Service difficulty report · Terminal · Cessna 750

Difficulty date
October 25, 2009
Submitted
November 3, 2009
Operation
Air carrier
Aircraft
N962QS
Make and model
Cessna 750
Aircraft serial
7500126
Aircraft time
8,649 hours, 5,279 cycles
Part
Terminal
Condition
Loose
Location
Te Flaps
Stage of operation
CL
How discovered
O
Nature of condition
F, J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FLAPS FAIL CAS MESSAGE DURING TAKEOFF, RAN CHECKLIST,WOULD NOT RESET UPON LANDING,FLAPS STARTED WORKING AGAIN, FAULT CODE 2 AND 8. RIGGED RT FLAP SYSTEM RESOLVER AND SECURED CONNECTIONS ON TERMINALS X1 AND X2 OF THE FLAP RETRACT RELAY KZ090. FLAP SYSTEM OPS CHECK GOOD. WORK PERFORMED REF MM 27-50-00.

More about the Cessna 750