Airbus A319-111

Service difficulty reports · 2,475

Newest first. General aviation reporting is voluntary.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE aircraft_model_key = 'A319111'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR F3LA200800596Floor Panel · puncturedREFERENCE NON ROUTINE C050458. DURING C3 C-CHECK INSPECTION NOTED TRANSITION PANEL 131CF WAS PUNCTURED. MX REPAIRED CARGO COMPARTMENT TRANSITION PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-02-00 FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WASSep 4, 2008 · N929FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800595Floor Panel · puncturedREFERENCE NON ROUTINE C050457. DURING C3 C-CHECK INSPECTION NOTED TRANSITION PANEL 131EG WAS PUNCTURED. MX REPAIRED CARGO COMPARTMENT TRANSITION PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-02-00 FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WASSep 4, 2008 · N929FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800594Floor Panel · puncturedREFERENCE NON ROUTINE C050375. DURING C3 C-CHECK, INSPECTION NOTED TRANSITION PANEL 161CF WAS PUNCTURED. MX REPAIRED CARGO COMPARTMENT TRANSITION PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-02-00 FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WASep 4, 2008 · N929FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800593Floor Panel · puncturedREFERENCE NON ROUTINE C050374. DURING C3 C-CHECK, INSPECTION NOTED TRANSITION PANEL 161BF WAS PUNCTURED. MX REPAIRED CARGO COMPARTMENT TRANSITION PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-02-00 FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WASep 4, 2008 · N929FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800592Floor Panel · puncturedREFERENCE NON ROUTINE C050372. DURING C3 C-CHECK, INSPECTION NOTED TRANSITION PANEL I51FF WAS PUNCTURED. MX REPAIRED CARGO COMPARTMENT TRANSITION PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-02-00 FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WASep 4, 2008 · N929FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800591Floor Panel · puncturedREFERENCE NON ROUTINE C050370. DURING C3 C-CHECK, INSPECTION NOTED TRANSITION PANEL I51UG WAS PUNCTURED. MX REPAIRED CARGO COMPARTMENT TRANSITION PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-02-00 FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WASep 4, 2008 · N929FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800590Floor Panel · puncturedREFERENCE NON ROUTINE C050368. DURING C3 C-CHECK, INSPECTION NOTED TRANSITION PANEL I51TG WAS PUNCTURED. MX REPAIRED CARGO COMPARTMENT TRANSITION PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-02-00 FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WASep 4, 2008 · N929FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800589Floor Panel · puncturedREFERENCE NON ROUTINE C050366. DURING C3 C-CHECK, INSPECTION NOTED TRANSITION PANEL I52UG WAS PUNCTURED. MX REPAIRED CARGO COMPARTMENT TRANSITION PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 