301102Floorbeam · corrodedDURING C-07 CHECK CORROSION WAS FOUND ON MAIN CABIN FLOORBEAM Y1732 BETWEEN FR 65 AND FR 66. MAINTENANCE REMOVED CORROSION AND FOUND MATERIAL LOSS TO BE OUT OF LIMITS; REMOVED MAIN CABIN FLOORBEAM Y1732 BETWEEN FR 65 AND FR 66; RECEIVED A NEW REPLACEMENT FLOOSep 13, 2003 · N619AW · Airbus A320232SDR AWXA200301100Floorbeam · corrodedMCN - MAJOR REPAIR - DURING C-07 CHECK CORROSION WAS FOUND ON MAIN CABIN FLOORBEAM Y765 BETWEEN FR 67 AND FR 68. MAINTENANCE REMOVED CORROSION AND FOUND MATERIAL LOSS TO BE OUT OF LIMITS; REMOVED MAIN CABIN FLOORBEAM Y765 BETWEEN FR 67 AND FR 68; RECEIVED A NESep 13, 2003 · N619AW · Airbus A320232SDR AWXA200301097Floorbeam · corrodedMCN - MAJOR REPAIR - DURING C-07 CHECK CORROSION WAS FOUND ON Y765 FLOORBEAM FR 67-69. MAINTENANCE REMOVED CORROSION AND FOUND MATERIAL LOSS TO BE OUT OF LIMITS; REMOVED Y765 FLOOR BEAM FROM FR 67 TO FR 69; FABRICATED A NEW REPLACEMENT FLOORBEAM; INSTALLED REPSep 13, 2003 · N619AW · Airbus A320232SDR AWXA200301096Floorbeam · corrodedDURING C-07 CHECK CORROSION WAS FOUND ON Y1292 FLOORBEAM AFT SIDE OF FR 66. MAINTENANCE REMOVED CORROSION AND FOUND MATERIAL LOSS TO BE OUT OF LIMITS; REMOVED Y1292 FLOORBEAM FROM FR 64 TO FR 67; FABRICATED A NEW REPLACEMENT BEAM; INSTALLED REPAIR PARTS IAW A3Sep 13, 2003 · N619AW · Airbus A320232SDR C2XA03SH328Floorbeam · corrodedDURING C CHECK THE CENTER FLOORBEAM BETWEEN FRAMES 18 AND 22 WAS FOUND TO BE CORRODED. MAINTENANCE REMOVED AND REPLACED THE AFFECTED BEAM IAW EMB 145 SRM 51-40-02. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.Sep 13, 2003 · N13992 · Emb EMB145LRSDR C2XA03SH322Floorbeam · corrodedDURING C CHECK THE RAMP ANGLE ON THE LEFT HAND FLOORBEAM AT FRAME 20 WAS FOUND TO BE CORRODED. MAINTENANCE REMOVED AND REPLACED THE AFFECTED ANGLE IAW EMB 145 SRM 51-40-02. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.Sep 13, 2003 · N13992 · Emb EMB145LRSDR SIMA200326505Floorbeam · corrodedABI - DURING AN IMBV INSPECTION, THE TOP OF THE CENTER OMEGA BEAM WAS FOUND TO BE CORRODED BELOW SRM LIMITS AT FRAME 20 REMOVED CORROSION BY CREATING A CUT OUT IN THE OTP OF THE CENTER OMEGA BEAM AT FRAME 20. FABRICATED A U-SHAPED EXTERNAL DOUBLER. REPAIR DOSep 12, 2003 · N720AE · Emb EMB135LRSDR 03FDEA01522Floorbeam · corrodedCORROSION ON FLOORBEAM BS 328 LBL 18 TO LBL 30 WL 208.Sep 12, 2003 · N221FE · Boeing 727200SDR 03FDEA01521Floorbeam · corrodedCORROSION ON STRAP LOWER SURFACE OF UPPER FLANGE OF BS 950 FLOORBEAM RBL 45 WL 208.Sep 12, 2003 · N221FE · Boeing 727200SDR F3LA200300131Floorbeam · corrodedDURING C-4 CHECK, INSPECTION REPORTED SURFACE CORROSION ON FLOORBEAM CAP STRIP FROM LT TO RT SIDE OF AIRCRAFT AT STA. 986.5. REMOVED DAMAGED SECTION OF FLOOR SUPPORT BEAM AND REPAIRED IAW SRM 53-00-51, FIG. 202.Sep 12, 2003 · N315FL · Boeing 73736ESDR SWIA200312398Floorbeam · crackedFS 280 RT FLOORBEAM RBL 9.0 I/B ATTACH ANGLE CRACKED. DISCOVERED DURING C-CHECK INSPECTION. ANGLE REPLACED IAW CRJ SRM 51-40-11.Sep 11, 2003 · N915SW · Cndair CL6002B19SDR 03FDEA01499Floorbeam · corrodedCORROSION ON FLOORBEAM BS 1030 RBL 25-0 WL 208 INSTALLED REPAIR PARTS PER/ UPPER CHORD PER SRM 53-10-8Sep 11, 2003 · N221FE · Boeing 727200SDR 03FDEA01504Floorbeam · corrodedCORROSION ON FLOORBEAM LOWER CHORD UNDER NUTCLIP. REPAIRED IAW SRM 53-10-8.Sep 11, 2003 · N221FE · Boeing 727200SDR 03FDEA01503Floorbeam · corrodedCORROSION ON FLOORBEAM UPPER FLANGE UPPER & LOWER SURFACE AT NUTCLIP HOLES STA 950D LBL 10 & 21 WL 208. CUT OUT FLOORBEAM & REPAIRED PER SRM 53-10-8.Sep 11, 2003 · N221FE · Boeing 727200SDR 03FDEA01505Floorbeam · damagedSTA 950F LBL 97 TO 54 WL 208 FLOORBEAM HAS DAMAGE ON UPPER FLANGE. TOOLING MARKS FOUND TO BE OUT OF LIMITS. REPAIRED FLOORBEAM PER SRM 51-30-5, 53- 10-1, & FED EX EA 7-5310-54997, BS 950F, LBL 35 - 65, WL 208.Sep 11, 2003 · N221FE · Boeing 727200
Back to JASC 5315