JASC 5315
Service difficulty reports · 44,223
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR CALA0300489Floorbeam · corrodedINSPECTION FOUND FLOORBEAM UPPER CHORD CORRODED AT STA 294.5, RBL 41. THE FLOORBEAM UPPER CHORD SECTION WAS REMOVED AND A NEW UPPER CHORD WAS INSTALLED IAW SRM 53-10-51.SDR C2XA03SH288Floorbeam · corrodedSHV DURING C CHECK THE LEFT HAND OMEGA BEAM WAS FOUND TO HAVE CORROSION AT FRAME 20. MAINTENANCE REMOVED DAMAGE AND REPAIRED AFFECTED OMEGA BEAM IAW EMB 145 SRM 53-21-01. THE AIRCRAFT WAS APPROVED TO RETURN TO SERVICE.SDR USAA030174Floorbeam · corrodedFOUND BEAM CORRODED .5 INCH BY 4 INCHES, FLOORBEAM 986.5 RBL 15 AND RBL 29. UPPER FLANGE REPAIR PER TYPICAL REP 53-60-01 REV A. CORROSION LEVEL 1, TASK NR C53-107-02. (M)SDR CALA0300479Floorbeam · corrodedINSPECTION FOUND FLOORBEAM CORRODED AT STA 312, RBL 21. THE FLOORBEAM WAS REPAIRED IAW SRM 53-00-51, FIGURE 203.SDR SIMA200324611Floorbeam · corrodedABI - FOUND DURING AN IMBV INSPECTION, THE CENTER OMEGA BEAM BETWEEN FRAMES 24 AND 25 WAS FOUND CORRODED BELOW SRM LIMITS. BLENDED THE CORRODED AREA AND PERFORMED NDT INSPECTION. FABRICATED A REPAIR DOUBLER. REPAIR DONE IAW EMB REPAIR STATEMENT IC2003-145/27SDR 2003UALA00646Floorbeam · crackedMAIN CABIN FLOORBEAM AT BS 927 AT RBL 45 IS CRACKED AFT SIDE UNDER T-CAP. MAJOR REPAIR ACCOMPLISHED, INSTALLED SUPPORT ANGLE AND STRAPS.SDR 03FDEA01351Floorbeam · corrodedCORROSION (C53-224-03(1/2) AT BS 344, LBL 40, WL 208, ON TOP OF FLOORBEAM. REMOVED CORROSION BS 344, WL 208, LBL 40. FOUND TO BE OUT OF LIMITS. REMOVED FLOORBEAM UPPER CHORD BS 344, BL 0 TO LBL 70 & INSTALLED REPAIR. ALL IAW SRM 53-10-1 & 53-10-8, FIG SDR C2XA03SH282Floorbeam · corrodedSHV-DURING C CHECK THE RIGHT HAND OMEGA BEAM BETWEEN FRAMES 58 AND 61 WAS FOUND TO BE CORRODED. MAINTENANCE REMOVED AND REPLACED THE AFFECTED BEAM IAW EMB 145 SRM 51-40-02. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.SDR C2XA03SH281Floorbeam · corrodedSHV-DURING C CHECK THE CENTER OMEGA BEAM BETWEEN FRAMES 58 AND 61 WAS FOUND TO BE CORRODED. MAINTENANCE REMOVED AND REPLACED THE AFFECTED BEAM IAW EMB 145 SRM 51-40-02. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.SDR C2XA03TY137Floorbeam · corrodedTYS DURING A SCHEDULED 2C INSPECTION THE RT LAV FLOORBEAM WAS CORRODED. MAINT R&R THE RT FLOORBEAM SEAL IAW EMB135/145 SRM 51-40-02. ALL WORK WAS ACCOMPLISHED AND WILL BE REL UPON COMPLETION OF ALL WORK.SDR SIMA200324609Floorbeam · corrodedABI - DURING AN MBV INSPECTION, THE LEFT OMEGA BEAM AT FRAME 20 WAS FOUND TO BE CORRODED BELOW SRM LIMITS. CUT OUT DAMAGE SECTION OF OMEGA BEAM, CLEANED AND TREATED THE REPAIR AREA. FABRICATED AN EXTERNAL ANGLE, FILLER, TWO SHIMS AND PLATE. REPAIR DONE IAW SDR SWAA031857Floorbeam · crackedDURING SCHEDULED D CHECK, FOUND LONGITUDINAL FLOORBEAM CRACKED AT BS 616,WL 206 AND RBL 66. REPAIRED FLOORBEAM PER