Douglas DC-8-73F
Service difficulty reports · 15,471
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC873F' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC873F' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR RRXA11303Panel · delaminatedDURING A MAINTENANCE VISIT FOUND DELAMINATION DAMAGE TO L/H WING LOWER T/E PANEL I/B OF FLAP HINGE AT STA.410, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLEDSDR RRXA11302Shear Tie · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO SHEAR TIE AT STA.55 AND L34L-L34R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21 ASDR RRXA11301Shear Tie · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO DOOR PAN SHEAR TIE AT STA.35 AND L34L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-SDR RRXA11300Doubler · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO INTERNAL DOUBLER AT STA.35-70 AND L34L-L34R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-SDR RRXA11299Angle · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO R/H SIDE OF VERT. STAB LWR SKATE ANGLE AT STA.1750-1790, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED SDR RRXA11298Seat Track · wornDURING A MAINTENANCE VISIT FOUND WORN DAMAGE TO SEAT TRACK AT STA.1480 AND BL.0, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 53-2-3 FIG8A.SDR RRXA11297Doubler · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION TO L/H INTERNAL DOUBLER AT STA.8-70 AND L30L-L34R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 53-SDR RRXA11296Frame · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO FRAME AT STA.1000 AND L36, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 51-1-20D, 51-1-SDR RRXA11295Seat Track · wornDURING A MAINTENANCE VISIT FOUND WORN DAMAGE TO SEAT TRACK AT STA.513 AND RBL25, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 53-2-3 FIG8A.SDR RRXA11294Pan · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO A-PIT CROSS SLIDE DOOR PAN AT STA.320 AND L32R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-SDR RRXA11293Structure · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO RTO/B FLAP I/B TEE ANGLE AT STA. XF164, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 57-2-0 FIG2.SDR RRXA11292Rib · chafedDURING A MAINTENANCE VISIT FOUND CHAFF DAMAGE TO LT WING L/E RIB AT STA. XS250, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 57-2-0 FIG2.SDR RRXA11291Rib · chafedDURING A MAINTENANCE VISIT FOUND CHAFF DAMAGE TO LT WING CENTER L/E RIB AT STA. XS510, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 57-2-0 FIG2A.SDR RRXA11290Web · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO WEB AT STA.35-40 AND L24L-L25L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 53-1-0, 51-1-20DSDR RRXA11352Skin · corrodedDURING A MAINTENANCE VISIT FOUND EMPINNAGE EXT SKIM, FS 1793, R STR 26, HAS HEAVY CORR EXFOLIATION AROUND A FASTNER, *** CORRECTIVE ACTION *** CUT OUT DAMAGE AREA, FABRICATED REPAIR DOUBLER PER SRM 53-5-0 FIG 46A18, FILLER PER SRM 53-2-0 FIG 1D AND INSTALLED SDR RRXA11289Fitting · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO C-PIT CROSS SLIDE DOOR FWD UPPER CUTOUT SUPPORT FITTING, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW SDR RRXA11288Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO LT WING UPPER SKIN AT STA. XW408 AND STR.6, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM SDR RRXA11287Skin · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO LT. WING UPPER SKIN AT STA. XRS261 AND STR.13, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 5SDR RRXA11286Floorbeam · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO FLOORBEAM ATS STA.1700 AND RBL 24, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DHSK606-343. (CORROSION DAMAGE RECORDED IN ESDR RRXA11285Hinge · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO R/H O/B FLAP SPRING PANEL I/B HINGE AT STA.219, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM SDR RRXA11284Angle · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO VERTICAL STAB R/H ATTACH ANGLE 10" FWD OF FWD SPAR, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DSDR RRXA11283Doubler · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO L/H I/B AILERON PANEL #541 INTERNAL DOUBLER. DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DHSK606-513.SDR RRXA11282Track · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO C-PIT CROSS SLIDE AFT JAMB TRACK GUIDE AT STA.1220 AND L32L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 51-1-2SDR RRXA010051Gyro · failedF/OS GYRO FAILED ON CLIMB IN BOTH NORMAL AND AUX POSITION. REPLACED EXISTING HARNESS IAW 34-2-2 WITH NEW WIRE F/R50-119 FORWARD OF FO'S PANEL BACK TO R50-61 RADIO RACK SHELF NR 3 OPERATIONAL CK I/A/W DC8 M.M CHAP 34-25-0 (CK GOOD)SDR RRXA11281Intercostal · gougedDURING A MAINTENANCE VISIT FOUND GOUGED DAMAGE TO B-PIT DOOR FWD JAMB INTERCOSTAL AT STA.515-520 AND L31R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAWSDR RRXA11280Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO R/H UPPER WING SKIN AT STA. XRS22.750 AND STR#3, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8SDR RRXA11279Panel · gougedDURING A MAINTENANCE VISIT FOUND GOUGED DAMAGE TO L/H FLAP AT STA.410, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 51-3-0.SDR RRXA11277Web · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO B-PIT TORQUE BOX WEB AT STA515-520, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-4,SDR RRXA11276Web · tool damageDURING A MAINTENANCE VISIT FOUND DRILLED DAMAGE TO FWD ENTRY DOOR TORQUE BOX WEB AT STA.70 AND L11L-L22L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 51-1-20D SDR RRXA11275Web · misdrilledDURING A MAINTENANCE VISIT FOUND DRILL DAMAGE TO FWD ENTRY DOOR INNER SKIN FWD LOWER WEB, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-2SDR RRXA011046Harness · defectiveF/O`S GYRO FAILED ON CLIMB IN BOTH NORMAL AND AUX POSITION. REPLACED EXISTING HARNESS IAW 34-2-2 WITH NEW WIRE F/R50-119 FORWARD OF F/O'S PANEL BACK TO R50-61 RADIO RACK SHELF NR 3 OPERATIONAL CK IAW DC8 MM CHAP 34-25-0 (CK GOOD).SDR RRXA11274Intercostal · tool damageDURING A MAINTENANCE VISIT FOUND DRILL DAMAGE TO D-PIT TORQUE BOX WEB INTERCOSTAL AT STA.1440 AND L32R-L34R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 53-2-0 FIG.1F ASDR RRXA11351Skin · corrodedDURING A MAINTENANCE VISIT FOUND SKIN ON RT FWD SERVICE DOOR, CORROSION OUT OF LIMITS. CUT OUT DAMAGE AREA IAW SRM 52-2-0 FIG 4, FABRICATED& INSTALLED REPLACEMENT PART IAW SRM 52-2-0 FIG 4 & 52-3-1 FIG 3 AND 51-1-21,SDR RRXA11350Skin · crackedDURING A MAINTENANCE VISIT FOUND D PIT DOOR FRAME AT FUSELAGE SKIN CRACKED, GOUGED AND A PIECE MISSING. TRIMMED OUT DAMAGE, NDT NO FURTHER CRACKS EXIST. FABRICATED DOUBLER AND 2 FILLERS PER SK 873-052. INSTALLED FILLERS AND DOUBLER IAW SK 873-052, SRM 51-1-SDR RRXA010050Transmitter · failedREJECTED T/O AT DAY, GREATER 60 KTS, NR 2 OIL PRESSURE GAUGE SHOWED AT LEAST 15 PSI HIGHER THAN OTHERS, AND APPEARED TO CONTINUE TO CLIMB. REMOVED AND REPLACED NR 2 ENGINE OIL PRESSURE TRANSMITTER IAW M/M 79-32-1. OPS CHECKS GOOD IAW M/M 71-00-00.SDR RRXA11311Fitting · chafedDURING A MAINTENANCE VISIT FOUND CHAFF DAMAGE A-PIT CROSS SLIDE LOWER LATCHES, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED PARTS AND INSTALLED IAW DC-8 SRM 53-20-0 FIG1F, 51-1-21.SDR RRXA11273Support · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO A-PIT CROSS SLIDE DOOR JAMB FLOOR SUPPORT AT STA.340 AND L32L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSSDR RRXA11272Fitting · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO B-PIT SPLICE FITTING AT STA.440-460 AND L31R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 5SDR RRXA11271Intercostal · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO B-PIT INTERCOSTAL AT STA.440 AND L31R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-20DSDR RRXA11270Seat Track · wornDURING A MAINTENANCE VISIT FOUND WORN DAMAGE TO FIRST OFFICERS SEAT TRACK I/B AND O/B, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-3-0.SDR RRXA11269Seat Track · wornDURING A MAINTENANCE VISIT FOUND WORN DAMAGE TO SEAT TRACK AT CAPTAINS SEAT UPPER I/B AND O/B, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 5SDR RRXA11268Fitting · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO A-PIT FRAME BANNANA FITTING AT STA.340 AND L31R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-SDR RRXA11267Fitting · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO LEFT WING UPPER #1 T/E SPOILER OUTBOARD HINGE FITTING, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DSDR RRXA11266Seat Track · wornDURING A MAINTENANCE VISIT FOUND WORN DAMAGE TO SEAT TRACK SCALLOP AT STA.505 AND RBL45, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 53-2-3 SDR RRXA11265Doubler · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO AFT ACCY COMPARTMENT INTERNAL SKIN DOUBLER AT STA.1640-1670 AND L31R-L32R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED SDR RRXA11264Slide · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO A-PIT FLOOR SUPPORT DOOR JAMB AT STA.280 AND L32R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DSDR RRXA11263Doubler · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO R/H WING O/B L/E INBOARD INTERNAL DOUBLER, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1SDR RRXA11262Longeron · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO FITTING AT L17R AND IN #60 HOLE, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21 AND DWSDR RRXA11261Strap · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO A/C BAY SUB-FLOOR AT STA.35-55 AND LBL48, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRMSDR RRXA11260Longeron · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO FWD ACCY COMPARTMENT LONGERON AT STA.45 AND L34R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 S
Back to Douglas DC-8-73F