Service difficulty report · Pitot Tube · Cessna 750

Difficulty date
October 28, 2008
Submitted
October 29, 2008
Operation
Air carrier
Aircraft
N950QS
Make and model
Cessna 750
Aircraft serial
7500050
Aircraft time
8,886 hours, 5,638 cycles
Part
Pitot Tube
Condition
Obstructed
Stage of operation
TO
How discovered
O
Nature of condition
C, J
Precautionary procedure
C

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

ON TAKEOFF ROLL AT 65 KTS, MASTER CAUTION "YD OFF LWR" EICAS MESSAGE. ABORTED T/O. INSPECTED PITOT TUBES; FOUND RT PITOT TUBE PLUGGED FROM A MUD DOBBER. REMOVED RT PITOT TUBE, CLEANED DEBRIS, REINSTALLED AND COMPLETED PITOT/STATIC SYS LEAK CHECK IAW FAR 91.411 AND TRANSPONDER INTEGRATION CHECK IAW FAR 43, APPEND E, PARA C ON 10-28-08. PITOT TUBE REMOVED AND INSTALLED IAW MM 34-11-01. SYS CHECK NORMAL.

More about the Cessna 750