JASC 5322

Service difficulty reports · 12,776

Reports filed under 5322 · Fuselage Internal Mounting Structure, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5322'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR YENA2021091700584Shear Tie · corrodedDURING HEAVY MAINTENANCE, (AFTER IFE RACK REMOVAL) CORROSION FOUND ON SHEARCLIP AT FR 84 BTW STGR 27R AND STGR 28R; (REF TECHOPS MEX WO# 1654 NR# 00506) SHEAR CLIP AT FR 84 BTW STGR 27R AND STGR 28R WAS REPLACED FOR NEW SHEAR CLIP (PN 170-6601-002) PER EMB-190Sep 8, 2021 · N238JB · Emb ERJ190100IGWSDR YENA2021091700583Shear Tie · corrodedDURING HEAVY MAINTENANCE, (AFTER IFE RACK REMOVED) CORROSION ON SHEARCLIP AT FR 83 BTW STGR 27R AND STGR 28R; (TECHOPS MX WO#1654 NR# 00505 PERFORMED) NEW SHARCLIP WAS INSTALLED AT FR 83 BTW STGR 27R AND STGR 28R PER EMB-190 SRM 51-41-01 PAR 6 FIG 2 SRM 51-41-Sep 8, 2021 · N238JB · Emb ERJ190100IGWSDR YENA2021091700582Shear Tie · corrodedDURING HEAVY MAINTENANCE, (AFTER IFE RACK REMOVED) CORROSION WAS FOUND ON SHEAR CLIP ON FR 84 BTW STGR 28R TO STGR 29R ON AFT CARGO COMPARTMENT; (TECHOPS MX WO#1654 NR# 00508 PERFORMED) NEW SHEARCLIP AT FR 84 BTW STGR 28R AND STGR 29R WAS REPLACED FOR NEW SHSep 8, 2021 · N238JB · Emb ERJ190100IGWSDR YENA2021091700581Shear Tie · corrodedDURING HEAVY MAINTENANCE, (AFTER IFE REMOVAL) CORROSION ON SHEAR CLIP AT FR 82 BTW STGR 27R AND STRG 28R; (TECHOPS MX WO#1654 NR 00504 PERFORMED) NEW SHEARCLIP WAS INSTALLED AT FR 82 BTW STGR 27R AND 28R PER EMB190 SRM 51-41-01 PAR 6 FIG 2 SRM 51-41-02 PAR 6 Sep 8, 2021 · N238JB · Emb ERJ190100IGWSDR YENA2021091700580Shear Tie · corrodedDURING HEAVY MAINTENANCE, CORROSION ON SHEARCLIP OF FR81 BTW STGR 27R AND STGR 28R BELOW AFT CARGO COMPARTMENT; (TECHOPS MX WO# 1654 NR# 00493 PERFORMED) NEW SHEARCLIP WAS INSTALLED AT FR 81 BTW STGR 27R AND STGR 28R PER EMB-190 SRM 51-41-01 PAR 6. FIGURE 2 ASep 8, 2021 · N238JB · Emb ERJ190100IGWSDR DALA2021090905314Shear Tie · corrodedSHEAR TIE AFT CARGO AT STA 974 HAS CORROSION. SUMMARY, SEE NRC 00351: TASK CARD NUMBER 001-0292:2550-2003/ 007 REPLACED SHEAR TIE AT STATION 974 REF BAC DWG 9958215. (LP #1941017)Sep 8, 2021 · N990AT · Boeing 717200SDR SWIA202161733None · damagedPERFORM REPAIR TO FLOOR BEAM FLANGE AT FS605.0-FS621.0, LBL27.0 (C-CHECK RO 10/8/2021) PERFORMED REPAIR TO FLOOR BEAM FLANGE AT FS605.0-FS621.0, LBL27.0. REF REO 601R-53-61-7713 REV. -- DATED 2021-09-12. COMPLIED WITH 51-900-1003-SKYSep 7, 2021 · N946SW · Cndair CL6002B19SDR SWIA202162580None · bentFLOOR BEAM WEB