Douglas DC-8-73F
Service difficulty reports · 15,471
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC873F' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC873F' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR RRXA11259Fitting · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO SEAT TRACK SUPPORT FITTING AT STA.1320 AND L33R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-SDR RRXA11258Doubler · tool damageDURING A MAINTENANCE VISIT FOUND DRILL DAMAGE TO FWD ENTRY DOOR FWD LOWER CORNER, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 53-2-3 FIG.1, 52-2-2 FIG.7, 51-1-21.SDR RRXA11257Longeron · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO FWD ACCY COMPARTMENT LONGERON AT STA.55-70 AND L33R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAWSDR RRXA11256Fitting · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO INTERCOSTAL ATTACH FITTING AT STA. 1280 AND L33R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SSDR RRXA11255Doubler · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO R/H WING CENTER L/E AT STA. XS461.372, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-20D SDR RRXA11254Longeron · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO LONGERON AT STA. 8-70 AND L33L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 51-1-21 AND 51SDR RRXA11253Bracket · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO R/H I/B L/E PNEUMATIC DUCT SUPPORT BRACKET, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1SDR RRXA11252Angle · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO C-PIT ANGLE AT STA.1220-1228 AND L27R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-SDR RRXA11251Angle · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO FLOOR BEAM SUPPORT ANGLE STA.70 AND LBL30, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-3-SDR RRXA11250Intercostal · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO L/H AFTNLG DOOR INTERCOSTAL AT L32L-L33L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-2SDR RRXA11249Angle · tool damageDURING A MAINTENANCE VISIT FOUND DRILL DAMAGE TO FWD ENTRY DOOR TORQUE BOX DOOR JAMB AT STA.70 AND L18L-L19L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 51-1-2SDR RRXA11248Frame · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO FRAME AT STA.1395 AND L28R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 53-2-0 FIG.SDR RRXA11247Clip · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO CTR KEEL LOWER DOOR FRAME ATTACH CLIP AT STA.958, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 51-1-20D.SDR RRXA11246Panel · damagedDURING A MAINTENANCE VISIT FOUND HOLE DAMAGE TO FUSELAGE PANEL BETWEEN MLG WW DOORS AT STA.857-980, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM51-1-21, 51-20D.SDR RRXA11245Panel · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO RT WING LOWER T/E PANEL I/B OF #1 SPOILER AT STA.XW3, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-SDR DHL2001803006Plug · unsecureNR 2 ENG FIRE WARNING. BOTH A & B LOOP. EMERGENCY CHECKLIST RUN - AFT FIRE BOTTLE DISCHARGED. FOUND COMBUSTER BORESCOPE PLUGS, 1 AND 3 O'CLOCK, IMPROPERLY SECURED. RESECURED 2 BORESCOPE PLUGS PER CFM M/M 72-42-00. PERFORMED VISUAL INSPECTION OF ENGINE ANDSDR RRXA11244Seat Track · wornDURING A MAINTENANCE VISIT FOUND WORN DAMAGE TO SEAT TRACK SCALLOPS AT STA.952 AND LBL25, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM51-1-20DSDR RRXA11243Seat Track · wornDURING A MAINTENANCE VISIT FOUND WORN DAMAGE TO SEAT TRACK SCALLOPS AT STA.300 AND LBL60, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-20SDR RRXA11242Fitting · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO RT WW FITTING AT STA.980 AND BL60, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-20D.SDR RRXA11241Angle · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO B-PIT FRAME AT STA.400 AND L33R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 53SDR RRXA11240Fitting · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO D-PIT DOOR JAMB TORQUE BOX FITTING AT STA.1180 AND L33R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED SDR RRXA11239Skin · dentedDURING A MAINTENANCE VISIT FOUND DENT DAMAGE TO SKIN AT STA.165 AND L35R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 53-2-0 FIG.2.SDR DHL2001805014Engine · power lossDURING CLIMB FROM FL310 TO 350 ENG NR 3 SPOOLED BACK TO IDLE THRUST. THRUST LEVER HAD NO EFFECT. DURING RELIGHT ATTEMPT N2 WOULD NOT ACCELERATE ABOVE 11%, N1 30%, N2 10% OR PRESS 3 PSI TIME 2 HOURS. REMOVED AND REPLACED NR 3 ENG IAW MM 71-00, OPS CHECKS OK SDR RRXA11238Bracket · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO R/H WING I/B AND O/B FIRE BOTTLE BRACKET, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-2SDR RRXA11237Structure · damagedDURING A MAINTENANCE VISIT FOUND DRILL DAMAGE TO FWD ENTRY DOOR TORQUE BOX TEE, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-20D, 