53-02-00 FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WASep 4, 2008 · N929FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800598Floor Panel · corrodedREFERENCE NON ROUTINE C050516. DURING C3 C-CHECK, INSPECTION NOTED FLOOR PANEL 262FF HAS CORROSION ON LOWER SURFACE. MX R&R FLOOR PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 AMM 53-42-12 PB 401. UPON COMPLETION OF THE REPAIR, IT WAS INSPECTED AND FOUNSep 4, 2008 · N929FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800602Hinge · damagedREF NON ROUTINE C050746. DURING C3 C-CHECK, INSP FOUND DAMAGE ON THE RT NR (4) SPOILER ANTI-ROTATION WEB. MAINT MACHINED AREA, FABRICATED REINFORCING PLATE AND PROTECTED AREA IAW EA NR A9-57R-30609. UPON COMPLETION OF THE REPAIR, IT WAS INSPECTED AND FOUND ACCSep 3, 2008 · N929FR · Airbus A319111 · SpoilersSDR F3LA200800603Hinge · damagedREF: NOT ROUTINE C050745. DURING C3 C-CHECK, INSPECTION FOUND DAMAGE ON THE RT NR (2) SPOILER ANTI-ROTATION WEB. MAINT MACHINED AREA, FABRICATED REINFORCING PLATE AND PROTECTED AREA IAW ENGINEERING AUTHORIZATION NR A9-57R-30610. UPON COMPLETION OF THE REPAIR, Sep 3, 2008 · N929FR · Airbus A319111 · SpoilersSDR F3LA200800588Floor Panel · corrodedREFERENCE NON ROUTINE CO50125. DURING C3 C-CHECK, INSPECTION NOTED FLOOR PANEL 261PF HAS A CORRODED INSERT ON THE LT HAND SIDE AND DELAMINATION IN THE SAME AREA. MX REPAIRED PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF ENGINEERING AUTHORIZATION NR A9-53R-305Aug 26, 2008 · N928FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800584Floorbeam · corrodedREFERENCE NON ROUTINE CO50117. DURING C3 C-CHECK, INSP NOTED LT FLOORBEAM Y1292 HAS CORROSION IN VARIOUS NUT CLIP HOLES FROM FRAME 66 TO FRAME 68 (L2 DOOR AREA). MX R&R THE FLOORBEAM IAW THE REQUIREMENTS OF ENGINEERING AUTHORIZATION NR 19-53R-30587. UPON CAug 23, 2008 · N928FR · Airbus A319111 · Fuselage Main, Floor BeamSDR F3LA200800585Floor Support · corrodedREFERENCE NON ROUTINE CO50117. DURING C3 C-CHECK, INSP NOTED LT FLOOR SUPPORT Y1292 HAS CORROSION IN VARIOUS NUT CLIP HOLES FROM FRAME 66 TO FRAME 68 (L2 DOOR AREA). MX R&R THE FLOOR SUPPORT IAW THE REQUIREMENTS OF EA NR A9-53R-30587. UPON COMPLETION OF THEAug 23, 2008 · N928FR · Airbus A319111 · Fuselage Miscellaneous StructureSDR F3LA200800580Floor Panel · damagedREFERENCE NON ROUTINE C049995. DURING C3 C-CHECK INSPECTION NOTED THE FORWARD OUTBOARD CORNER WAS DAMAGED ON FLOOR PANEL 242LF. MX REPAIRED DAMAGE TO PANEL 242LF IN ACCORDANCE WITH THE REQUIREMENTS OF ENGINEERING AUTHORIZATION NR A9-53R-30577. UPON COMPLETIOAug 22, 2008 · N928FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800583Floorbeam · corrodedREFERENCE NON ROUTINE CO50040. DURING C3 C-CHECK, INSP NOTED FLOOR BEAM Y1292 HAS CORROSION IN VARIOUS NUT CLIP HOLES FROM RT HAND FRAME 67 TO FRAME 68. MAINTENANCE INSTALLED NEW FLOOR BEAM IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 51-42-11 AND ENGINEEAug 22, 2008 · N928FR · Airbus A319111 · Fuselage Main, Floor BeamSDR