AT LBL 9 AND FS 559+96 TO 559+112 ON INBOARD SIDE OF BEAM WAS FOUND TO BE BENT ACROSS LIGHTNING HOLES AND REQUIRES REPLACEMENT. (C-CHECK- RO 11/11/21) INSTALLED NEW WEB PN 601R31119-66 AT LBL 9 AND FS. 559 +96 TO FS. 559 +112 ON INBOARD SIDSep 5, 2021 · N856AS · Cndair CL6002B19SDR DALA2021090705230Shear Tie · crackedSHIP 3250 CRACK INDICATION ON FRAME 43 LH FOOT COUPLING IN PASSENGER CABIN. CORRECTIVE ACTION: REPLACED FRAME PER DELTA WORKCARD 5311-01239-02A. (1936808)Sep 4, 2021 · N350NA · Airbus A320212SDR AALA202109097984Shear Tie · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION OF SHEAR TIE IN BULK CARGO COMPARTMENT AT STA 2017 BETWEEN STR 43L AND STR 44L, MEASURING L=0.417 IN, W=0.449 IN, D=0.023 IN. REPLACED SHEAR TIE WITH MODIFIED PART IAW DRAWING 147W2310 AND EA330236.Sep 3, 2021 · N792AN · Boeing 777223SDR SWIA202162578None · noneAFTER REMOVAL OF FLOOR BEAM FOUND WEB AT RBL 9 AND F.S 559+16 TO 559+32 ON THE INBOARD SIDE OF FLOOR BEAM TO BE CORRODED WITH A 100% MATERIAL LOSS PART FOUND TO BE UNSERVICABLE AND REQUIRES REPLACEMENT. (C-CHECK- RO 11/11/21) REMOVED AND REPLACED FLOOR BEASep 2, 2021 · N856AS · Cndair CL6002B19SDR DALA2021090305222Shear Tie · corrodedTHE SHEAR TIE AFT CARGO AT STA 946 HAS CORROSION. SUMMARY SEE NRC 001-0292:2550-2003/005 00349: REPLACED SHEAR TIE PER B717 SMR 51-40-08. (LP #1934168)Sep 2, 2021 · N990AT · Boeing 717200SDR SWIA202162617Intercostal · corrodedR/H FLOOR SILL IS CORRODED BETWEEN F.S. 559.0 TO F.S.559.0+16 (C-CHECK- RO 11/11/21) REMOVED AND REPLACED RH FLOOR SILL FROM FS 559- FS 559+16 IAW CRJ 200 SRM 51-42-06 AND 51-42-21Aug 31, 2021 · N856AS · Cndair CL6002B19SDR SWIA202162575None · corrodedRBL 9 FLOOR BEAM BETWEEN FS 559 AND FS 559+64 CORRODED OUT OF LIMITS, FROM CAMP 23329338 JOB97404121 OP#293 (C-CHECK- RO 11/11/21) REMOVED AND REPLACED RBL9 FLOOR BEAM AT F/S 559 TO 559+64 IAW CRJ 200 SRM 51-42-06, 51-42-36 AND REO 601R-53-51-599 REV -- DAAug 30, 2021 · N856AS · Cndair CL6002B19SDR SWIA202162574None · corrodedLBL 9 FLOOR BEAM BETWEEN FS 559+9 AND 559+112 CORRODED OUT OF LIMITS, SEE CAMP #23328805 (C-CHECK- RO 11/11/21) REMOVE AND INSTALLED FLOOR BEAM CAP AT LBL 9 FROM FS. 559+9 TO 559+112 IAW MHIRJ REO 601R-53-51-599 REV; -- DATED: 2021-42-36, CRJ 200 SRM 51-42Aug 30, 2021 · N856AS · Cndair CL6002B19SDR IPXA2021090973746Shear Tie · corrodedINSPECTION TYPE:SVAFT FUSELAGE SHEAR CLIP HAS EXFOLIATED CORROSION AT STA. Y=1996.75 BETWEEN LON 48R AND LON 50RREMOVED,FABRICATED AND REPLACED CORRODED SHEAR CLIP AT STA. Y=1996.75 