Douglas DC-9-32
Service difficulty reports · 12,755
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC932' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC932' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR CA980424015Oven · malfunctioned(CAN) ELECTRICAL FUMES DETECTED ON CLIMB-OUT. ELECT FIRE DRILL CARRIED OUT. GALLEY POWER SWITCHED OFF. SMELL DISSIPATED WITHIN ONE MINUTE. GALLEY OVEN 16 FOUND TO BE THE CAUSE. FAULTY RECEPTACLE CHANGED.SDR CA980417014Switch · failed(CAN) DURING TAXIING OUT FOR TAKEOFF, SMOKE AND FIRE OBSERVED COMING FROM OVERHEAD ELECTRICAL PANEL IN COCKPIT. EMERGENCY EVACUATION DRILL CARRIED OUT AND PORTABLE FIRE EXTINGUISHER DISCHARGED INTO FIRE AREA AND FIRE EXTINGUISHED. MAINTENANCE INVESTIGATION RSDR ABXA9800276Fitting · crackedDURING C-CHECK, FOUND LONGERON 29R FITTING CRACKED AFT OF STATION 604. REPLACED FITTING IAW DC9 SRM 51-30-5.SDR 9805889942Epr Indicator · failedAS TAKEOFF POWER WAS APPLIED, THE LEFT ENGINE EPR INDICATION FROZE AT 1.5. CREW ABORTED TAKEOFF AND RETURNED TO THE GATE. MAINTENANCE REPLACED THE LEFT ENGINE EPR INDICATOR, OPERATIONAL CHECK OK.SDR 9805039942Transmitter · malfunctionedAS TAKEOFF POWER WAS APPLIED, THE LEFT ENGINE EPR INDICATION FROZE AT 1.7. CREW ABORTED TAKEOFF AND RETURNED TO THE GATE. MAINTENANCE REPLACED THE LEFT ENGINE EPR TRANSMITTER, ENGINE OPERATIONAL CHECK OK.SDR VJ9800341Support · corrodedREMOVED AND REPLACED 3 CORRODED FLOOR (LEVEL 2) SUPPORTS IAW SRM 51-30-2 FROM STA 200 BL 0 TO BL 57 RT. FLOOR SUPPORTS FABRICATED FROM 60-2576 7075 T6 EXTRUSION IAW DC-9 SRM 51-1-2, 51-1-4, 51-10-3.SDR VJ9800334Floor · corrodedCORROSION ON FLOOR PANEL AT AFT ENTRANCE (LEVEL 2). FABBED NEW FLOOR PANEL AND HAT CHANNEL SUPPORTS, TREATED, PRIMED FLOOR PANELS AND HAT CHANNELS. INSTALLED NEW AND USABLE ORIG HAT CHANNELS TO NEW FLOOR PANEL AT AFT ENTRANCE.SDR VJ9800329Floor · corrodedREMOVED CORRODED AREA OF FLOOR PANEL WEB STA 180-200 BL 0 TO BL 44 LT. CORROSION LEVEL 2. FABRICATED AND INSTALLED REPAIR DOUBLER IAW SRM 53-01 FIG 4.SDR VJ9800137Frame · corrodedBULKHEAD FLANGE ABOVE FS 220, LONGERON 30, CORRODED. REPAIRED IAW DC9 SRM 53-03, FIG 2A, SHEET 5, AND 51-10-2A.SDR VJ9800114Sub Floor · corrodedSUB FLOOR FS Y119-Y148, X12R-58R, Z=0, CORRODED BEYOND LIMIT IAW DC9 SRM 53-01, FIG 1. FABRICATED, TREATED AND INSTALLED SUB FLOOR IAW DC9 SRM 51-10-2, 51-10-3, 51-30-2.SDR