What was found
AFTER T/O ON CLIMBOUT, ENG NR 1 STRUT OVERHEAT LITE ON. RAN CHKLST. ENG AT IDLE FOR 3 MIN LITE REMAINED ON. SHUTDOWN ENG PER CHKLST. AFTER 5 MIN LITE STILL ON. PULLED FIRE HANDLE AS PRECAUT. 2 MIN LATER LITE OFF. WINDMILL 20 MIN OIL PRESS 43. REMD PNLS TO STRUT AREA. RAN NR 1 ENG PER JRH & LEAKING FROM CLAMP AT HEAT EXCHANGER INLET. TIGHTENED CLAMP & SECURED PANELS. RAN ENG & LITE OK UNITL ENG SHUTDOWN & NR 1 ENG STRUT LITE CAME ON STEADY & REMAINED ON. SUSPECT BAD LOOP. NR 1 ENG OIL FILTER REPLACED & RAN ENG FOR 5 MIN PER 72-00. NR 1 ENG STRUT O/H LITE REMAINS ON. LOOP OR WIRING AT FAULT. NO CONTAMINATION FOUND NR 1 ENG. REMOVED & REPLACED NR 1 ENG STRUT O/H DET LOOP PER MM 26-11-31. OPS CK GD.