BETWEEN LON 48R AND 50R IAW SRM 51-35-01 (MINOR)Aug 30, 2021 · N296UP · Doug MD11FSDR SIMA2021091388003Shear Tie · corrodedSSI 53-23-003 SHEAR CLIP CORRODED FR-88 STR-28R MARKED (LEVEL 2 CORROSION)-C/A-RAR FR 88 STGR 27R-28R SHEAR CLIP IAW EMB-175 SRM 51-40-08..Aug 28, 2021 · N223NN · Emb ERJ170200LRSDR IPXA2021082873240Shear Tie · crackedINSPECTION TYPE:A300RH FR44 FRAME FOOT FITTING HAS A CRACKACCOMPLISHED REPAIR PER EO A300-5310-46789-G APPENDIX KAug 28, 2021 · N128UP · Airbus A300F4622RSDR SWIA202161883None · corrodedGALLEY 1 SUPPORT INSTALLATION SILL CORRODED JUST FORWARD OF GALLEY SERVICE DOOR ENTRANCE. (C-CHECK RO 10/22/2021) REPLACED GALLEY 1 SUPPORT INSTALLATION SILL BETWEEN FS280-FS319.7 REF DWG SH690-32170 REV.Y AND CRJ900 SRM 51-42-06-001-001-A01, AND CRJ900Aug 27, 2021 · N554CA · Cndair CL6002D24SDR DALA2021082605060Shear Tie · corrodedDURING INSPECTION MAINTENANCE FOUND CORROSION LEVEL 2 ON AFT CARGO SHEAR TIE AT STA 1263. S-38L TO S-39L. REPLACED SHEAR TIE. (LP 1925327)Aug 26, 2021 · N186DN · Boeing 767332SDR DALA2021082605059Shear Tie · corrodedDURING INSPECTION MAINTENANCE FOUND CORROSION LEVEL 2 ON AFT CARGO SHEAR TIE AT STA 1263. S-37L TO S-38L. REPLACED SHEAR TIE. (LP 1925322)Aug 26, 2021 · N186DN · Boeing 767332SDR SWIA202161729None · damagedFLOOR BEAM FROM FS 574 TO FS 605 ON LBL 27.00 REQUIRES REPLACEMENT (C-CHECK RO 10/8/2021) FLOOR BEAM P/N 601R35031-263 FROM FS574.00 TO FS605.00 ON LBL 27.00 WAS REMOVED AND REPLACED WITH A NEW BEAM IAW REO 601R-53-61-3778 REV. B, DATE: 2016-12-19, RAug 25, 2021 · N946SW · Cndair CL6002B19SDR R61A2021091200730Shear Tie · corrodedWHILE AC WAS IN FOR HVY CK FOUND FWD CARGO SHEAR CLIP CORRODED AT FR 17, STR24R TO STR 23R. MX REPLACED SHEAR CLIP PN 170-03866-002 IAW SRM 51-41-02, 51-43-01. SEE AAR NRC# 45000949-1000-0252 FOR WORK PERFORMED. AC WAS RTS.Aug 25, 2021 · N651RW · Emb ERJ170100SESDR R61A2021090700708Shear Tie · corrodedDURING HEAVY CHECK MAINTENANCE FOUND FWD CARGO SHEAR CLIP CORRODED AT FR17, STR 24R TO STR 23R. FWD CARGO CLIP AT FR17, STR 24R TO STR 23R REMOVED AND REPLACED IAW EMB SRM 51-41-02 AND 51-43-01.Aug 25, 2021 · N651RW · Emb ERJ170100SESDR R61A2021090700707Shear Tie · corrodedDURING HEAVY CHECK MAINTENANCE FOUND FWD CARGO SHEAR CLIP CORRODED AT FR16, STR 28R TO STR 27R. FWD CARGO SHEAR CLIP AT FR16, STR 28R TO 27R REMOVED AND REPLACED IAW EMB SRM 51-41-02 AND 51-43-01.Aug 25, 2021 · N651RW · Emb ERJ170100SESDR IPXA2021091093758Shear Tie · damagedINSPECTION TYPE:SVAFT FUSELAGE SHEAR TIE HAS