SRM.SDR 03FDEA01333Floorbeam · crackedMAIN DECK FLOORBEAM AT FRAME 58, 24 INCHES RIGHT OF CENTER, IS CRACKED 3 INCHES DOWN FROM TOP APPROX 1 INCH LONG. REPAIRED IAW FEDEX EA 6-5310-72527.SDR C2XA03TY128Floorbeam · corrodedTYS DURING A SCHEDULED INSPECTION CORROSION WAS FOUND ON THE CENTER OMEGA BEAM UNDER THE GALLEY FLOOR. MAINTENANCE REMOVED THE CORRODED AREA AND ACCOMPLISHED A DOUBLER REPAIR IAW EMB SRM 51-40-02 AND 53-21-10, ALSO CPM 51-21-04,05,06. THE REPAIR WAS SATISFSDR SWIA200312329Floorbeam · crackedFS 280 RT FLOORBEAM RBL 9.0 INBD AND OB ATTACH ANGLES CRACKED. DISCOVERED DURING C-CHECK. ANGLES REPLACED IAW CRJ SRM 51-40-11. P/N: 601R31113-58SDR CX2A03SH276Floorbeam · corrodedSHV DURING C CHECK CENTER OMEGA BEAM WAS IDENTIFIED AS CORRODED AT FR 19-22. MAINTENANCE REMOVED AMD REPLACED OMEGA BEAM IAW EMB 145 SRM 51-40-02. AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.SDR C2XA03SH270Floorbeam · corrodedSHV DURING C CHECK LEFT OMEGA BEAM AT CARBON FIBER CROSSBEAM WAS FOUND TO HAVE CORROSION. MAINTENANCE REPAIRED AFFECTED AREA IAW EMB 145 SRM 53-21-10. THE AIRCRAFT WAS APPROVED TO RETURN TO SERVICE.SDR C2XA03SH271Floorbeam · corrodedSHV DURING C CHECK FOWARD DIGITAL WAS FOUND TO HAVE CORROSION DOWN THE CENTER LINE BETWEEN FRAMES 15 AND 18. MAINTENANCE REPAIRED AFFECTED DIGITAL IAW EMB 145 SRM 53-21-10. THE AIRCRAFT WAS APPROVED TO RETURN TO SERVICE.SDR ASOA03376Floorbeam · corrodedDURING A C-CHECK IN MCN, THE FLOORBEAMS AT LEFT ADN RIGHT 9 AND 27 BETWEEN FS 280 AND FS 409 PLUS 5 WERE FOUND TO BE CORRODED BEYOND LIMITS. MAINTENANCE IS REMOVING AND REPLACING THE FLOORBEAMS AT LEFT AND RIGHT 9 AND 27 BETWEEN FS 280 AND FS 409 PLUS 5 IAW ASDR SWAA031835Floorbeam · crackedDURING SCHEDULED 1/2D CHECK, FOUND FLOORBEAM CRACKED AT BS 714, BL 0. REPAIRED FLOORBEAM PER SWA EA.SDR 03FDEA01319Floorbeam · corrodedCORROSION (C53-224-02) ON FLOORBEAM AT BS 480, RBL 3 - RBL 10, WL 207.9 ON LOWER SIDE OF TOP FLANGE. CORROSION OUT OF LIMITS. REPLACED FLOORBEAM UPPER CHORD BS 480, LBL 38 - RBL 65, WL 207.9 IAW FED EX EA 7-5310-72538.SDR AWXA200301104Floorbeam · corrodedDURING C-07 CHECK CORROSION WAS FOUND ON Y1292 FLOORBEAM AFT OF FR 66. MAINTENANCE REMOVED CORROSION AND FOUND MATERIAL LOSS TO BE OUT OF LIMITS; REMOVED Y1292 FLOORBEAM AFT OF FR 66; FABRICATED A NEW REPLACEMENT BEAM; INSTALLED REPAIR PARTS IAW A320 SRM 51-49SDR UPS03841195Floorbeam · corrodedINSPECTION TYPE: C1, MAIN CABIN FS 1620 FLOORBEAM UPPER FLANGE IS CORRODED AT LBL 40. REMOVED CORROSION IAW DC8 SRM 51-1-8. MATERIAL REMAINING .034 ORIG MATERIAL .125 FOUND OUT OF LIMITS IAW DC8 SRM 53-2-0 FIG 1F. FABRICATED REPAIR ANGLE AND FILLER IAW DC8 SDR AWXA200301022Floorbeam · crackedDURING C-16 CHECK A .5 INCH CRACK WAS FOUND ON PASSENGER CABIN FLOORBEAM AT BS 520, LBL 24. MAINTENANCE STOP DRILLED CRACK ON FLOORBEAM AT BS 520, LBL 24 AND PERFORMED