VJ9800113Support · corrodedFLOOR SUPPORT UPPER FLANGE FS Y160-Y200, X0, CORRODED. REMOVED, FABRICATED, TREATED AND INSTALLED REPLACEMENT IAW DC9 SRM 51-10-1, 51-10-4, 51-10-3, AND 51-30-2.SDR VJ9800112Sub Floor · corrodedSUB FLOOR WEB FS Y200, X0-22L, CORRODED. REMOVED DAMAGED SECTION, FABRICATED, TREATED AND INSTALLED REPLACEMENT IAW DC9 SRM 51-10-2, 51-10-3, AND 51-30-2.SDR VJ9800111Support · corrodedFLOOR SUPPORT UPPER AND LOWER FLANGE FS Y196, X0-44L, CORRODED. REMOVED, FABRICATED, TREATED AND INSTALLED IAW DC9 SRM 51-10-2, 51-10-3, 51-30-2.SDR VJ9800110Sub Floor · corrodedSUB FLOOR WEB SKIN CORRODED FS Y220, X8L. REMOVED, FABRICATED, TREATED AND INSTALLED REPLACEMENT WEB IAW DC9 SRM 51-10-2, 51-10-3, AND 51-30-2.SDR VJ9800109Sub Floor · corrodedSUB FLOOR FS 160 TO 220, 55L TO 55R, FWD LAV CORRODED. FABRICATED AND INSTALED NEW SUB FLOOR IAW DC9 SRM 51-10-2, 51-10-3, AND 51-30-2.SDR VJ9800108Support · corrodedCHIPNUT FS 200, BL X0, CORRODED. REMOVED DAMAGED FLOOR SUPPORT, FABRICATED, TREATED AND INSTALLED REPLACEMENT IAW DC9 SRM 51-10-2, 51-10-3, AND 51-30-2.SDR VJ9800107Sub Floor · corrodedFWD LAV SUB FLOOR AT FS 160 TO 220, 55L TO 55R, CORRODED. FABRICATED AND INSTALLED NEW SUB FLOOR IAW DC9 SRM 51-10-2, 51-30-2, AND 51-10-3.SDR VJ9800106Longeron · corrodedLONGERON 30 UNDER SPLICE FITTING AT FS 317 AND FS 325 CORRODED. REMOVED AND REPLACED IAW DC9 SRM 53-02, FIG 18.SDR VJ9800105Jamb · corrodedAFT CARGO DOOR JAMB BETWEEN FS Y900-934, L28R, CORRODED. LOCATED, DRILLED, TREATED AND INSTALLED NEW SECTION DOOR PAN IAW DC9 SRM 51-30-1, 51-30-2, 53-04, FIG 44, AND 51-10-4.SDR VJ9800103Fitting · corrodedLONGERON 30 SPLICE FITTING FS 317 AND FS 325 CORRODED. REMOVED AND REPLACED FITTING IAW DC9 SRM 53-02, FIG 18.SDR ABXA9800275Fitting · crackedDURING C-CHECK, FOUND LONGERON 29L END FITTING CRACKED AFT OF STATION 604. REPLACED END FITTING IAW DC9 SRM 51-30-5.SDR ABXA9800274Frame · crackedDURING C-CHECK, FOUND FRAME AT STATION 980 AND LONGERON 16L AND 17L CRACKED AT HI-LOK. REPAIRED IAW DC9 SRM 53-03.SDR ABXA9800273Skin · corrodedDURING C-CHECK, FOUND FUSELAGE SKIN AT STATION 439 BETWEEN LONGERON 30 AND LONGERON 29L BULGED AND CORRODED BEYOND LIMITS. REPAIRED SKIN IAW DC9 SRM 53-04.SDR ABXA9800272Longeron · corrodedDURING C-CHECK, FOUND LONGERON 16R CORRODED AT STATION 965. REPAIRED LONGERON IAW DC9 SRM 53-02.SDR ABXA9800271Fitting · crackedDURING C-CHECK, FOUND LONGERON 29L FITTING CRACKED JUST FWD OF STATION 579. REPLACED END FITTING IAW DC9 SRM 51-30-1.SDR ABXA9800256Fitting · crackedDURING C-CHECK, FOUND LONGERON 26R END FITTING CRACKED AFT OF STATION 604. REPLACED FITTING IAW DC9 SRM 51-30-5.SDR ABX9800255Fitting · crackedDURING C-CHECK, FOUND LONGERON 28L END FITTING CRACKED AFT OF STATION 604. REPLACED LONGERON FITTING IAW DC9 SRM 51-30-5.SDR 9805139925Control Valve · failedFLAPS INDICATED 5 DEGREES WITH FLAP HANDLE SELECTED UP AFTER TAKEOFF. FLIGHT WAS RETURNED TO MSP AND LANDED WITHOUT INCIDENT. MAINTENANCE REPLACED FLAP CONTROL VALVE AND RIGGED SYSTEM, LEAK AND OPERATIONAL CHECK NORMAL.SDR VJ9800332Floor · corrodedCABIN FLOORBOARD, BETWEEN RT I/B SEAT TRACK AND RT SIDE WALL AT FS 237, FWD WND IS CRACKED AND CORRODED (LEVEL 2) PANEL NR 21. CUT OUT DAMAGED AREA, FABRICATED DOUBLER AND INSTALLED IAW DC-9 SRM 53-01 FIG AND 51-30-3.SDR VJ9800136Support · corrodedFLOOR SUPPORT CORRODED AT STA Y200, X56RH. REMOVED, FABRICATED, TREATED AND INSTALLED IAW DC9 SRM 51-10-1, 51-10-4, 51-10-3 AND 51-3-2.SDR VJ9800101Support · corrodedFLOOR SUPPORT ANGLE FS Y220, X0, CORRODED. FABRICATED AND INSTALLED NEW SUPPORT IAW DC9 SRM 51-10-1, 51-10-3, 51-10-4, AND 51-30-2.SDR VJ9800100Sub Floor · corrodedSUB FLOOR WEB STA 200 TO 220, X44-54R, CORRODED. FABRICATED, TREATED, AND INSTALLED REPLACEMENT IAW DC9 SRM 51-10-2, 51-10-3, 51-30-2.SDR VJ9800099Support · corrodedFLOOR SUPPORT STA Y200, X56R, CORRODED. FABRICATED, TREATED AND INSTALLED NEW SECTION IAW DC9 SRM 51-10-1, 51-10-3, 51-10-4, 51-30-2.SDR VJ9800098Sub Floor · corrodedSUB FLOOR WEBB CORRODED AT STA Y200, X 0-22R, CORRODED. FABRICATED, TREATED, INSTALLED REPLACEMENT IAW DC9 SRM 51-10-2, 51-10-3, 51-30-2.SDR VJ9800097Support · corrodedFLOOR SUPPORT ATTACH ANGLE AT STA Y200, X46-56R, CORRODED. FABRICATED, TREATED AND INSTALLED SUPPORT IAW DC9 SRM 51-10-2, 51-10-3, 51-30-2.SDR VJ9800096Sub Floor · corrodedSUB FLOOR UNDER G2 GALLEY CRACKED AND CORRODED STA Y220-240, X47-57. FABRICATED, TREATED AND INSTALLED NEW SECTION IAW DC9 SRM 51-10-2, 51-10-3, AND 51-30-2.SDR VJ9800055Battery Pack · trippedAFT EMERGENCY LIGHT STUCK ON. RESET THE EMERGENCY HIGH BATTERY PACK. OPS CHECKED GOOD. (X)SDR TWAA9806502Seat Track · corrodedMCI - DURING OP 16 MAINTENANCE CHECK FOUND CORROSION BEYOND LIMITS IN CHAIR TRACK AT STA 570 TO STA 