AN EXTRA DAMAGE FASTENER HOLE AT STA.1926 BETWEEN LON 51L AND LON 52.REMOVED,FABRICATED AND REPLACED AFT FUSELAGE DAMAGED SHEAR TIE AT STA.1926 BETWEEN LON 51L AND LON 52 IAW SRM 51-33-01 (MINOR).Aug 23, 2021 · N296UP · Doug MD11FSDR IPXA2021082873241Shear Tie · crackedINSPECTION TYPE:A300LH FR44 FRAME FOOT FITTING HAS A SIGN OF CRACKACCOMPLISHED REPAIR PER EO A300-5310-46789-G APPENDIX JAug 23, 2021 · N128UP · Airbus A300F4622RSDR DALA2021082304947Shear Tie · corrodedDURING INSPECTION MAINTENANCE FOUND CORROSION LEVEL 2 FWD CARGO SHEAR TIE AT STA 632. S-36R TO S-35R. REPLACED SHEAR TIE. (LP 1921649)Aug 23, 2021 · N186DN · Boeing 767332SDR DALA2021082304946Shear Tie · corrodedDURING INSPECTION MAINTENANCE FOUND CORROSION LEVEL 2 AFT CARGO SHEAR TIE AT STA 1197+22. S-38R TO S-39R. REPLACED SHEAR TIE. (LP 1921646)Aug 23, 2021 · N186DN · Boeing 767332SDR SWIA202162419None · corroded*AREAS OF CORROSION ON RH PRESSURE FLOOR SILL ANGLE BETWEEN FS 797.00 €“ 830.00 (C-CHECK RO 11/5/2021) BLENDED OUT CORROSION ON RH PRESSURE FLOOR SILL ANGLE BETWEEN FS 797.00 €“ 830.00. REF REO 670-53-41-546 REV -- DATE 2021-09-15 ALL STEPS COMPLIED Aug 22, 2021 · N614SK · Cndair CL600*SDR SWIA202162417None · corroded*AREAS OF CORROSION ON RH PRESSURE FLOOR SILL ANGLE BETWEEN FS 752.00 €“ 797.00 (C-CHECK RO 11/5/2021) BLENDED OUT CORROSION ON RH PRESSURE FLOOR SILL ANGLE BETWEEN FS 752.00 €“ 797.00. REF REO 670-53-41-546 REV -- DATED 2021-09-15 ALL STEPS COMPLIED Aug 22, 2021 · N614SK · Cndair CL600*SDR SWIA202162416None · corroded*AREAS OF CORROSION ON RH PRESSURE FLOOR SILL ANGLE BETWEEN FS 736.00 €“ 752.00 (C-CHECK RO 11/5/2021) BLENDED OUT CORROSION ON RH PRESSURE FLOOR SILL ANGLE BETWEEN FS 736.00 €“ 752.00. REF REO 670-53-41-546 REV -- DATED 2021-09-15 ALL STEPS COMPLIEDAug 22, 2021 · N614SK · Cndair CL600*SDR SWIA202162414None · corroded*AREAS OF CORROSION ON RH PRESSURE FLOOR SILL ANGLE BETWEEN FS 693.00 €“ 708.00 (C-CHECK RO 11/5/2021) REPAIRED AREAS ON RH PRESSURE FLOOR SILL ANGLE BETWEEN FS693.00-FS708.00 REF REO 670-53-41-546 REV -- DATED 2021-09-15. PRESSURE CHECK GOOD. COMPLIEDAug 22, 2021 · N614SK · Cndair CL600*SDR SWIA202162412None · corroded*AREAS OF CORROSION ON LH PRESSURE FLOOR SILL ANGLE BETWEEN FS 797.00 €“ 830.00 (C-CHECK RO 11/5/2021) REMOVED CORROSION ON LH PRESSURE FLOOR SILL ANGLE BETWEEN FS 797.00 - FS 830.00 REF REO 670-53-41-550 REV -- DATE 2021-09-24. COMPLIED WITH TASK CARDAug 22, 2021 · N614SK · Cndair CL600*SDR SWIA202162411None · corroded*AREAS OF CORROSION ON LH