Service difficulty report · Duct Crossover · Fokker F28MK1000

Difficulty date
June 2, 1996
Submitted
March 26, 2000
Operation
Air carrier
Make and model
Fokker F28MK1000
Engine
Rroyce SPEY55515
Part
Duct Crossover
Condition
Liberated
Location
Nr 1 Eng
Part time
27,531 hours
Stage of operation
TO
Nature of condition
O
Precautionary procedure
C, D

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) REJECTED TAKEOFF DUE TO INSUFFICIENT POWER FROM #1 ENGINE. INSPECTION FOUND THE OUTER CROSSOVER DUCT ATTACH POINT HAD PULLED OUT OF THE BYPASS DUCT. REPLACEMENT ENGINE INSTALLED. ENGINE GROUND RUN SERVICEABLE AND AIRCRAFT RETURNED TO SERVICE.

More about the Fokker F.28 MK 1000