HFEC INSPECTION TO VERIFY CRACK IS CONTAINED; FABRICATED 2 EACH REPAIR ANGLES; INSTALLED RESDR SIMA200323004Floorbeam · corrodedDURING AN IMBV INSPECTION, THE CENTER FLOORBEAM BETWEEN FRAMES 24 AND 25 WAS FOUND CORRODED BELOW SRM LIMITS. PERFORMED A CUT OUT OF THE DAMAGED ARAE. FABRICATED A REPAIR DOUBLER, FILLER AND TWO SHIMS FOR REPAIR. REPAIR DONE IAW EMB 145 SRM, SRM EMB 145/114SDR SIMA200323005Floorbeam · corrodedDURING AN IMBV INSPECTION, THE LEFT FLOORBEAM AT FRAME 20 WAS FOUND TO BE CORRODED BELOW SRM LIMITS. PERFORMED A CUT OUT OF THE DAMAGED FLOORBEAM. FABRICATED A REPAIR ANGLE, FILLER, FORWARD SHIMS, AFT SHIMS AND PLATE. REPAIR DONE IAW EMB 145 SRM, SRM EMB 14SDR AWXA200301042Floorbeam · crackedDURING C-16 CHECK A .5625 INCH CRACK WAS FOUND ON FLOORBEAM REPAIR BS 677, RBL 24. MAINTENANCE REMOVED REPAIR ANGLE AND 2 EACH DOUBLERS; FABRICATED A NEW REPLACEMENT REPAIR CHANNEL AND 3 EACH DOUBLERS; INSTALLED REPAIR PARTS IAW AWA E.R. 15-5715-03240-ES2.SDR AWXA200301021Floorbeam · crackedDURING C-16 CHECK .875 INCH CRACK WAS FOUND ON PASSENGER CABIN FLOORBEAM AT BS 644, LBL 45. MAINTENANCE CUT OUT DAMAGE ON FLOORBEAM AT BS 694, LBL 45; FABRICATED A FILLER AND 3 EACH REPAIR PLATES; INSTALLED REPAIR PARTS IAW B737-200 SRM 51-40-04 FIG 1 PG 1.SDR AWXA200301020Floorbeam · crackedDURING C-16 CHECK 2 EACH 1.25 INCH CRACKS WERE FOUND ON PASSENGER CABIN FLOORBEAM AT BS 674, RBL 45. MAINTENANCE CUT OUT DAMAGE ON FLOORBEAM AT BS 674, RBL 45; FABRICATED A REPAIR EXTRUSION AND 3 EACH REPAIR PLATES; INSTALLED REPAIR PARTS IAW B737-200 SRM 51-SDR 03FDEA01254Floorbeam · chafedBS 740 FLOORBEAM UPR CHORD CHAFED ALONG AFT EDGE LBL 44 -RBL 44 WL 208 . BLENDED DAMAGE PER EA 7-5310-72307.SDR 03FDEA01255Floorbeam · corrodedCORROSION AFT CARGO BAY FLOORBEAM LOWER FLANGE HAS CORROSION AT FASTENER HOLES BS 1070 WL 200 2C LBL 40 TO RBL 53. BLENDED DAMAGE. COMPLIED WITH EA 7-5310-72306. REPAIRED 1070 FLOORBEAM AT BS 1070 WL 200, LBL 40 TO RBL 40.SDR 03FDEA01258Floorbeam · corrodedCORROSION ON LOWER FLANGE OF FLOORBEAM BS 720 LBL 46 TO RBL 46 WL 200. REMOVED CORROSION ON BS 720 FLOORBEAM LOWER CHORD LBL 46 TO RBL 46, WL 200. ALL AREAS WITHIN LIMITS EXCEPT AT LBL 5 AND THIS AREA WAS REPAIRED PER FED EX EA 7- 5310-72309.SDR 03FDEA01257Floorbeam · corrodedFASTENER HOLES ON FLOORBEAM LOWER SIDE OF FLANGE STA 560 LBL -25 WL 208 CORRODED. REMOVED CORROSION ON FLOORBEAM LOWER SIDE OF UPPER TEE BS 560, LBL 0-25, WL 208. REPAIRED IAW FED EX EA 7-5310-72311.SDR 03FDEA01261Floorbeam · corrodedCORROSION 28 C53-224-01 281 29 29 AT FASTENER HOLE 2C ON FLOORBEAM 2C LOWER SIDE OF FLANGE 2C STA 680 2C RBL 41 WL 208. REMOVED CORROSION BS 680, RBL 41 AND RBL 37 OUT OF LIMITS. REPAIRED FLOORBEAM IAW SRM 53-10-1 AND EA 7-5310-54933.SDR C1HA200381027Floorbeam · corrodedCORROSION ON FLOORBEAM BS 440 LBL 21 TO RBL 15.SDR UPS03841189Floorbeam · corrodedINSPECTION TYPE: C1, CORROSION ON FLOORBEAM UNDERSIDE AT STA 1680 LBL 43 REMOVED CORROSION IAW DC8 SRM 51-1-8. MATERIAL REMAINING 0.00 FROM .125 FOUND OUT OF LIMITS IAW DC8 SRM 53-2-0 FIG 1F. FABRICATED REPAIR ANGLE AND FILLER IAW DC8 SRM 53-2-0 FIG 1B ANSDR UPS03841188Floorbeam · corrodedINSPECTION TYPE: C1, CORROSION ON FLOORBEAM UNDER SIDE AT STA 1660 LBL 38.5 REMOVED CORR IAW DC8 SRM 51-1-8. MAT'L REMAINING 0.00 FROM .125 FOUN D OUT OF LIMITS IAW DC8 SRM 53-2-0 FIG 1F. FABRICATED REPAIR AN GLE AND FILLERS IAW DC8 SRM 53-2-0 FIG 1B & TR SDR SIMA200322506Floorbeam · corrodedABI - DURING AN MBV INSPECTION, THE LEFT OMEGA BEAM BETWEEN FRAMES 24 AND 25 WAS FOUND CORRODED BELOW SRM LIMITS. BLENDED THE DAMAGE AREA AND PERFORMED NDT INSPECTION. FABRICATED A REPAIR DOUBLER, FILLER, SHIMS AND REPAIR PLATE. REPAIR DONE IAW EMB REPAIR SSDR C1HA200381025Floorbeam · corrodedFLOOR T-ANGLE CORRODED BS 305 RBL 40.SDR SIMA200322505Floorbeam · corrodedABI - DURING AN MBV INSPECTION, THE LEFT OMEGA BEAM AT FRAME 20 WAS FOUND TO BE CORRODED BELOW SRM LIMITS. PERFORMED A CUTOUT OF THE CORRODED SECTION OF THE OMEGA BEAM. FABRICATED A REPAIR DOUBLER, FILLER TWO SHIMS AND A REPAIR PLATE. REPAIR DONE IAW EMB 14SDR CALA0300457Floorbeam · corrodedINSPECTION FOUND FLOORBEAM FLANGE AT NUTPLATE HOLE CORRODED, FS 947, LBL 5. A REPAIR STRAP WAS INSTALLED SRM 53-00-51, PAGE 213.SDR 2003UALA00614Floorbeam · dentedAFT CARGO COMPARTMENT FLOORBEAM STA. 1580 RBL 57 DENTED IN TWO PLACES. INSTALLED NEW WEB AND DOUBLER REPAIR.SDR CALA0300454Floorbeam · corrodedINSPECTION FOUND FLOORBEAM NUT PLATE HOLE CORRODED AT FS 967, LBL 28. A REPAIR STRAP WAS INSTALLED IAW SRM 51-21-3.SDR 03FDEA01225Floorbeam · corrodedAFT CARGO BAY FLOORBEAM LWR FLANGE HAS CORROSION AT FASTENER HOLES WL 200 LBL 40 RBL 53. R/R FLOORBEAM.SDR SIMA200322504Floorbeam · corrodedABI - DURING AN MBV INSPECTION, THE CENTER OMEGA BEAM BETWEEN FRAMES 24 AND 25 WAS FOUND CORRODED BELOW SRM LIMITS. CUT OUT SECTION OF DAMAGED OMEGA BEAM. FABRICATED A REPAIR ANGLE, FILLER, SHIMS, REPAIR DONE IAW EMB 145 SRM, SRM EMB 145/1142 REV 22, CHAPTERSDR CALA0300453Floorbeam · corrodedINSPECTION FOUND FLOORBEAM CORRODED AT BS 986.5 LT SIDE, AFT OF WATER TANK. A T-CAP WAS INSTALLED IAW ECRA 5310-03851.SDR CALA0300452Floorbeam · corrodedINSPECTION FOUND FLOORBEAM CORRODED AT BS 986.5, RT SIDE. A T-CAP WAS INSTALLED IAW ECRA 5310-03851.SDR 0301446624Floorbeam · crackedDURING "L" CHECK FOUND CRACKS IN THE FLOORBEAM WEB, UPPER SECTION AND FRAME WEB AT BS 340 LT. THERE WERE CRACKS IN THE FLOORBEAM UPPER SECTION AT BS 340 RT. ALSO CRACKS WERE FOUND IN THE FLOORBEAM WEB, UPPER SECTION AND THE FRAME WEB AT BS 360 RT. REPAIRED ISDR C1HA200381020Floorbeam · corrodedCORROSION ON FLOORBEAM AT FS 1110 BETWEEN LBL 45 AND RBL 55.SDR C1HA200381018Floorbeam · corrodedCORROSION ON FLOORBEAM FS 344 LBL 58 RBL 58.