51-1-20, AND DWG 4614602.SDR RRXA11236Intercostal · tool damageDURING A MAINTENANCE VISIT FOUND DRILL DAMAGE TO FWD ENTRY DOOR TORQUE BOX, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW DC-8 SRM 51-1-21, 51-1-21D AND DWG 5597646.SDR RRXA11235Fitting · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO A-PIT CROSS SLIDE TORQUE BOX BATHTUB FITTING AT STA.320 AND L33R-L34R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART SDR RRXA11234Frame · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO FRAME UPPER FRAME AT STA1060 AND L31R-L34R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM SDR RRXA11233Fitting · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO A-PIT FWD TORQUE BOX BATHTUB FITTING AT STA.270 AND L32R-L33R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTSDR RRXA11232Seat Track · wornDURING A MAINTENANCE VISIT FOUND WORN DAMAGE TO SEAT TRACK AT STA.160 AND LBL25, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 53-2-3, 51-3-0.SDR RRXA11231Doubler · chafedDURING A MAINTENANCE VISIT FOUND CHAFED DAMAGE TO LT I/B SLOT UPPER DOOR AT STA. XS250, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-20D, 57-2-0 FIG.6.SDR UPS01836076Skin · corrodedINSPECTION TYPE:C1 EXTERNAL FUSELAGE STA 1740 L28R - L30R SKIN HAS A BULGE AND ONE FASTENER HEAD BELOW SKIN. REMOVED FASTENER IAW DC8 SRM 51-1-21. REMOVED CORROSION IAW DC8 SRM 51-1-8, FOUND TO BE OUT-OF-LIMITS IAW DC8 SRM 53. FAB EXTERNAL DOUBLER FINGER DOSDR UPS01836021Engine · flamed outINSPECTION TYPE:N/A NR 3 ENG FLAME-OUT IN CRUISE WITH NO KNOWN CAUSE. FL370 A/S M.80.OAT-54C 10.5 LBS ON FUEL. FOLLOWED FLAME-OUT CHECKLIST AND ENG RELIGHT WITH NO PROBLEMS. OPERATED NORMALLY REMINDER OF FLIGHT. CHECKED ENGINE IN ACCORDANCE M/M 71-00-00 PASDR UPS01836018Container · damagedINSPECTION TYPE:N/A DEPARTURE, ESCAPE SLIDE FELL OUT WHEN FWD ENTRY DOOR CLOSED. DEFERRED SLIDE CONTAINER DUE TO DAMAGE.SDR RRXA11230Doubler · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO FLOOR BEAM AT STA.1560 AND LBL50, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM51-1-20D ANSDR RRXA11229Fitting · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO FITTING AT STA.1230 AND L33R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-20D.SDR RRXA11228Fitting · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO SPLICE FITTING AT STA. 447-453 AND L30R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-SDR RRXA11227Gusset · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO GUSSET AT STA.440-460 AND L30R-L31R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-20SDR RRXA11226Doubler · puncturedDURING A MAINTENANCE VISIT FOUND PUNCTURE DAMAGE TO NR 4 ENGINE O/B T/R COWL INNER HEAT, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-20D AND DC-8 MM 78-31-10 FIG.80SDR RRXA11225Intercostal · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO B-PIT INTERCOSTAL AT STA.620 AND L33L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, SDR RRXA11224Fitting · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO MAIN CABIN R/H CUSP FITTING AT STA.1180, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-20SDR RRXA11223Splice · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO B-PIT FITTING SPLICE AT STA.450 AND L33L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM51-1-21SDR UPS01836146Fitting · crackedINSPECTION TYPE:C1 AFT PIT FS 1160, L36-L35 BATHTUB FITTING IS CRACKED. REMOVED DAMAGED FITTING, FABBED SPLICE ANGLES, ALODINED AND PRIMED. INSTALLED NEW FITTING AND SPLICE ANGLES IAW DC8 SRM 53-2-0, 51-1-8, 51-1-20D.SDR RRXA11222Doubler · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TOGALLEY BASE AT STA.70 AND LBL24, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21 AND SDR RRXA11221Angle · gougedDURING A MAINTENANCE VISIT FOUND GOUGED DAMAGE TO RT O/B FLAP PANEL, LT HINGE ANGLE AT STA.410, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21 AND DWG 5761745-39.SDR RRXA11220Fitting · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO INTERCOSTAL FRAME ATTACH FITTING AT STA.1240 AND L33R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DCSDR RRXA11219Angle · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO R/H FWD UPPER CORNER OF FWD R/H SERVICE DOOR, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51SDR RRXA11218Doubler · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO UPPER FWD CORNER OF FWD R/H SERVICE DOOR, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-2SDR RRXA11217Seat Track · wornDURING A MAINTENANCE VISIT FOUND WORN DAMAGE TO MAIN CABIN SEAT TRACK SCALLOPS AT STA.338 AND LBL45, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SDR RRXA11216Angle · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO AFT ACCY COMPARTMENT FLOOR BEAM AT STA.1640 AND LBL32, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IA
Back to Douglas DC-8-73F