Service difficulty report · Pitot Tube · Cessna 750

Difficulty date
October 29, 2004
Submitted
November 1, 2004
Operation
Air carrier
Aircraft
N953QS
Make and model
Cessna 750
Aircraft serial
7500153
Aircraft time
3,472 hours, 2,113 cycles
Part
Pitot Tube
Condition
Obstructed
Stage of operation
TO
How discovered
O
Nature of condition
J
Precautionary procedure
C

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

ABORTED TAKEOFF AT LESS THAN 80 KTS DUE TO AMBER FADEC REV ADC R CAS MESSAGE. OPERATED AIRCRAFT & NOTED NO FAULTS FOR A OR B FADEC. ENTERED MAINT PAGE & CHECKED LOGGED FAULTS. ONE FAULT CODE OF 3106 LISTED, ADC SENSOR MISCOMPARE FOR 30 OCT 04. ACCOMPLISHED TASK 73-50-00-810-835 OF AE3007C PROCEDURE TO IDENTIFY P2.5 SENSOR DRIFT. BOTH P2.5 SENSORS CHECKED GOOD. INSPECTED PITOT TUBES & FOUND RT DRAIN HOLES PLUGGED, CLEARED OBSTRUCTION & WATER DRAINED FROM PITOT LINE. CYCLED PITOT/STATIC HEAT & DRIED TUBES COMPLETELY. OPERATED SYSTEM & AIRCRAFT IAW 750 MM CHAPTER 71-00-04.

More about the Cessna 750