Service difficulty report · Strut · Gulstm 200

Difficulty date
March 10, 2012
Submitted
March 12, 2012
Operation
Air carrier
Aircraft
N729QS
Make and model
Gulstm 200
Aircraft serial
118
Aircraft time
5,159 hours, 3,207 cycles
Part
Strut
Condition
Damaged
Location
Nlg
Stage of operation
CL
How discovered
O
Nature of condition
E, J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

WHEN NLG RETRACTED, HEARD A LOUD THUMP. SOUNDED ALMOST LIKE A BASEBALL BAT HITTING A BASEBALL. AT THIS TIME RECEIVED BOTH RT AND LT PITOT HEAT AND TAT PROBE HEAT AMBER MESSAGES. MESSAGES WENT OUT WHEN PROBE HEAT SWITCH IS TO OVERIDE, BUT MESSAGES ILLUMINATE WHEN SWITCHED BACK TO AUTO. CLOCK NEVER STARTED WORKING UNTIL LOWERED GEAR. WHEN LANDING, WHEN NOSE GEAR CONTACTED RUNWAY HIT SOUNDED LIKE THERE WAS NO GIVE IN THE STRUT WITH A THUNKING NOISE. IT WAS ROUGH TAXIING IN AS WELL. REPACKED NLG SHOCK ABSORBER AND REINSTALLED SHOCK ABSORBER IAW MM 32-20-10. OPS AND LEAK CHECKED GOOD. PERFORMED PROBE HEATING TEST IAW MM 30-30-00. OPS CHECKED GOOD.