F3LA200800582Floorbeam · corrodedREFERENCE NON ROUTINE CO50039. DURING C3 C-CHECK, INSP NOTED FLOOR BEAM Y1292 HAS CORROSION IN VARIOUS NUT CLIP HOLES FROM RT HAND FRAME 66 TO FRAME 67. SUPPLEMENTAL INFORMATION WILL BE PROVIDED AS SOON AS CORRECTIVE ACTION INFORMATION BECOMES AVAILABLE. MX Aug 22, 2008 · N928FR · Airbus A319111 · Fuselage Main, Floor BeamSDR F3L2008F00004Floorbeam · corrodedREFERENCE NON ROUTINE C050039. DURING C3 C-CHECK, INSP NOTED FLOOR BEAM Y1292 HAS CORROSION IN VARIOUS NUT CLIP HOLES FROM RT HAND FRAME 66 TO FRAME 67. SUPPLEMENTAL INFORMATION WILL BE PROVIDED AS SOON AS CORRECTIVE ACTION INFORMATION BECOMES AVAILABLE. (OAug 22, 2008 · N928FR · Airbus A319111 · Fuselage Main, Floor BeamSDR F3L2008F00003Shear Plate · corrodedREFERENCE NON ROUTINE C050055. DURING C3 C-CHECK, INSP NOTED INDICATIONS OF CORROSION ON TOP OF RIGHT AFT SHEAR PLATE BETWEEN FRAME 68 AND FRAME 70. MAINTENANCE REMOVED AND REPLACED SHEAR PLATE ASSEMBLY IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 51-42-1Aug 22, 2008 · N928FR · Airbus A319111 · Fuselage Miscellaneous StructureSDR F3LA200800586Sill · corrodedREFERENCE NON ROUTINE CO50131. DURING C3 C-CHECK, INSPECTION NOTED NUT PLATE HOLE ON R-2 DOOR SILL, AFT AND OUTBOARD OF R-2 AFT GIRT BAR ATTACH FITTING WAS CORRODED. MX INSTALLED REPAIR DOUBLER IN ACCORDANCE WITH THE REQUIREMENTS OF ENGINEERING AUTHORIZATIONAug 21, 2008 · N928FR · Airbus A319111 · Fuselage Miscellaneous StructureSDR F3L2008F00002Seal · corrodedREFERENCE NON ROUTINE C050131. DURING C3 C-CHECK, INSPECTION NOTED NUT PLATE HOLE ON R-2 DOOR SEAL, AFT AND OUTBOARD OF R-2 AFT GIRT BAR ATTACH FITTING WAS CORRODED. SUPPLEMENTAL INFORMATION WILL BE PROVIDED AS SOON AS CORRECTIVE ACTION INFORMATION BECOMES AAug 21, 2008 · N928FR · Airbus A319111 · Service DoorsSDR F3LA200800579Shear Plate · corrodedDURING C3 C-CHECK, INSPECTION NOTED THE LT LATERAL SHEAR PLATE HAS LIGHT CORROSION AT CLIP NUT HOLES BETWEEN FR 68 AND FR 70. MAINTENANCE REMOVED AND REPLACED SHEAR PLATE IAW THE REQUIREMENTS OF A319 SRM 51-42-11, PARAGRAPH 6. UPON COMPLETION OF THE REPAIR, Aug 21, 2008 · N928FR · Airbus A319111 · Fuselage Miscellaneous StructureSDR F3LA200800578Floor Panel · puncturedDURING C3 C-CHECK, INSPECTION NOTED THE FORWARD PIT PANEL 132EG WAS DAMAGED. MAINTENANCE REPAIRED PUNCTURED DAMAGE TO FLOOR PANEL IN ACCORDANCE WITH A319 SRM 53-02-00, FIGURE 204.Aug 20, 2008 · N928FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800577Blanking Plate · corrodedDURING C3 C-CHECK, INSPECTION NOTED R1 FORWARD GIRT BAR BLANKING PLATE HAS CORROSION AT HOLES. MAINTENANCE FABRICATED NEW NUT PLATE ASSEMBLY FOR GIRT BAR BLANKING PLATE AND INSTALLED IAW THE REQUIREMENTS OF AIRBUS DRAWING D531 12534 AND A319 SRM 51-42-11, PARAug 20, 2008 · N928FR · Airbus A319111 · Fuselage Miscellaneous StructureSDR F3LA200800576Floor Panel · puncturedDURING C3 C-CHECK, INSPECTION NOTED AFT PIT PANEL 161BF WAS DAMAGED. MAINTENANCE REPAIRED PUNCTURE DAMAGE TO PANEL 161BF IAW THE REQUIREMENTS OF A319 SRM 