What was found
YELLOW ELE"AIL" TRIM ON MAIN MASTER WARNING PANEL ILLUMINATED IN FLIGHT WHEN ELEVATOR TRIM WHEEL POSITION OUTSIDE OF TAKEOFF RANGE. FOUND THAT WIRING WAS TERMINATED WITH SIZE 8 LUGS. TERMINAL POST IS A SIZE 6 STUD AND THEREFORE A SIZE 6 TERMINAL LUG SHOULD BE USED. RETERMINATED LT WOW WIRING WIRE FOR WIRE WITH THE PROPER SIZE 6 TERMINAL LUGS. APPLIED ACFT POWER AND PERFORMED THE ELEVATOR OUT OF TRIM ANNUNCIATOR FUNCTIONAL TEST-CHECKED GOOD WITH NO DEFECTS NOTED. WORK PERFORMED IAW MM 27-30-00. PERFORMED THE AILERON OUT OF TRIM ANNUNCIATOR FUNCTIONAL TEST-CHECKED GOOD WITH NO DEFECTS NOTED. WORK PERFORMED IAW MM 27-10-00