Query with SQL
duckdb -csv -c "SELECT s.stc_number, s.description, s.holder, s.status, s.status_date FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' s WHERE s.stc_number IN (SELECT stc_number FROM 'https://openairdocs.org/data/latest/faa_stc_model.parquet' WHERE model_key = '24') ORDER BY s.status = 'Current' DESC, s.stc_number"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT s.stc_number, s.description, s.holder, s.status, s.status_date FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' s WHERE s.stc_number IN (SELECT stc_number FROM 'https://openairdocs.org/data/latest/faa_stc_model.parquet' WHERE model_key = '24') ORDER BY s.status = 'Current' DESC, s.stc_number
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
STC SA00179WIInstallation of pressure dome provision for an infrared scanner in the camera door.STC SA01213CHInstall air ambulance conversion in accordance with Spectrum Aeromed Inc. Drawings as listed on AML SA01213CH, or later FAA approved revision.STC SA01452CHInstallation of an air ambulance conversion kit.STC SA02532ATInstallation of subject Michelin tires on appropriate aircraft. For Michelin 5, 6, 8, and 10-inch rim diameter tires on General Aviation Aircraft.STC SA1170CEStretcher installation in cabin area.STC SA1170GLExcept Model 55: Install Egan Aviation air ambulance stretcher P/N 125 using installation kit P/N 803, inverter/pump kit No. 808, 809, or 810. For Model 55, install air ambulance stretcher P/N 125 using installation kit P/N 804, medical oxygen system kit P/N 807, inverter/pump kit No. 808, 809, or810.STC SA1418SOReplacement of rotor vanes in Airborne 211CC and 212CW vacuum pumps. (See limitations)STC SA157NEInstallation of Graphic Engine Monitor System Model GEM-602 S/N 403 and GEM-603 S/N001126and subsequent.STC SA1639GLInstall air ambulance conversion.STC SA1670SWInstallation of engine thrust reversers.STC SA1746SWInstallation of Ray Electronics Model 7107 battery fault warning system.STC SA175RMReplacement of throttle knob, Model EP-004, for 20 series Learjet equipped with Dee Howard thrust reversers.STC SA1952SOInstallation of Appalachian Access. stainless steel brake discs, P/N 75-43.STC SA1RMInstallation of cargo restraint systemSTC SA2304SWReplacement of plunger type landing gear squat switch with rotary type switch.STC SA2557NM (1 OF 2)Installation of KS Avionics EGT/CHT-2( ) combined exhaust gas and cylinder head temperature monitoring system.STC SA2622NMInstallation of Precise Flight Pulselite Control Unit in landing/taxi system. (767-200 B17) (DHC-8 101)STC SA2657SWModification of air conditioner motorSTC SA2661SWInstallation of Ray Model 7507A battery monitoring systemSTC SA2726SWInstallation of 6-pole rotary squat switches.STC SA2788SWInstallation of tail-stringer antenna housing.STC SA2861SWAddition of Hydro seal fluid additive to nose and main gear shock struts.STC SA2876WEInstallation of vertical tail floodlights on the horizontal stabilizer.STC SA3001SOInstallation of Appalachian Accessories, stainless steel brake discs, P/N 75-43.STC SA30GLInstallation of electronic engine synchronizer system.STC SA3249WEInstallation of dual Collins ADF Systems.STC SA3264WEInstallation of Global GNS-500A VLF navigation system.STC SA3328WEInstallation of flight data recorder Sundstrand Model FA542.STC SA36NWInstallation of Sundstrand Ground Proximity Warning SystemSTC SA3899WEInstallation of Collins F1S-84 Flight Instrument System.STC SA4059NMInstallation of emergency medical system.STC SA4060NMInstallation of emergency medical system.STC SA412CEInstallation of Woodward Electronic Engine synchronizer system.STC SA4218WEInstallation of Radio Corporation of America Primus-300SL Color Weather Radar System.STC SA4403NMInstallation of third attitude indicator that meets the requirements of FAR 121.305(j).STC SA4999NMInstallation of lifeport patient loading and support system.STC SA5159NM (1 OF 2)Installation of chip detector system.STC SA5581SWInstallation of ALCOR true-flow/ totalizer systemSTC SA639ALInstallation of Model EP-110 starter/generator decoupler system on Models 23, 24, 25 airplanes using Bendix Model30B-37 starter generators.STC SA644CEInstall drift sight provisions. Limited to installation on Learjet model 24, serial number 124.STC SA944NWInstallation of the XR Drag Reduction SystemSTC SA996EAInstallation of Shaw Aero fuel filler cap P/Ns 457-2, -266, -370, 431, -9R, -125, -1251.STC ST00016WIInstallation of Electric Floorboard HeatersSTC ST00361DEInstallation of Puritan Bennett or B/E Aerospace Sweep on 2000 or Zodiac Intertechnique EROS crew oxygen mask.STC ST00462LAModification of the engine exhaust system.STC ST00738WIIncreased service life. Data required.STC ST00814WILanding Gear Life Extension.STC ST00835DEInstallation of Automatic Dependent Surveillance - Broadcast (ADS-B) Out and In functionality using the Garmin GTX 335R and GTX 345R Transponders plus qualified position sensorSTC ST01138DEInstallation of MidContinent MD23 standby altimeter and/or attitude indicatorsSTC ST01195WIInstallation of Rosemount Pitot/Static Probes, altimeters, and associated equipment in Learjet 20 series aircraft to obtain Reduced Vertical Separation Minimum approval.
Back to Learjet 24