53-02-00, FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WAS INSPECTED AND FOUND ACCEPTABLE. (S)Aug 19, 2008 · N928FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800575Floor Panel · puncturedDURING C3 C-CHECK, INSPECTION NOTED AFT PIT PANEL 162CF WAS DAMAGED. MAINTENANCE REPAIRED PUNCTURE DAMAGE TO PANEL 162CF IAW THE REQUIREMENTS OF A319 SRM 53-02-00, FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WAS INSPECTED AND FOUND ACCEPTABLE. (S)Aug 19, 2008 · N928FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800574Floor Panel · puncturedDURING C3 C-CHECK, INSPECTION NOTED AFT PIT PANEL 151BE WAS DAMAGED. MAINTENANCE REPAIRED PUNCTURE DAMAGE TO PANEL 151BE IAW THE REQUIREMENTS OF A319 SRM 53-02-00, FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WAS INSPECTED AND FOUND ACCEPTABLE. (S)Aug 19, 2008 · N928FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800573Floor Panel · puncturedDURING C3 C-CHECK, INSPECTION NOTED AFT PIT PANEL 151UG WAS DAMAGED. MAINTENANCE REPAIRED PUNCTURE DAMAGE TO TRANSITION PANEL 151UG IAW THE REQUIREMENTS OF A319 SRM 53-02-00, FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WAS INSPECTED AND FOUND ACCEPTABLE. Aug 19, 2008 · N928FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800572Floor Panel · puncturedDURING C3 C-CHECK, INSPECTION NOTED AFT PIT PANEL 152WG WAS DAMAGED. MAINTENANCE REPAIRED PUNCTURE DAMAGE TO TRANSITION PANEL 152WG IAW THE REQUIREMENTS OF A319 SRM 53-02-00, FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WAS INSPECTED AND FOUND ACCEPTABLE. Aug 19, 2008 · N928FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800571Floor Panel · puncturedDURING C3 C-CHECK, INSPECTION NOTED AFT PIT PANEL 152XG WAS DAMAGED. MAINTENANCE REPAIRED PUNCTURE DAMAGE TO TRANSITION PANEL 152XG IAW THE REQUIREMENTS OF A319 SRM 53-02-00, FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WAS INSPECTED AND FOUND ACCEPTABLE. Aug 19, 2008 · N928FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800570Floor Panel · puncturedDURING C3 C-CHECK, INSPECTION NOTED AFT PIT PANEL 152TG WAS DAMAGED. MAINTENANCE REPAIRED PUNCTURE DAMAGE TO TRANSITION PANEL 152TG IAW THE REQUIREMENTS OF A319 SRM 53-02-00, FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WAS INSPECTED AND FOUND ACCEPTABLE. Aug 19, 2008 · N928FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800569Floor Panel · puncturedDURING C3 C-CHECK, INSPECTION NOTED AFT PIT PANEL 152UG WAS DAMAGED. MAINTENANCE REPAIRED PUNCTURE DAMAGE TO PANEL 152UG IAW THE REQUIREMENTS OF A319 SRM 53-02-00, FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WAS INSPECTED AND FOUND ACCEPTABLE. (S)Aug 19, 2008 · N928FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800568Floor Panel · puncturedDURING C3 C-CHECK, INSPECTION NOTED FORWARD PIT PANEL 131CF WAS DAMAGED. MAINTENANCE REPAIRED PUNCTURE DAMAGE TO PANEL 131CF IAW THE REQUIREMENTS OF A319 SRM 53-02-00, FIGURE 204. UPON COMPLETION OF THE REPAIR, IT WAS INSPECTED AND FOUND ACCEPTABLE. (S)Aug 19, 2008 · N928FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800566Skin · damagedMAINTENANCE NOTED LIGHTNING STRIKE DAMAGE AT LAP SEAM AT STRINGER 6L, .25 INCH FROM RIVET EDGE AT FRAME 27. ENGINEERING AUTHORIZATION A9-53R-30571 INDICATES MAJOR REPAIR. (S) MX COMPLIED WITH ENGINEERING AUTHORIZATION NR A9-53R-30571. UPON COMPLETION OF THAug 16, 2008 · N948FR · Airbus A319111 · Fuselage Main, Plate/SkinSDR F3LA200800565Skin · damagedMAINTENANCE NOTED LIGHTNING STRIKE DAMAGE AT LAP SEAM AT STRINGER 6L, .25 INCH FROM RIVET EDGE AT FRAME 28. ENGINEERING AUTHORIZATION A9-53R-30571 INDICATES MAJOR REPAIR. (S) MX COMPLIED WITH ENGINEERING AUTHORIZATION NR A9-53R-30571. UPON COMPLETION OF THAug 16, 2008 · N948FR · Airbus A319111 · Fuselage Main, Plate/SkinSDR F3LA200800564Skin · damagedMAINTENANCE NOTED LIGHTNING STRIKE DAMAGE AT LAP SEAM AT STRINGER 6L, .25 INCH FROM RIVET EDGE AT FRAME 29. ENGINEERING AUTHORIZATION A9-53R-30571 INDICATES MAJOR REPAIR. (S) MX COMPLIED WITH ENGINEERING AUTHORIZATION NR A9-53R-30571. UPON COMPLETION OF THEAug 16, 2008 · N948FR · Airbus A319111 · Fuselage Main, Plate/SkinSDR F3LA200800563Skin · damagedMAINTENANCE NOTED LIGHTNING STRIKE DAMAGE AT LAP SEAM AT STRINGER 6L, .25 INCH FROM RIVET EDGE AT FRAME 30. ENGINEERING AUTHORIZATION A9-53R-30571 INDICATES MAJOR REPAIR. (S) MX COMPLIED WITH ENGINEERING AUTHORIZATION NR A9-53R-30571. UPON COMPLETION OF TAug 16, 2008 · N5330 · Airbus A319111 · Fuselage Main, Plate/SkinSDR F3LA200800562Skin · damagedMAINTENANCE NOTED LIGHTNING STRIKE DAMAGE AT LAP SEAM AT STRINGER 6L, .25 INCH FROM RIVET EDGE AT FRAME 31. ENGINEERING AUTHORIZATION A9-53R-30571 INDICATES MAJOR REPAIR. (S) MX COMPLIED WITH ENGINEERING AUTHORIZATION NR A9-53R-30571. UPON COMPLETION OF THAug 16, 2008 · N948FR · Airbus A319111 · Fuselage Main, Plate/SkinSDR F3LA200800561Skin · damagedMAINTENANCE NOTED LIGHTNING STRIKE DAMAGE ON PRODUCTION SEAM FRAME 24, 3.5 INCHES BELOW STRINGER 7L. ENGINEERING AUTHORIZATION A9-53R-30571 INDICATES MAJOR REPAIR. (S)Aug 16, 2008 · N948FR · Airbus A319111 · Fuselage Main, Plate/SkinSDR F3LA200800560Skin · damagedMAINTENANCE NOTED LIGHTNING STRIKE DAMAGE AT LAP SEAM AT STRINGER 6L, BETWEEN FRAME 27 AND FRAME 28, 1.5 INCHES. ENGINEERING AUTHORIZATION A9-53R-30571 INDICATES MAJOR REPAIR. (S) MX COMPLIED WITH ENGINEERING AUTHORIZATION NR A9-53R-30571. UPON COMPLETION Aug 16, 2008 · N948FR · Airbus A319111 · Fuselage Main, Plate/SkinSDR F3LA200800567Skin · damagedMAINTENANCE NOTED LIGHTNING STRIKE DAMAGE AT LAP SEAM AT STRINGER 6L, .25 INCH FROM RIVET EDGE AT FRAME 26. ENGINEERING AUTHORIZATION A9-53R-30571 INDICATES MAJOR REPAIR. (S) MX COMPLIED WITH ENGINEERING AUTHORIZATION NR A9-53R-30571. UPON COMPLETION OF THAug 16, 2008 · N948FR · Airbus A319111 · Fuselage Main, Plate/SkinSDR F3LA200800544Placard · corrodedDURING C3 C-CHECK, INSPECTION NOTED R2 DOOR THRESHOLD SLIDE "ARMED" PLATE IS CORRODED ON THE BOTTOM. MAINTENANCE REMOVED AND REPLACED R2 DOOR THRESHOLD SLIDE "ARMED" PLATE IAW THE REQUIREMENTS OF A319 AMM 