PRESSURE FLOOR SILL ANGLE BETWEEN FS 752.00 €“ 797.00 (C-CHECK RO 11/5/2021) REMOVED CORROSION ON LH PRESSURE FLOOR SILL ANGLE BETWEEN FS 752.00 - FS 797.00 REF REO 670-53-42-546 REV -- DATE 2021-09-15. AND REF CRJ700 SRM 51-2Aug 22, 2021 · N614SK · Cndair CL600*SDR SWIA202162409None · corroded*AREAS OF CORROSION ON LH PRESSURE FLOOR SILL ANGLE BETWEEN FS 693.00 €“ 708.00 (C-CHECK RO 11/5/2021) COMPLIED WITH ALL STEPS OF MHIRJ REO 670-53-41-554 REV -- DAT 2021-09-30 FOR REPAIR OF LH PRESSURE FLOOR SILL ANGLE BETWEEN F.S. 693.00 - 708.00.Aug 22, 2021 · N614SK · Cndair CL600*SDR SWIA202162091None · cracked*SUSPECTED CRACK ON ANGLE AT FLOOR SUPPORT BRKT COMMON TO 280 CROSSBEAM AT RBL9 (MARKED) (C-CHECK RO 10/29/2021) REMOVED AND REPLACED ANGLE (GUSSET) AT FLOOR SUPPORT ASSY COMMON TO FS280 RBL9 REF CRJ700 SRM51-42-06-001-001-A01. SEE CONTINUE CARD FOR DEAug 21, 2021 · N706SK · Cndair CL600*SDR SWIA202162017None · cracked*SUSPECTED CRACK AT FLOOR BEAM MOUNTED TO FLOOR POST AT RBL9 AND FS280 (MARKED) BELOW CROSSBEAM (C-CHECK RO 10/29/2021) FLOOR BEAM REPAIR IS AT LOCATION RBL 12.0 (SEE CONTINUE CARD ITEM# 17) REPAIRED COCKPIT FLOOR BEAM AT LBL 12.0 TO CRJ 700 SRM 53-11-Aug 21, 2021 · N706SK · Cndair CL6002C10SDR SWIA202162016None · cracked*SUSPECTED CRACK AT FLOOR BEAM MOUNTED TO FLOOR POST AT LBL9 AND FS280 (MARKED) BELOW CROSSBEAM (C-CHECK RO 10/29/2021) REPAIRED CRACK IN LBL 12.0 BEAM PER CRJ 700 SRM 53-11-201-003-A01,REF CRJ 700 SRM 51-42-06-001-001-A01, CRJ 700 SRM 51-42-13-001-001-Aug 21, 2021 · N706SK · Cndair CL6002C10SDR SWIA202162013None · corroded*CORROSION NOTED ON FLOOR BEAM CAP AT APPROX. RBL27 AND FS1015.00-FS1031(MARKED) (C-CHECK RO 10/29/2021) REPAIRED FLOORBEAM CAP AT APPROX. RBL27 AND FS1015 TO FS1031 REF CRJ700 SRM 51-21-06-001-001-A01 AND REO 670-53-61-1949 REV.-- DATED 2021-09-04 ALL Aug 21, 2021 · N706SK · Cndair CL6002C10SDR SWIA202162012None · corroded*R/H FLOOR SILL CORRODED AT APPROX.FS1031-FS1047 (MARKED) (C-CHECK RO 10/29/2021) REMOVED AND REPLACED R/H FLOOR SILL WITH NEW ONE. REF: CRJ-700 S.R.M.51-42-06-001-001-A01, DWG-MM670-35052 REV-K. COMPLIED WITH 51-900-1002-SKY.Aug 21, 2021 · N706SK · Cndair CL6002C10SDR SWIA202162011None · corroded*R/H FLOOR SILL CORRODED AT APPROX. FS1047.00-FS1069.00 (C-CHECK RO 10/29/2021) INSTALLED NEW FLOOR SILL P/N MM670-35405-001 AT FS1047-FS1069 REF DWG NO.MM670-35052 REV -K AND CRJ700 SRM 51-42-06-001- / 001-A01 PRESSURE CHECK GOOD. COMPLIED WITH 51-900-Aug 21, 2021 · N706SK · Cndair CL6002C10SDR SWIA202162009None · corroded*CORROSION NOTED ON FLOOR BEAM CAP AT LBL27 AND AT APPROX. FS1030.00-FS1051.00 (C-CHECK RO 10/29/2021) CORROSION ON FLOOR BEAM CAP AT LBL27 AND AT APPROX. FS1030.00-FS1051.00 WAS BEYOND LIMITS OF CRJ700 SRM 53-61-43-101-001-A01, REPLAIRED FLOOR BEAM LBLAug 21, 2021 · N706SK · Cndair CL6002C10SDR SWIA202162008None · corroded*L/H FLOOR SILL CORRODED FROM APPROX.FS985.00-1000.00 (MARKED) (C-CHECK RO 10/29/2021) REPLACED CORRODED LH FLOOR SILL FROM APPROX FS985 TO FS1000 WITH SERVICEABLE UNIT. ALL STEPS OF REO 670-53-61-1957 REV-- DATED 2021-09-22. COMPLIED WITH TASK CARD 5Aug 21, 2021 · N706SK · Cndair CL6002C10SDR SWIA202162003None · corroded*CORROSION NOTED AT R/H FLOOR SILL BETWEEN FS280.00-FS319.00 (MARKED) (C-CHECK RO 10/29/2021) INSTALLED RH FLOOR SILL BETWEEN FS280.00 TO FS319.00. REF CRJ-700 SRM 51-42 -06-001-001-A01, SRM 51-42-21-001-001-A01, SRM 51-42-13-001-001-A01 AND DWG SH670-Aug 20, 2021 · N706SK · Cndair CL6002C10SDR SWIA202162002None · corroded*CORROSION NOTED ON FLOOR BEAM CAP AT RBL9 AND AT APPROX. FS549.00-FS565.00 (MARKED) (C-CHECK RO 10/29/2021) REMOVED DAMAGED FLOOR BEAM DUE TO OUT OF LIMITS REF CRJ700 SRM 53-31-43-101-001-A02 / REPLACED FLOOR BEAM REPAIRED AND COMPLIED WITH REF CRJ700 Aug 20, 2021 · N706SK · Cndair CL6002C10SDR SWAA2021100409455Support · corrodedCORROSION ON FLOOR TO SIDEWALL SUPPORT AT FWD CARGO BAY BS400 TO BS420 LBL23 WL156. ; / CORROSION ON SUPPORT WAS FOUND TO BE OUT OF LIMITS DUE TO PROXIMITY TO FASTENER HOLES PER SRM 53-00-53-1A-2 FIG 103 DETAIL REMOVED FLOOR TO SIDEWALL SUPPORT AT FWD CARGO BAAug 20, 2021 · N7822A · Boeing 73776NSDR SWAA2021100409454Support · corrodedCORROSION ON FLOOR TO SIDEWALL SUPPORT AT FWD CARGO BAY BS411 RBL24 WL156. ; / [01] CORROSION ON SUPPORT WAS FOUND TO BE OUT OF LIMIT DUE TO PROXIMITY TO FASTENER HOLES PER SRM 53-00-53-1A-2 FIGURE 103 DETAIL D.; [02] VERIFIED OUT OF LIMITS PER SRM 53-00-53-1AAug 20, 2021 · N7822A · Boeing 73776NSDR SWAA2021100409453Support · corrodedCORROSION ON AFT BULKHEAD TO FLOOR SUPPORT AT FWD CARGO BAY BS500D LBL23 TO RBL23 WL156. ; / [01] CORROSION ON SUPPORT FOUND TO BE OUT OF LIMITS DUE TO NO LIMITS ARE GIVEN IN THE SPM.; [02] VERIFIED NO LIMITS; REPAIR BY REPLACEMENT OF PART.; [03] CORROSION ON Aug 20, 2021 · N7822A · Boeing 73776NSDR DALA2021082104923Shear Tie · corrodedDURING INSPECTION MAINTENANCE FOUND CORROSION LEVEL 2 ON FWD CARGO SHEAR TIE AT STA 654+66. S-37L TO S-38L. REPLACED SHEAR TIE. (LP 1918238)Aug 20, 2021 · N186DN · Boeing 767332
Back to JASC 5322