What was found
THE MANUFACTURED DATE IS JAN. 2001 WITH 619 HOURS. TWO SPOTS OF CORROSION WERE FOUND UNDER THE SUPPORT CLAMPS. THE CROSSTUBE WAS REPLACED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
THE MANUFACTURED DATE IS JAN. 2001 WITH 619 HOURS. TWO SPOTS OF CORROSION WERE FOUND UNDER THE SUPPORT CLAMPS. THE CROSSTUBE WAS REPLACED.