53-42-12-400-002. UPON COMPLETION OF THE REPAIR IT WAAug 3, 2008 · N927FR · Airbus A319111 · Placards and MarkingsSDR F3LA200800543Structure · corrodedDURING C3 C-CHECK, INSPECTION NOTED LIGHT CORROSION AT NUT PLATE LOCATIONS ON LT TRANSITION PROFILE AT FRAME 26. MAINTENANCE BLENDED CORROSION AND UPSIZED HOLE TO .3400, WITH MAXIMUM MATERIAL REMOVED OF .012, IAW THE REQUIREMENTS OF A319 SRM 51-73-00. MAINTAug 1, 2008 · N927FR · Airbus A319111 · Fuselage Miscellaneous StructureSDR F3LA200800537Floor Panel · puncturedDURING C-CHECK, INSP NOTED THE AFT CARGO PIT FLOOR PANEL, 161CF WAS PUNCTURED. MAINT REPAIRED THE PUNCTURE DAMAGE IN FLOOR PANEL 161CF IAW SRM 53-02-00 FIGURE 204. MAINT PREPARED AND PAINTED THE FLOOR PANEL 161CF IAW THE REQUIREMENTS OF AMM 25-00-00-370-001.Jul 31, 2008 · N927FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800536Floor Panel · puncturedDURING C3 C-CHECK, INSP NOTED THE AFT CARGO PIT FLOOR PANEL, 162CF, WAS PUNCTURED IN SEVERAL PLACES. MAINT REPAIRED THE PUNCTURE DAMAGE IN FLOOR PANEL 162CF IAW THE REQUIREMENTS OF SRM 53-02-00 FIGURE 204. MAINT PREPARED AND PAINTED THE FLOOR PANEL IAW THE RJul 31, 2008 · N927FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800535Floor Panel · puncturedDURING C3 C-CHECK, INSPECTION NOTED THE AFT CARGO PIT TRANSITION PANEL, 152AE, WAS DAMAGED. MAINTENANCE REPAIRED THE PUNCTURE DAMAGE IN TRANSITION PANEL 152AE IAW THE REQUIREMENTS OF A319 SRM 53-02-00 FIGURE 204. MAINTENANCE PREPARED AND PAINTED THE TRANSITIJul 31, 2008 · N927FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800534Floor Panel · puncturedDURING C3 C-CHECK, INSPECTION NOTED THE AFT PIT TRANSITION PANEL, 152XG, WAS DAMAGED. MAINTENANCE REPAIRED THE PUNCTURE DAMAGE IN TRANSITION PANEL 152XG IAW THE REQUIREMENTS OF A319 SRM 53-02-00 FIGURE 204. MAINTENANCE PREPARED AND PAINTED THE TRANSITION PANJul 31, 2008 · N927FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800533Floor Panel · puncturedDURING C3 C-CHECK, INSPECTION NOTED THE AFT PIT TRANSITION PANEL, 152WG, WAS DAMAGED. MAINTENANCE REPAIRED THE PUNCTURE DAMAGE IN TRANSITION PANEL 152WG IAW THE REQUIREMENTS OF A319 SRM 53-02-00 FIGURE 204. MAINTENANCE PREPARED AND PAINTED THE TRANSITION PANJul 31, 2008 · N927FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800532Floor Panel · puncturedDURING C-CHECK, INSP NOTED THE AFT PIT FLOOR PANEL, 151VG, WAS DAMAGED. MAINT REPAIRED THE PUNCTURE DAMAGE IN FLOOR PANEL 151VG IAW SRM 53-02-00 FIGURE 204. MAINT PAINTED THE FLOOR PANEL IAW THE REQUIREMENTS OF AMM 25-00-00-370-001. UPON COMPLETION OF THE RJul 31, 2008 · N927FR · Airbus A319111 · Fuselage Floor PanelSDR F3LA200800531Floor Panel · scratchedDURING C3 C-CHECK, INSPECTION NOTED THE FORWARD CARGO PIT LT LOWER TRANSITION PANEL 131BF HAS DEEP SCRATCHES ALONG BOTTOM EDGE. MAINTENANCE REMOVED DAMAGED AREA AND CLEANED IAW THE REQUIREMENTS OF SRM 53-02-00 PAGE 214. MAINTENANCE FILLED DAMAGED AREA IAW THJul 31, 2008 · N927FR · Airbus A319111 · Fuselage Floor Panel
Back to Airbus A319-111