617, LBL 45 IN. REMOVED AND REPLACED SEAT TRACK AT STA 570 TO STA 617, LBL 45 IN, PER SRM 53-05, PG 10G. ACFT TT: 75,041 HOURS. ACFT TC: 81,086. (X)SDR ABXA9800270Fitting · corrodedDURING C-CHECK, FOUND INTERCOSTAL CORRODED IN AFT LOWER CARGO DOOR JAMB POCKET AT STATION 907 AND LONGERON 28R. REPLACED INTERCOSTAL TEE FITTING IAW DC9 SRM.SDR ABXA9800269Longeron · crackedDURING C-CHECK, FOUND LONGERON 29L CRACKED BETWEEN STATION 408 AND 427. REPAIRED LONGERON IAW DC9 SRM 53-02.SDR ABXA9800268Frame · crackedDURING C-CHECK, FOUND FRAME AT STATION 637 CRACKED IN THE LEFT KEEL BEAM ON THE OUTBOARD END. REPAIRED FRAME IAW DC9 SRM 53-03.SDR ABXA9800267Longeron · crackedDURING C-CHECK, FOUND LONGERON 25R CORRODED BETWEEN STATION 130 AND 160. REPAIRED LONGERON IAW DC9 SRM 53-02.SDR ABXA9800266Longeron · crackedDURING C-CHECK, FOUND LONGERON 16L CRACKED AT HI-LOK AT STATION 965. REPAIRED LONGERON IAW DC9 SRM 53-02.SDR ABXA9800257Longeron · corrodedDURING C-CHECK, FOUND CORROSION ON THE UNDERSIDE OF LONGERON 29R AT STATION 869. REPAIRED LONGERON IAW ABX REA D953-23023-MR.SDR VJ9800095Sub Floor · corrodedSTRESS CRACK CORROSION FOUND AROUND RIVET ON SUB FLOOR AT FS 190, X22R. FABRICATED A NEW PANEL, TREATED, PRIMED AND INSTALLED IAW DC9 SRM 551-10-2, 51-10-3, AND 51-30-2.SDR VJ9800094Sub Floor · corrodedSUB FLOOR PANEL AT FS 180 TO 183, X32-42R, CORRODED BEYOND LIMITS. FABRICATED AND INSTALLED NEW FLOOR PANEL IAW DC9 SRM 51-10-2, 51-10-3, 51-30-2.SDR VJ9800093Plate · corrodedINBOARD SIDE OF LIFE VEST PLATE AT NR 4 GALLEY CORRODED BEYOND LIMIT IAW DC9 SRM 53-01 FIG 1. FABRICATED AND INSTALLED NEW PLATE IAW DC9 SRM 51-10-2 AND 51-30-1.SDR VJ9800092Skin · corrodedSKIN UNDER FWD ADF LOOP ANTENNA CORRODED BEYOND LIMITS. REMOVED DAMAGED AREA, FABRICATED FINGER DOUBLER, EXTERNAL DOUBLER, AND FILLERS IAW EO 12-5311-29B1190. PRIMED AND INSTALLED REPAIR IAW DC9 SRM 51-10-3B, 51-30-1 AND 51-30-2.SDR VJ9800091Cusp · corrodedCUSP FITTING AT AFT END OF R1 DOOR, FS 195 TO 205, BL 55 TO 61R, CORRODED. REMOVED CORRODED SECTION CUSP FS 165 TO 229, FABRICATED SPLICE DOUBLER AND SPLICED NEW SECTION OF CUSP IAW DC9 SRM 53-05 FIG 55 SHEET 4.SDR VJ9800090Jamb · corrodedAFT PIT LOWER DOOR JAMB FRAME PANEL CORRODED BEYOND LIMITS IAW DC9 SRM 53-01 FIG 1 SHEET 3. FABRICATED, TREATED, PRIMED AND INSTALLED NEW PANEL IAW DC9 SRM 51-10-3 AND 51-30-2.
Back to Douglas DC-9-32